NMDC Invites Tender for Blast Furnace Gas Pipeline at Nagarnar Steel Plant

NMDC

NMDC has floated a tender for installing a blast furnace (BF) gas pipeline and a gas mixing station, along with associated piping for the mixed gas heating system (MGHS) of the coke oven battery (COB) Phase-II. The project will be executed on a turnkey basis at NMDC’s upcoming 3 MTPA integrated steel plant at Nagarnar, near Jagdalpur in Chhattisgarh. This tender marks a significant step in NMDC’s plan to develop advanced infrastructure that ensures efficient energy utilization at the plant.

NBM Media

30+ years of reporting on infrastructure, construction, architecture, & real estate across print, digital, and social media.