L&T wins tunnelling contract from RVNL in Uttarakhand
The construction arm of L&T has secured a contract for heavy civil infrastructure business from Rail Vikas Nigam Limited (RVNL) for Package 4 of the New Broad-Gauge Line between Rishikesh and Karanprayag in Uttarakhand. The scope of work includes the construction of tunnels, formation, construction shaft, and other ancillary works from Chainage 47+360 to 63+117 km. The project also involves the construction of 14.577 km up line and 13.123 km down line tunnel with embankments of about 800 meters at both ends. Out of 14.577 km and 13.123 km of tunnel, 10.49 km and 10.317 km of tunnel will be excavated using two new hard rock Tunnel Boring Machines (TBMs) of diameter 9.1 meters and the balance using New Austrian Tunnel Method (NATM). The work includes the construction of an Ellipsoidal-cum-Ventilation Shaft in the finished cross-section of 79 square meters and a depth of 32 meters. This will be the biggest TBM to be deployed in the Himalayan region in India and the TBM bored tunnel length of 20.807 km will be the longest for any project in the Himalayan belt. The entire project is to be completed within a period of 60 months. The rail line will not only facilitate easy access to Uttarakhand's pilgrimage sites, but also enable the development of backward areas, connect new trade centres, and serve the resident population. Director & Senior Executive VP (Civil Infrastructure), S. V. Desai, informed that the company is already constructing Package 2 of this project involving 24 km of tunnel with the NATM, minor bridges and formation works.
📅Published on:
22 January 2021
🔗Share:
We Value Your Comment
⭐How useful is this information?
Submitting...
03
Thanks for your rating! ✌️ We’d love to hear more - share your thoughts by leaving a comment
Allcargo Logistics Limited has announced its initiative to enable FMCG companies to navigate increasingly fragmented inventory flows through integrated,
GHV Infra Projects Limited has secured a road construction and civil works contract worth Rs 815 crore from APCO Infratech Private Limited in Maharashtra.
JCB India announced the inauguration of a new facility of its dealer, Caculo Earthmovers in Karaswada, North Goa, further strengthening its presence in the
The Godhra–Vadodara section of the Delhi–Mumbai Expressway has been completed and opened for traffic on a trial basis from April 13, 2026, according to the
The Rajasthan State Industrial Development and Investment Corporation will invest Rs 1,200 crore to upgrade infrastructure across more than 450 industrial
Dubai has completed its first air taxi station near Dubai International Airport, marking a major step toward launching electric air mobility services later
Informa Markets in India is gearing up to host the 23rd edition of Roof India, Asia’s premier exhibition for roofing and allied products, from 23–25 April 2026
NBM Media
30+ years of reporting on infrastructure, construction, architecture, & real estate across print, digital, and social media.