Goldhofer PST/SL-E 8 heavy duty module in action for Kiel Canal Waterways and Shipping Authority
The PST/SL-E self-propelled module towing the ferry on the upper cradle ashore Previously, the vessels weighing up to 130 t, were maneuvered onto a shiplift consisting of a lower and upper cradle, which was winched ashore and along the rails leading to the shipbuilding hall.
Published on:
17 April 2023
Published in: Lifting & Specialized Transport u2014 March - April 2023
Share:
We Value Your Comment




