Cabinet Approves ₹4,500 Cr Greenfield Highway from JNPA to Chowk
The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, has approved the construction of a 6-lane access-controlled Greenfield High-Speed National Highway from JNPA Port (Pagote) to Chowk (29.219 km) in Maharashtra. The project, to be developed under the Build, Operate, and Transfer (BOT) mode, has an estimated cost of ₹4,500.62 crore.

This highway aims to enhance connectivity to JNPA Port and Navi Mumbai International Airport, addressing growing container traffic. The project aligns with the PM Gati Shakti National Master Plan, which focuses on integrated infrastructure development and improved road connectivity to major ports.
Currently, it takes 2-3 hours for vehicles to move from JNPA Port to the arterial Golden Quadrilateral (GQ) section of NH-48 and Mumbai – Pune Expressway due to heavy congestion in urban areas like Palaspe Phata, D-Point, Kalamboli junction, Panvel with traffic ~1.8 Lakh PCU/day. After the operationalization of Navi Mumbai airport in 2025, the need for direct connectivity is expected to increase further.
Accordingly, this project is designed to address these connectivity requirements and for improving the logistic efficiency of connecting JNPA port and Navi Mumbai International Airport.
The project alignment starts at JNPA port (NH 348) (Pagote village) and ends at Mumbai-Pune Highway (NH-48) while also linking Mumbai Pune Expressway and Mumbai Goa National highway (NH-66).
Two tunnels passing through Sahayadri are provided for ease of movement for commercial vehicles instead of ghat section in hilly terrain ensuring high speed and ease in movement for large container trucks.
The new 6 lane green field project corridor will lead to better port connectivity help in safe and efficient freight movement. The project will open new avenues of growth, development and prosperity in developing regions in and around Mumbai and Pune.