
The project will feature a three-hour battery storage system with a power capacity of 300 MW and an energy storage capacity of 900 MWh. It will store surplus renewable energy during periods of high generation and release it during peak demand, supporting clean-energy utilisation, grid stability and power supply reliability.
The BESS will use liquid-cooling technology to improve power density, safety and operating life. The facility is expected to enhance grid flexibility and support the integration of renewable energy into India's power network.
The order strengthens L&T's presence in the energy storage sector and adds to its portfolio of renewable energy infrastructure projects.