CCI Group Invests ₹227 Crore in Grade-A Logistics Park at Sohna-Silani, Gurugram
CCI Group, an integrated logistics service provider, has announced a total investment of ₹227 crore for the development of a Grade-A warehouse facility at Sohna-Silani in Gurugram. Spanning approximately 9.5 lakh square feet, this project is aimed at meeting the growing demand for high-quality industrial and warehousing spaces in the region. The site lies just a few kilometers from several of the country’s most vital expressways, including the Delhi-Noida-Direct (DND) Flyway, Mumbai-Delhi Expressway, Kundli-Manesar-Palwal (KMP) Expressway, Western Peripheral Expressway (WPE), and Kundli-Ghaziabad-Palwal (KGP) Expressway. This robust connectivity enables seamless access to major consumption centers across Delhi NCR, Gurugram, Noida, Faridabad, and even parts of Western Uttar Pradesh and Rajasthan.

“Leveraging its strategic location, CCI Group’s Sohna-Silani logistics park will serve a diverse range of industries, including e-commerce, retail, FMCG, automotive, manufacturing, and third-party logistics. It will ensure faster turnaround times, lower operating costs, and improved last-mile efficiency,” said Satish Sharma, Executive Director, CCI Group.
Designed to cater to the increasing demand for scalable warehousing infrastructure, the facility features a clear height of 12 meters, FM2-grade flooring, cross-dock multiple loading points, and wide internal RCC roads for efficient vehicle circulation. Its modular layout and flexible design enable customization according to the operational needs of varied tenants.
In addition to core infrastructure, the facility places strong emphasis on sustainability and safety. It is solar-ready and integrates passive ventilation systems, ample natural lighting, energy-efficient LED fixtures, rainwater harvesting, and green landscaping—reflecting CCI Group’s commitment to environmentally responsible development. A dedicated Sewage Treatment Plant (STP) ensures zero water waste, with treated water repurposed for landscaping and utility needs, including fire safety systems.The facility is equipped with robust firefighting infrastructure, including water and foam-based sprinklers and fire hydrants, reinforcing both environmental efficiency and operational safety through a holistic, future-ready approach.
The total project cost covers land acquisition, construction, and infrastructure development. The project is expected to generate over 300 direct jobs during the construction phase, along with more than 250 indirect employment opportunities in logistics operations, security, and support services. “CCI Group also intends to collaborate with local authorities to introduce skill development initiatives in areas such as sustainable construction, industrial operations, and site management,” Sharma added.