BMRCL tests open web girder stability with sandbag load

BMRCL
Ensuring structural stability, the Bengaluru Metro Rail Corporation Limited (BMRCL) has conducted a load test on the Open Web Girder (OWG) above the railway track between Baiyappanahalli and Benniganahalli metro stations. During testing, a six-coach train loaded with sandbags, simulating full passenger capacity, was stationed on the OWG for about three and a half hours. The testing process would continue for seven days.
📅 Published on: 16 August 2023
🔗 Share:
We Value Your Comment
How useful is this information?

NBM Media

30+ years of reporting on infrastructure, construction, architecture, & real estate across print, digital, and social media.