
The project involves the design and construction of a 15.1-km elevated viaduct covering two stretches: Botanical Garden to Noida Sector-142 and Depot Station to Boraki. The scope also includes the construction of 10 elevated metro stations, along with architectural finishes.
The extension is expected to improve regional connectivity and commuter access across Noida’s expanding urban areas. The project is scheduled for completion within 36 months.