
The proposed wall will be built between the Magazine Road drain and the Old Railway Bridge, a key monitoring point along the Yamuna during the monsoon. The project aims to strengthen flood protection along the identified stretch, although its effectiveness will depend on the final design and integration with the surrounding drainage and flood-control infrastructure. The government has not yet specified a completion timeline.
The proposal follows repeated flooding along the river. In July 2023, the Yamuna reached a record level of 208.66 metres at the Old Railway Bridge, significantly exceeding the danger mark of 205.33 metres. The flooding inundated residential areas and roads, forcing thousands of people to leave their homes. In 2025, the river again crossed the danger mark, prompting evacuations from low-lying areas.
Biomining projects to address drain silt disposal
The Flood Control Board also granted in-principle approval to three biomining projects worth Rs 260 crore to scientifically process and dispose of silt removed during drain desilting operations.Silt frequently accumulates along drain banks and nearby roads after cleaning. During rainfall, the material can wash back into drains, obstructing water flow and reducing their capacity to carry stormwater. The proposed projects are intended to address this recurring problem, with the Najafgarh drain and other major drains expected to benefit.
Plans to develop drain corridors as public spaces
The board also discussed plans to transform neglected stretches along Delhi's drains into public spaces, drawing on the approach adopted for the Barapullah drain development. The proposals include walkways, green belts, plantation, lighting and protective fencing along drain banks.The initiative aims to improve the surroundings, enhance public safety and discourage encroachment.