BMRCL fast tracks Bommasandra-RV Road metro corridor

BMRCL
BMRCL has hastened construction work on the Namma Metro’s Bommasandra -Central Silk Board section of the metro corridor, which is destined to be commissioned by June 2023. It is a part of Yellow Line (19-km elevated Bommasandra-RV Road) and will be opened in two phases: Bommasandra to Central Silk Board section by June 2023 and Central Silk Board RV Road by December 2023.