DMRC launches 5th bridge on Yamuna River under Phase-IV

DMRC
The Delhi Metro has begun construction work on the fifth bridge across the Yamuna river under phase four expansion of the Pink Line, which will witness the corridor extending from Majlis Park to Maujpur. The bridge will connect the Soorghat Metro station and the Sonia Vihar Metro station on the corridor, and is being built between two existing bridges – Wazirabad bridge and Signature bridge. The 560 metres long corridor is expected to be opened by the middle of 2024.

The Delhi Metro has already built four bridges across the Yamuna in the first three phases, including the Yamuna Bank Bridge on the Blue Line, a bridge at Nizamuddin for the Pink Line, a bridge at Kalindi Kunj for the Magenta Line and one at Shastri Park for the Red Line but this will be the first bridge to be built using the cantilever construction method. A cantilever is a rigid structural element which extends horizontally and is supported at only one end. Cantilever construction allows the construction of overhanging structures without additional support structures.