Sinotrans moves 7,500-ton hotel: sets record for world's heaviest building transport using SCHEUERLE SPMT
The assignment not only required a large number of axle lines for the high unit weight, but also electronically coupled and controlled modules due to the unequal load distribution. The specialist transport company distributed the load of the hotel on 254 axle lines; and a total of 15 Power Pack Units (PPU) drove the vehicle combination.