L&T wins multiple construction contracts

larsen and toubro
Adding to its project portfolio in the Buildings & Factories (B&F) segment, the construction wing of the Larsen and Toubro, has secured a prestigious order from DRDO to construct their Flight Control System Facility at ADE, Bengaluru. The project involves construction of a 1.2 Lakh sq. ft facility consisting of ground + 6 Floors in an extremely fast track timeline of 4 months. The project will demonstrate L&T's technological expertise in Modular Offsite Construction with Composite Truss Beam technology that will be used for the Structure as 90% of the building components will be manufactured off site except for the foundations. The structure will have Composite Structural Steel and the building enveloped with a facade. The interiors comprise 100 mm false flooring and modular wall partitions with false ceilings. The toilets will also be constructed off site as Fully Finished Toilet PODS (Portable on Demand Storage). In addition, the company‘s Metallurgical and Material Handling wing has been awarded an EPC order for 12 MTPA Dry Circuit Systems on a turnkey basis for a Screening Plant (SP-Ill) from NMDC Limited at their Kirandul Complex, Chhattisgarh. The scope of work includes Tertiary Crushing, 2-stage Screening, Stacking, Reclaiming and Dispatch of Iron ore along with the associated Civil, Structural, E&I and other auxiliary facilities. This plant will be one of the largest Iron Ore Handling plants and aims to ensure uninterrupted Iron Ore supply for different customers of NMDC. The MMH has also bagged add on contracts from its existing customers.

NBM Media

30+ years of reporting on infrastructure, construction, architecture, & real estate across print, digital, and social media.