Dilip Buildcon Secures Rs 307 Cr Railway Infrastructure Project from ISC Projects

The scope of work includes earthwork through filling and cutting, blanketing, construction of minor bridges, drainage systems, protection works, P-way track linking, and supply and transportation of P-way materials. It also covers ballast supply, construction of service buildings, goomties, workshop sheds, heavy repair sheds, bogie shops, stores, and road works, along with circulating area development, abrasion-resistant granolithic flooring, ballast-less track beams, GDR pathway work, and structural steel and metalizing work.
The project is related to the Barpali Loading Bulb at Kusara, under the jurisdiction of the Deputy Chief Engineer (Construction), Jharsuguda, Chakradharpur Division, South Eastern Railway, and is to be completed within 24 months.
This new order reinforces Dilip Buildcon’s strong execution capabilities and growing presence in India’s railway infrastructure sector, supporting the government’s focus on expanding and modernising rail connectivity.
Published on:
30 October 2025
Share:
We Value Your Comment




