NHAI invites bids for road linking Gurgaon-Mumbai expressway

Mumbai expressway
To accelerate the construction work for the extension of Gurgaon-Mumbai expressway to DND Flyway in Delhi, NHAI has bid out first two packages from DND to Ballabhgarh where the work is scheduled to complete by mid-2023. NHAI will build an 8-km long 6-lane flyover between DND to Jaitpur along the Yamuna and the second package from Jaitpur to Ballabhgarh (25 km) via the existing bypass with six-lane signal-free stretch. These two stretches will have six-lane service roads for local traffic and the third package from Ballabhgarh to Sohna (26 km), which is a greenfield stretch, will be awarded soon. The construction work on the Sohna-Mumbai stretch is in full swing and the first stretch from Sohna to Dausa is scheduled for completion by November next year. Works have been awarded for about 1,000 km out of the 1,250 km. The expressway to DND will provide relief to commuters in the NCR and users can take this road towards Agra and Jaipur. A new link would also be approved to provide direct connectivity from the expressway to Jewar airport. According to the Chairman, NHAI, S S Sandhu, the agency will push ₹5,000 crore as equity in the SPV, which will raise ₹40,000 crore as a loan to be repaid from toll revenue.

NBM Media

30+ years of reporting on infrastructure, construction, architecture, & real estate across print, digital, and social media.