
The project involves the design, engineering, procurement, construction, testing and commissioning of a 41.09 km road stretch connecting Sultanganj, Bhagalpur and Sabour. The contract has been awarded on a lump-sum EPC basis at an estimated cost of Rs 3,400 crore.
The construction is scheduled to be completed within 42 months and is expected to significantly improve regional connectivity along the Ganga corridor, strengthening road infrastructure in eastern Bihar.