MMRC starts production of high vibration booted blocks

This type of tracks which are being used for the first time in India will absorb vibrations up to 22 Vibration Decibels (Vdb) over and above the vibrations absorbed by normal Metro tracks. It is also best suited for a city like Mumbai where there are heritage structures, congested areas and sensitive receptors like hospitals, schools, colleges, studios etc. The two machines will cast 12,000 Sleeper Blocks every month to meet the requirement of a total of 2,01,600 blocks for the entire project. "The boots are the most crucial part of tracks in ensuring lesser vibrations and smoother ride for the commuters. To ensure performance production is being supervised by the Swiss experts from," said S. K. Gupta, Director (Projects), MMRC.
Published on:
20 November 2020
Share:
We Value Your Comment




