BMRCL floats tenders for ₹1,905-cr elevated corridor

Bangalore Metro Rail Corporation
Bangalore Metro Rail Corporation has floated tenders for the Bengaluru Metro Rail Project Phase-2B part of the metro project. The scope of work includes the construction of elevated structures (viaduct & stations) of length 15.011 km from Ch 21,500.000 mtr to 36,511.000 mtr, two elevated metro stations like Bettahalasuru & Doddajala, road widening utility diversion and allied works of Bengaluru Metro Rail Project. The length includes about 718.18 mtr cut and cover portion in front of Yelahanka Air Force Station entailing an investment of ₹620.88 crore. Construction of elevated structures (viaduct & stations) of length 11,678 km from Ch 10,072.00 mtr to 21,500.000 mtr & five elevated metro stations including Hebbal, Kodigehalli, Jakkur Cross, Yelahanka & Bagalur Cross including 250 mtrs, pocket track, road widening, utility diversion and allied works of Bengaluru Metro Rail Project (Phase 2B/P2/69(b)) for a cost of ₹645.3 crore. Construction of elevated structures (viaduct & stations) of length 11.003 km (including 281.000 mtr of viaduct beyond Phase-2A) from Ch 0.000 mtr to 10,072.000 mtr and eight elevated metro stations viz, Kasturi Nagar, Horamavu, HRBR Layout, Kalyan Nagar, HBR Layout, Nagawara, Veerannapalya and Kempapura including 650.00 mtrs link line connectivity to Baiyappanahalli, road widening, utility diversion and allied works of Bengaluru Metro Rail Project (Phase 2B/P1/69(a) at a cost of ₹639.95 crore.