Chambal Cable Stayed Bridge Connecting Shores

Arezki Touat, Senior Engineer-Systra Paris, Serge Montens, Director of Bridge Department-Systra Paris and Jean Charles Vollery, Civil Works Director-Systra Asia Pacific and Chief Executive of Systra-Mva Consulting (India Pvt. Ltd.)

the bypass of Kota (RJ), as part of the NHDP Phase II project

Introduction

For the bypass of Kota (RJ), as part of the NHDP Phase II project; NHAI has planned to make the NH-76 cross the Chambal River. Since this crossing was falling in the “Chambal gavial wild life sanctuary,” it was decided to cross the river width of about 300m with a single span, and hence reduce crocodile wild life disturbance by avoiding any pier in the river bed.

📅 Published on: 29 December 2008
📖 Published in: NBM&CW September 2008
🔗 Share:
We Value Your Comment
How useful is this information?
In reply to Some User

NBM Media

30+ years of reporting on infrastructure, construction, architecture, & real estate across print, digital, and social media.