
The project, awarded by a KP Group company, involved HDD-based cable laying, installation of HDPE pipes, optical fibre cable laying, jointing works, testing and commissioning. The execution was completed within the targeted timeline while maintaining quality and safety standards.
The completed underground cable network is expected to support power transmission infrastructure in the region, reflecting the company’s growing capabilities in executing complex utility and energy projects.