Kirby Executes MRF Medak Plant in Record Time
PCR Z-2 and Z-3
The project has been estimated with due care for all technical specifications and was checked for perfections by senior design management to avoid any ambiguity for design finalization. The project was completed within budget. The elegant design contributed to complex PEB requirement. Pipe Sections are used for bracing System for most efficient & economical solution. Over 150 numbers of long heavy jack beams are used to avoid intermediate columns as per the functional requirement.
No comments yet, Be the first one to comment on this.
ITD Cementation: Offshore Construction Challenges in Udangudi Coal Berth
A new port is under construction at Udangudi (district of Tuticorin) in Tamil Nadu, India to serve a Thermal Power project. The project involves creation of a 555 m long and 25 m wide berth for coal handling which is located
ArcelorMittal Projects Supply HZM Solution for Oxagon Port Phase-1 NEOM
NEOM, a visionary project, is set to become Saudi Arabia's primary economic and industrial hub. Within the NEOM development, the Oxagon project is a groundbreaking endeavor, poised to become the world's largest floating structure.
Determination of Cement Content for Soil-Cement Stabilization
At the onset of any Construction project, it is essentially required to evaluate the properties of founding media in order to assess its suitability. In some cases where founding media do not exhibit the required characteristics, ground improvement
Ground Improvement for Mumbai Coastal Road Project Package-1
The Mumbai Coastal Road Project Package 1 includes the construction of a 3.82 km long 8-lane road section over reclaimed land. To create green spaces, in the congested city, an area of approximately 75 hectares from the sea is reclaimed