I-System: Index of Ground-Structure

The I-System is developed to compensate demerits of existing engineering classifications including their limitations, drawbacks, impreciseness, and inaccuracy. It is applicable for rock and soil with acceptable precision and accuracy with simplicity in use and is developed for challenging projects in varieties of ground and verified for perfectness. It is based on certain key indices, which define mechanical behaviour of surrounding ground of structure considering impact of dynamic forces as well as excavation technique impact.
H Bineshian, Principal, Technical Director, Amberg Engineering AG, Australia

I-System


An optimised geotechnical/geomecha- nical design approach includes empirical, analytical, seismic, and observational stages. Empirical and observational parts of a design are vital in initiation of the approach and in finalisation of judgements for practice and design purposes containing the derivation of ground behaviour, identification of ground hazards, determination of support systems, and characterisation of ground’s mechanical properties. Engineering classifications are main part of empirical and observational stages of the design for human made structures in ground; though, they have limitations in application. I-System is a classification as well as a characterisation system for ground that is developed to cross the limitations involved with other classifications. It is comprehensively applicable for civil, mining, and oil & gas structures in ground including but not limited to abutments of bridges and dams, caverns, deep and shallow foundations, embankment and tailing dams, galleries, deep and shallow metro stations, mine stopes, open pits, shafts, slopes, trenches, tunnels, underground spaces and storages, wells, etc. It considers easily derivable geohydrological, geomechanical, geometrical, geophysical, geostructural, geotechnical, and dynamic properties and configuration of ground in relation to the structure together with the method of excavation and construction. It is first published in 2019 based on 22 years’ research and verification in design and construction of underground, semi-surface, and surface works in rock and soil; however, since then further developments as well as improvements and clarifications are made. This paper provides the latest edition of I-System (as a full package) and an introduction to I-System Software.

Introduction

Design approach for structures in ground includes 4 important stages as shown in Figure 1 (Bineshian et al, 2019). The design methodology should pass empirical, analytical, seismic, and observational procedures to get the optimised design badge of “good for construction” while empirical and observational parts are playing very crucial role and determinative factors for this purpose. Both parts are quite depended on ground’s engineering classification and characterisation.

Design procedure is presented in Figure 2 based on the design approach. Figure 2a demonstrates a well-defined design procedure and Figure 2b shows the data requirements in a design setting. As a brief definition, Ground Zoning (GZ) is based on ground inherent properties that divides entire length of a tunnel to a group of limited numbers of zones or stretches with similar properties. It eases the identification of ground behaviour and related hazard/s, determination of required support system, procedure of structural dimensioning, and finally verification of the required measures for each zone. GZ is the first stage in design procedure, which is conducted after completion of initial geotechnical/geomechanical investigation in initial phase of study. Empirical classification systems are the important element in identification of GZs.

I-System


Second and third stages in a healthy design procedure are identification of the Ground Behaviour (GB) and associated Ground Hazard/s (GH) respectively. Russo and Grasso (2007) proposed an approach to identify excavation behaviour based on continuum equivalent and equilibrium models; however, in this paper, it is produced for continuum and discontinuum media by combined analytical and empirical modelling as principal concept in identification of GB (Figure 3a). As can be seen in Figure 3a, classification systems are used in empirical analysis for identification of GB. Figure 3b represents the same by a fully empirical approach using I-System (Figure 3b) as a classification and characterisation system (Bineshian, 2019a, 2019b).

I-SystemFigure 3: Flowcharts representing two ways to identify the GB; stress analysis and I-System


Figure 4 represents most expected Ground Hazards (GH) from the identified GB that should be considered within the design procedure (Figure 2a).

I-SystemFigure 4: Ground Hazards (GH) expected from the identified GB

In the fourth stage of a design procedure (Figure 2a), Support System/s (SS) should be selected from choices of solutions required for each GZ and related GB and GH. Again, the need for a comprehensive and suitable classification system is recognised to be vital to find the best solution/s for each mechanical response and associated hazard/s.

Further to selection of suitable solution/s as SS for each GH, the measures (either primary or final SS) should be dimensioned (calculation part of design approach; fifth stage in Figure 2a) and verified (defining the relative safety margins; last stage of design approach in Figure 2a).

Probabilistic Convergence-Confinement method (e.g., Carranza-Torres, 2004) can be used for Structural Dimensioning (SD). In Structural Verification (SV), Limit State Design (LSD) that known as Load and Resistance Factor Design (LRFD) method is used (McCormac, 2008). LSD itself has two procedures in design verification; Ultimate Limit State (ULS) and Serviceability Limit State (SLS). ULS includes checking against generated bending moment, axial forces, and shear forces (EN 1990:2002 E). On the other hand, SLS checks the generated crack width in the structure (e.g., crack width < 0.30 mm as per IS 456:2000). Figure 5 illustrates the SV procedure as the last stage in a design procedure (Figure 2a) required for plain or reinforced concrete structure (for primary or final SS).

I-SystemFigure 5: Structural Verification (SV) check


As per design procedure and requirement explained here, it is proved that engineering classifications are the main part of the empirical and observational design elements in a healthy design approach and design procedure shown in Figures 1 and 2 (Bineshian, 2012, Bineshian and Ghazvinian, 2012a and 2012b). Comprehensiveness and practicality of the engineering classifications are essential to make them appropriately applicable in NATM, NMT, SEM, SCL, etc.; however, existing engineering classifications come with limitations in use for both rock and soil.

Limitations, inaccuracy, and imprecision involved with existing classifications make engineers uncertain in determination and dimensioning of structures specially when they encounter ground complications (Bineshian, 2014, Bineshian, 2017, Bineshian et al, 2019). RMR and Q are popular existing classifications developed by Bieniawski (1973) and Barton et al (1974) respectively. They are only applicable for rock medium. RMR is proposed for surface and underground works but its water pressure consideration is doubtful, quantification of joint orientation is uncertain, and the effect of water on rock mass is inattentive (Bineshian et al, 2013). Q is proposed for tunnels merely, which comes with several limits in input parameters including discontinuity’s aperture, orientation, persistency, size, and rock strength. Palmstrom and Broch (2006) stated that there is a shortcoming in most existing classifications when observed rock mass characteristics are used to estimate the conditions for design without including input of the excavation method. An excavation damage factor or similar should be applied, but none of the existing empirical or other tools in rock engineering makes use of this (Palmstrom and Broch, 2006).

I-System is developed to be used as a comprehensive classification and characterisation system for ground (Bineshian, 2019b). It is verified against varieties of ground and scrutinised in several projects through 22 years of research to address and resolve the aforesaid issues involved with existing classifications (Table 1). I-System provides prediction of ground behaviour together with recommendations on required Support System/s (SS), Excavation Technique/s (ET), Instrumentation Technique/s (IT), Prevention Technique/s (PT), and Forecast Technique/s (FT) followed by Design Remark/s (DR) as well as estimation for important mechanical properties of ground. Its output is optimised by analytical, numerical, and observational methods to compensate the demerits of existing classifications and strengthen its comprehensiveness.

This paper is a 2021 edition of I-System in a full package, which is further developed by providing vibration-induced damage (ViD) assessment methods, pull length advisor, and systematic bolting calculator. It provides further illustrations, details, clarifications, and updates to I-System as well as introducing I-System Software as a design utility that eases the use of I-System while expected accuracy is obtained in calculation.

I-System: Definition

Providing a solution to engineers in their challenges with complicated ground conditions is the key perception and approach in development of this all-in-one classification and characterisation system for ground in accord with real condition to deliver design parameters and practical recommendation/s. Also, it has been in mind to provide a trusted utility for empirical part of design. In development of this system, drawbacks and limitations of other classifications (e.g., RMR and Q) are properly addressed and consequently resolved (Bineshian, 2019a, 2019b). This comprehensive classification and characterisation system for ground (rock and soil) entitled “Index of Ground-Structure” or in short form “I-System”. It is conceptually different from any existing classifications due to its applicability for varieties of ground conditions and structures and its comprehensiveness in providing accurate and precise prediction of ground behaviour based on several geomechanical hazards (failure mechanisms) studied in course of development. Its range of application (Figure 6) in design and/or practice includes underground structures (caverns, deep or underground metro stations, exploration and grouting galleries, mine stopes, shafts, tunnels of any type or method, underground spaces, underground storages, wells, etc.), semi-surface structures (bridge abutments, dam abutments, deep foundations, shallow metro stations including open- cut and cut & cover, etc.), and surface structures (embankment dams, open pits, shallow foundations, slopes, tailing dams, trenches, etc.).

I-SystemFigure 6: Range of application of I-System


It is the first ever classification, which is applicable for both rock and soil that considers ground’s problematical and structural configurations, opening’s scale effect, earthquake’s negative effect, and excavation technique’s impact (Figure 7a). Besides, it is the first ever classification that carefully provides prediction for special ground behaviour including but not limited to Squeezing, Swelling, and Heaving (SSH), Time Dependent (TD), Visco-elasto Plastic (VP), fully plastic, gravity driven (GD), and Burst Prone (BP) condition (Figure 7b).

I-SystemFigure 7: Most important features covered by I-System


I-System is verified in a wide varieties of challenging ground conditions to ensure that a suitable estimation is obtained in classification and characterisation. It provides recommendations on determination of primary and final SS, required ET for encountered condition, proper IT for monitoring, appropriate PT against possible failures, verified FT to predict the ground condition ahead, and practical DR that is helpful in understanding of ground behaviour, failure mechanism, and load configuration (Section 4). Moreover, it characterises the ground by deriving the mechanical properties (Section 5) that can be used as input for SD in design procedure.

I-SystemFigure 8. I-System calculation; indices and impact factors

It is intended that I-System to have key indices to enable an appropriate modelling of ground-structure behaviour to the full (Figure 8). It includes five indices to define the mechanical response of ground in relation to the structure. Furthermore, it has two impact factors to define the impact of Dynamic Forces (DF!) and Excavation Technique (ET!) on structure. Indices and impact factors in I-System (Figure 8) are based on easily derivable main properties (i.e., key geomechanical, geostructural, geohydrological, geotechnical, geophysical, and geometrical features; Figure 2b) and determinant seismic and excavation factors that affecting the ground-structure response (Figure 7a).

Eq 1 represents I-System in a mathematical form entitled “(I)”. Eq 2 to 8 defines the indices and the impact factors for (I) as follows:

(I) = (A! + C! + H! + P! + S!) × DF! × ET!        (1)

A! = (a"# + a"$ + a"!) × a"% × a"" × a"& × a"'        (2)

C! = c'( × c$(        (3)

H! = h)( × h)$        (4)

P! = 3p(( + p"( + 5p'$ × p'*67 × p+, & p+, = ƒ(V', V$)        (5)

S! = s($ × s$-        (6)

DF! = ƒ(PGA./, ERZ, MSK) & PGA./ = ƒ(PGA, SF, MSF)        (7)

ET! = ƒ(ET, PPV)        (8)

where;

(I) I-System’s value

A! Armature Index

C! Configuration Index

H! Hydro Index

P! Properties Index

S! Strength Index

DF! Dynamic Forces Impact

ET! Excavation Technique Impact

I-System’s value ranges between 100 – 0 and classifies the ground-structure interaction to 10 classes as (I)-01 to (I)-10 from best to worst class. The indices of A!, C!, H!, P!, and S! have 20 per cent share out of a total score of 100. DF! and ET! are factors ranging between 1 – 0.75 and 1 – 0.50 respectively, which impact the summation of indices (Figure 9). Indices are defined in the Section 3. Full definition of the parameters is available in Section 10.

I-SystemFigure 9: I-System’s scoring diagram


I-System is applicable for estimation of quality of ground in relation to the structure at any scale and type. It assists with empirical and observational parts of the design approach (Figure 1). I-System is applicable in design procedure and/or in practice (Figures 2 and 3) for:

  • categorizing the ground properties in relation to Ground Zoning (GZ),
  • discovering Ground Behaviour (GB),
  • identifying associated failure mechanism/s (Figure 4) as Ground Hazard/s (GH),
  • determining the required Support System/s (SS); Section 4, and
  • assisting in Structural Dimensioning and Verification (SD and SV) by characterizing the most important mechanical properties of ground (Section 5).

It is also applicable to (Tables 9 - 12 in Section 4):

  • find the appropriate technique/s for excavation further to the determination of the required support system/s (ET),
  • select suitable option for instrumentation/monitoring during construction (IT),
  • implement the proper technique for prevention of hazard/s (PT), and
  • designate the required technique for forecasting/prediction (FT).

I-System is developed to serve the above-stated purposes for underground, semi- surface, and surface structures in the field of civil, mining, and oil and gas.

Indices and Impact Factors

I-System (Eq 1) includes 5 indices and 2 impact factors (Figures 8 and 9) with mathematical form of Eq 2 to 8. In this section all associated parameters of each index are defined in details. Derivation of parameters from ground and their use in I-System is confusion-free; consequently, selection of the input data is certain, which makes the classification’s output accurate and credible. Section 10 provides a complete list of definitions for abbreviations, parameters, and short forms used in this paper.

Armature Index

A! is the Armature Index (Eq 1 and 2) as ground’s skeleton armature, which is intended to model the most important geomechanical aspects of rock mass as a ground medium through the discontinuity properties of ground. A! has 20 score out of 100 (Figure 9). Table 2 defines parameters of A!.

I-System


It should be noted that, if “adn” and “ads” are zero, the score for “adi” to be assigned as zero; it happens when the number of discontinuities is ≥ 25 and number of discontinuity sets is ≥ 4. It means that the inclination for the most unfavourable or critical discontinuity set is not easily derivable. In this case, the medium tends to be homogeneous and isotropic due to generated uniform texture – by presence of high number of discontinuities as well as discontinuity sets – that is subject to mechanical response related to continuum mechanics’ principles.

Moreover, if the medium is soil mass, “n/a or Granular” to be selected for each parameter from Table 2; otherwise, for rock (intact or mass) the suitable parameter other than “n/a or Granular” to be selected.

Configuration Index

I-System

C! is the Configuration Index (Eq 1 and 3) as ground’s problematical and structural configuration that contains important problematical geostructural features of rock and/or soil. C! has 20 score out of 100 (Figure 9). Table 3 defines parameters of C!.

In selection of right description for “Problematical Configuration” in Table 3, if the medium is jointless like intact rock or if it is granular like soil mass, “Homogeneous or Isotropic or Jointless or Granular” to be picked. Furthermore, to select “Structural Configuration” correctly, if ground contains unlayered and structurally interlocked rock mass rather than layered one or it contains intact rock, “Continuum Massive Rock” to be picked.

Hydro Index

H! is the Hydro Index (Eq 1 and 4) as hydro effect on ground’s mechanical behaviour and its hydro related properties. It is a function of GCD (Ground Conductivity Designation; Appendix 1, Bineshian, 2020a) or Wetness diagram (Figure 10) and softness due to presence of water (in scale of Mohs). H! has 20 score out of 100 (Figure 9). Table 4 defines parameters of H!.

GCD provides a quantitative measure for “Ground Conductivity”. If GCD test is not used then observational ground water condition to be considered as a criterion for scoring the “hgc” using the Wetness diagram (Figure 10) in conjunction with Table 4. GCD is listed in Table 4 inside the parenthesis “( )”.

I-System


Wetness diagram provides a qualitative description for “Ground Conductivity” based on observational identification for ground’s hydraulic conductivity. It classifies the ground wetness into 11 ranges from dry to water burst. Wetness diagram is listed in Table 4 inside the brackets “[ ]”. It is the choice of designer, engineer, or geologist to use GCD or Wetness diagram as per site condition.

Properties Index

P! is the Properties Index (Eq 1 and 5) as ground shear properties by way of a definition as a function of texture, fabric, shape, and size of soil materials together with body wave velocity. P! is considered to be an important part of I-System to model essential geotechnical characteristics of ground as part of the comprehensiveness of the system in applicability for varieties of ground, which in this index, it is the soil medium. P! has 20 score out of 100 (Figure 9). Table 5 defines parameters of P!.

I-System


As it is stated in the footnote of Table 5, “Body Wave Velocity” can be derived from reliable references or it can be measured using geophysical surveying method/s. It is recommended to use the geophysical technique/s to derive Vp and/or Vs; however, it is not compulsory to measure “Body Wave Velocity” by conducting geophysical surveys when conduction of measurement is not feasible or practicable. Besides, it should be noted that either Vp or Vs can be used in selection of proper value for “Pbw” in Table 5.

Furthermore, to clarify the term “Rock” in Table 5, it should be selected if the ground is intact rock or rock mass, but if the medium contains conglomerate or breccia with poor matrix that stone pieces are easily detached from the matrix, options other than “n/a” and “Rock” to be chosen.

I-SystemFigure 10: Wetness diagram

 

Strength Index

S! is the Strength Index (Eq 1 and 6) representing ground’s strength behaviour under confining condition. Due to importance of this index in I-System, key parameters of both ground and structure are considered to define this index. In definition of S!, unconfined compressive strength of ground, scale effect, shape factor of the structure, and stress ratio between vertical and horizontal virgin stresses at the location or depth of placement of structure is considered. S! has 20 score out of 100 (Figure 9). Table 6 defines parameters of S!.

In Table 6, a wide range of strength from below 29 KPa to over 200 MPa is considered to cover varieties of very weak soil to very strong rock. Higher range of strength is given in MPa while ranges below 1 MPa is given in KPa that makes the strength values more expressive.

I-System


Derivation of “sse” for underground structure from Table 6 requires two steps:

  1. Select matching shape or “Scale Effect” range based on B/H.
  2. Pick the proper “sse” from either σv ≥ σh column or σv < σh column.

Derivation of “sse” for surface or semi-surface structure from Table 6 is as follows:

  1. Select the proper range for “Scale Effect” based on B/H.
  2. Pick the proper “sse” from the associated column.

Dynamic Forces Impact

DF! is the Dynamic Forces Impact (Eq 1 and 7) on the ground-structure behaviour that represents effect of earthquake. Table 7 defines values of DF! as a function of Scaled Design Peak Ground Acceleration (PGASD), Earthquake Risk Zone (ERZ), or Medvedev-Sponheuer-Karnik (MSK) Scale (Medvedev and Sponheuer, 1969). If PGASD is selected to be used for derivation of DF!, it should be scaled by designer (Eq 9) that may require the ground motion time history data to produce the time-acceleration curve; consequently, scaling factor (SF) to be calculated using the PGA derived from the curve and the desired PGA; accordingly, the time-acceleration plot is scaled. This is a simple procedure that designers who performs dynamic response spectrum analysis are familiar with. Magnitude Scaling Factor (MSF) is another way for scaling the desired PGA; Eq 10 (Idriss, 1999) is an example that is derived for cohesionless soils; however, similar relationships (Idriss and Boulanger, 2008, 2010, Boulanger and Idriss, 2014) for cohesionless soils or any other reliable MSF relationships for cohesive soils may be used for derivation of MSF. When PGASD is produced, Table 7 to be used to pick the associated value of DF!; otherwise, if use of ERZ or MSK is preferred, subsequently the earthquake zoning map for project area from reliable references to be used for determination of ERZ or MSK and then related DF! to be picked from Table 7. ERZ is categorised in 7 classes of damage risk zones as shown in Table 7; EH (MSK XI-XII), VH (MSK IX-X), H (MSK VII-VIII), M (MSK V-VI), L (MSK IV), VL (MSK III), and EL (MSK I-II). DF! ranges between 1.00 to 0.75 (Figure 9).

I-System


SF = PGASD ÷ PGA & PGASD = SF × PGA        (9)

MSF = 6.9 × e7!"8 # − 0.058 ≤ 1.8 & PGASD = MSF × PGA       (10)

where;

M Moment Magnitude of Earthquake

MSF Magnitude Scaling Factor

PGA Peak Ground Acceleration (g); maximum ground acceleration during earthquake PGASD Scaled Design Peak Ground Acceleration (g); scaled desired PGA

SF Scaling Factor

PGASD, ERZ, or MSK are the choices of designer, engineer, or geologist; their values are listed in Table 7 inside parentheses, brackets, and braces respectively.

Excavation Technique Impact

ET! is the Excavation Technique Impact (Eq 1 and 8) on the ground-structure behaviour representing vibration impacts on structure during the excavation, which is designed to be a function of Excavation Technique (ET) or Peak Particle Velocity (PPV). ET! ranges between 1.00 to 0.50 (Figure 9). Table 8 defines values of ET!.

I-System


Categorization provided in Table 8 for ET and PPV is based on the research and experience of author (Bineshian, 2019a, 2019b) in design and application of engineered blasting and fragmentation techniques in various strata and several projects; however, AS 2187.2 – 1993 is taken into consideration for PPV limits for engineered blasting near important structure/s. This is for the first time that impact of excavation technique is comprehensively considered in a classification and characterisation system. I-System considers it as an impact factor influencing the total value of (I). If PPV is used as criterion for scoring the ET!; therefore, it is recommended to measure it using seismographs; however, it can be estimated using empirical relation proposed by United States Bureau of Mines (Duvall and Fogelson, 1962), which is known as USBM PPV Predictor for estimation of blast-induced ground vibration (Appendix 2); otherwise, type of ET is the criterion to pick the proper score for ET! from Table 8. Vibration- induced Damage (Bineshian, 2021a, 2021b; Appendix 2) assessment is necessary when blasting is used for excavation. Use of ET or PPV in Table 8 for picking the right value for ET!, is the choice of the designer, engineer, or geologist; it can be used as per availability and condition.

In Table 8, for better differentiation, ET values are listed inside parentheses while PPV values are listed inside brackets.

(I)-Class

I- System’s Classification entitled “(I)-Class” includes a hexad output, which is illustrated in Figure 11a. Figure 11b is a representation of table of recommendations of (I)-Class that listed below in full form:

  • Support System/s (SS)
  • Excavation Technique/s (ET)
  • Instrumentation/monitoring Technique/s (IT)
  • Prevention Technique/s (PT)
  • Forecast Technique/s (FT)
  • Design Remark/s (DR) to help in structural dimensioning and verification (SD and SV in Figure 2a).

(I) ranges from 100 to 0 (Figures 9 and 11b). (I)-Class classifies the ground into 10 classes as per the value of (I) from (I)-01 as the best to (I)-10 as the worst ground (Figure 11b). Each class has 10 percent share out of 100. Recommendations for SS, ET, IT, PT, FT, and DR are provided for each class in Tables 9 and 10 for underground, semi- surface, and surface structures. Additionally, (I)-Class provides recommendations for special classes (Special (I)-Class) for particular types of ground behaviour/hazards (GB and GH in Figures 2a, 3, and 4) as (I)-BP, (I)-TD, and (I)-VP in Tables 11 and 12.

I-SystemFigure 11: I-System’s Classification output; (I)-Class


Definition for BP, TD, and VP is recalled here;

BP Burst Prone - ground condition with rock burst or coal burst behaviour

TD Time Dependent - ground condition with time dependent shearing behaviour such as squeezing, swelling, and heaving condition, or even creep VP (Visco-elasto-Plastic) - ground condition as visco-elasto-plastic to fully plastic behaviour that contains elastic component/s together with viscous component/s, which gives the ground strain rate dependence on time; however, due to losing energy during static or dynamic loading cycle, its behaviour converts to fully plastic and may flow like a viscous substance.

Furthermore, ET column in Tables 9 and 11 for underground structures provides advice on pull length (PL), which can be estimated using the proposed method in Appendix 3. Nomenclature for all abbreviations used in this section is provided in Section 10.

I-System


Appendix 5 illustrates some of the measures recommended in the SS and FT columns in Tables 9 and 11, including ADH, BH, BulkH, ConeB, CPS, EC, FaceB, FaceButt, FaceP, FibreD, FP, PH, PR, RDH, SysB SysDB, SysHB, SysLB, SysN, WDH, and YieldB. Definition of these measures is presented in Section 10.

Appendix 6 provides systematic bolting calculation method for bolting parameters (length and spacing) for measures proposed in the SS column in Tables 9 and 11, including ConeB, SysB, SysDB, SysLB, SysN, and YieldB. Definition of these measures is presented in Section 10.

I-System

 

(I)-GC

I-System’s Ground Characterisation entitled “(I)-GC” characterizes the mechanical properties of ground (rock or soil mass) by quantifying most important ground properties including Modulus of Deformation (E"), Poisson’s Ratio (u#), Unconfined Compressive Strength (σ$"), Uniaxial Tensile Strength (σ%"), Cohesion (φ"), and Internal Friction Angle (φ"). Quantified values provided as output of (I)-GC are estimations based on empirical correlations. Figure 12 is a representation of hexad output for (I)-GC.

I-System


(I)-GC’s output (Figure 12) provides most important input values required in design approach and procedure (Figures 1 and 2a) for underground, semi-surface, and surface structures. The mathematical form of (I)-GC’s hexad output is presented in Eq 11 to 16 (Bineshian, 2019b), whereas the graphical form is presented in Figure 13. These empirical equations are developed and examined by author for several cases (Bineshian, 2019b); however, their accuracy may improve by study on further cases.

I-System


E) = e9.9:×(=)-1        (11)

ν) = 0.5 − 0.004 × (I)        (12)

σ() = 0.007 × σ( × e9.9:×(=)        (13)

σ?) = −σ() × e(9.9@×(=)A@)        (14)

C) = 0.002 × σ() × e9.9:×(=)        (15)

φ) = 15 + 0.55 × (I)        (16)

where;

(I) I-System’s Value

E) Modulus of Deformation of ground – rock-/soil-mass (GPa)

ν) Poisson’s Ratio of ground

σ( Unconfined Compressive Strength of intact rock or soil (MPa)

σ() Unconfined Compressive Strength of ground – rock-/soil-mass (MPa)

σ?) Uniaxial Tensile Strength of ground – rock-/soil-mass (MPa)

C) Cohesion of ground (KPa)

φ) Internal Friction Angle of ground (degrees)

Utilisation Guidelines

Utilisation approach of I-System is based on the following steps:

I-SystemFigure 12: I-System’s Ground Characterisation; (I)-GC
  • Stage 1. Derivation of input parameters from a site visit or reference data. Figure 2b demonstrates the data group, which is used in I-System as input.
  • Stage 2. Calculation of indices; A!, C!, H!, P!, S!, DF!, and ET! using the derived data in Stage 1, Eq 2 – 8, and Tables 2 – 8.
  • Stage 3. Calculation of (I) using Eq 1 and calculated indices in Stage 2.
  • Stage 4. Determination of (I)-Class using the calculated (I) value in Stage 3 and Tables 9 – 12. Recommendations for SS, ET, IT, PT, FT, and DR provided in Tables 9 – 12 are applicable in practice.
  • Stage 5. Calculation of (I)-GC; E", u#, σ$", σ%", C", and φ" using Eq 11 to 16 or Figure 13, which is applicable for design.
I-SystemFigure 13: (I)-GC Chart


Figure 14 summarises the utilisation approach explained above in a simple diagram.

I-SystemFigure 14: Utilisation diagram of I-System


An example of I-System calculation for a tunnel is provided in Appendix 7; input parameters for calculation of (I) in Figure 24a, (I)-Class as output of classification in Figure 24b, (I)-GC as characterisation output in Figure 24c, and (I)-GC Charts in Figure 24d. Below, a summary of (I)-Class for the same example is provided as a guide for decoding the recommendations’ script:

(I) = 25 → (I)-08 → Table 9 → Derive recommendations for (I)-08 as follows:

SS - Support System

FP32.200.L.X1/FP76.250.L.X1/PR100.300.L.X1, SysLB32.L.S,

LG32.25.180.1000/RigidR150UC23.1000-,

FRS225/FRC225, FaceButt.L, FRFS200, RDH54.L+CF

ET - Excavation Technique/s

PSE-ME/NonExBreak, PL

IT - Instrumentation Technique/s

3DMS@50m, StrainM@200m, PressC/LoadC@250m, SingleRodE@400m

PT - Prevention Technique/s

Apply FP/PR, Maintain Buttress, Avoid: ‘FF & DnB’

FT - Forecast Technique/s

TSP/PH54.EC.L

Design Remark/s

Passive load configuration, sensitive to ‘scale, unsupported span, & stand-up time’

Tunnel’s largest dimension in a cross section (diameter, width, or height) for above example is 8000 mm; therefore, D = 8000 mm.

Section 10 provides a comprehensive nomenclature that is necessary to be used for decoding of the output of I-System’s classification. I-System’s classification output, namely, (I)-Class that is provided in Tables 9 – 12, should be decoded using Section 10. Accordingly, above output-example is decoded (using Section 10) and interpreted in details as follows:

- SS – Support System to be applied:

- PR100.300.L.X1 or FP76.250.L.X1 or FP32.200.L.X1

(Piperoofing 100 mm dia, 300 mm spacing, L = 0.7D to L = D then L = 5600 to 8000 mm in one row) or

(Forepoling 76 mm dia, 250 mm spacing, L = 0.7D to L = D then L = 5600 to 8000 mm in one row) or

(Forepoling 32 mm dia, 200 mm spacing, L = 0.7D to L = D then L = 5600 to 8000 mm in one row).

Specified length (L) for the piperoofing or forepoling is a function of D (Diameter, width, or height (mm) of underground opening, the greater value), which can be derived from the empirical equation (L = 0.7D to L = D) proposed in Section 10 and Appendix 5. The length between 5600 to 8000 mm to be selected as per condition.

- SysLB32.L.S

(Systematic Long Bolting 32 mm dia, L = 0.7D or L = D × D99A(=) /D99 then L = 5600 to 6000 mm, S = 0.3L = 1700 to 1800 mm).

Specified length (L) and spacing (S) for systematic long bolting as a function of D (Diameter, width, or height (mm) of underground opening, the greater value) can be derived from empirical equations (L = 0.7D and S = 0.3L) proposed in Section 10 and

Appendix 5 or using proposed equations in Appendix 6 (L = D × D99A(=)/D99 and S = 0.3L)

as a function of D and (I). The length between 5600 to 6000 mm to be selected as per condition.

- LG32.25.180.1000- or Rigid R150UC 23. 1000-

(Lattice Girder with 32 mm dia rebar at intrados and two 25 mm dia rebars at extrados with 180 mm spacing between the intrados and extrados and spacing between the LGs below 1000 mm) or

(Rigid Rib made with Universal Column as per Australian Standard of 150UC23 and spacing of below 1000 mm).

- FRS225 or FRC225

(Fibre Reinforced Shotcrete with 225 mm thickness) or (Fibre Reinforced Concrete with 225 mm thickness).

- FaceButt.L

(Face Buttress with L = 0.25D = 2000 mm if D ≥ 6000 mm).

Specified length (L) for buttress as a function of D (Diameter, width, or height (mm) of underground opening, the greater value) can be derived from empirical equation (L

≥ 0.25D) proposed in Section 10 and Appendix 5.

- FRFS200

(Fibre Reinforced Face Sealing with 200 mm thickness).

- RDH54.L+CF

(Radial Drainage Holes 54 mm dia, L ≤ D ≅ 8000 mm + Collar Filtration).

Specified length (L) for radial drainage holes as a function of D (Diameter, width, or height (mm) of underground opening, the greater value) can be derived from empirical equation proposed in Section 10 and Appendix 5 (L ≤ D).

- ET – Excavation Technique/s to be implemented:

- PSE-ME/NonExBreak, PL

(Partial Sequential Excavation using Mechanised Excavation or Non-Explosives

Breaking with Pull Length as PL = 0.5D (=)/D99

then PL = 1000 mm).

Specified pull length (PL) for advance at face as a function of D (Diameter, width, or

height (mm) of underground opening, the greater value) and (I) can be derived from

empirical equation (PL = 0.5D (=)/D99) proposed in Appendix 3.

- IT – Instrumentation Technique/s to be used:

- 3DMS@50m

(3D Monitoring Station at every 50 m).

- StrainM@200m

(Strain Meter at every 200 m).

- PressC/LoadC@250m

(Pressure Cell or Load Cell at every 250 m).

- SingleRodE@400m

(Single-Rod Extensometer at every 400 m).

- PT – Prevention Technique/s to be considered:

- Apply PR/FP (Piperoofing or Forepoling).

- Maintain Buttress.

- Avoid ‘FF (Full Face Excavation) and DnB (Drill and Blast)’.

- FT – Forecast Technique/s to be utilised:

- TSP/PH54.EC.L

(Tunnel Seismic Prediction) or

(Probe Hole 54 mm dia using Exploratory Coring with L = 3D = 24000 mm). Specified length (L) for probe hole using exploratory coring as a function of D (Diameter, width, or height (mm) of underground opening, the greater value) can be derived from empirical equation (L = 3D) proposed in Section 10.

- DR – Design Remark/s to be taken into consideration:

- Passive load configuration, and

- Sensitive to ‘scale, unsupported span, and stand-up time’.

Example provided here in this section is analysed with I-System Software (it is introduced in Section 7 and output of the same is presented in Appendix 7). Further case studies are available in reference number 8 for application of I-System for underground, semi-surface, and surface structures.

Notably, two methods are used for calculation of the length of the Systematic Long Bolting (SysLB), which illustrated in Appendix 5 and fully explained in Appendix 6. It is the choice of designer, engineer, or geologist to select the method that is more compatible with site condition; however, it is recommended to take the greater value between the calculated ones (using illustrations in Appendix 5 or proposed equation in Appendix 6). Same logic is applicable for other calculations for the proposed measures.

I-System Software

A software for I-System is developed in 2020 named “I-System Software” aimed to ease the use of I-System and to ensure high accuracy and precision in calculation procedure for classification as well as characterisation is obtained.

I-System Software uses the same algorithm of I-System (Bineshian, 2019a, 2019b, 2020c) originally published and it works exactly as per the I-System principle using the same formulations, tables, and approaches for classification as well as characterisation of ground in relation to underground, semi-surface, and surface structures.

I-SystemFigure 15: Computation flowchart of I-System Software


I-System Software works as per following flowchart (Figure 15):

  • Type of structure includes underground, semi-surface, or surface in which the classification and characterisation is going to be conducted for.
  • Input data includes the same input data that considered for hand-calculation of I-System (Stage 1 of Section 6). Appendix 7 (Figure 24a) represents a print of the input of the software.
  • Computation includes the Stages 2 and 3 of Section 6, which is the calculation of indices and consequently (I).
  • The output includes (I)-Class and (I)-GC, which is the same as Stages 4 and 5 of Section 6. Appendix 7 (Figures 24b and 24c) represent print of the output of the I-System Software.

(I)-Class’s output (Section 4) includes hexad of SS, ET, IT, PT, FT, and DR that are applicable in practice. The same is the output of the software for (I)-Class shown in Appendix 7 (Figure 24b). (I)-GC’s output (Section 5) includes hexad of E", u#, σ$", σ%", C", and φ" in form of values and chart that are applicable in design as input. Appendix 7 (Figure 24c) shows the same as output of the software for (I)-GC. Besides, I-System Software provides additional output, namely, (I)-GC Chart that is the graphical representation of (I)-GC (Appendix 7; Figure 24d).

Additionally, the software provides GCD calculator that can be used for measurements of ground hydraulic conductivity that is used as input in the software for H! (Hydro Index) or it may be used individually in practice and/or in design for grouting/injection assessment (Bineshian, 2020a). Also, other utilities included in the software that are helpful for a complete classification and characterisation of ground. Summarily, output report or print of the software (Appendix 7) contains full details of input data (Figure 24a); entered by user and processed by the software), (I)-Class details (Figure 24b); computed by the software), and (I)-GC details and charts (Figures 24c and 24d); calculated and plotted by the software). Appendix 7 at the end of this paper provides output of the software for the case, which is solved and decoded in Section 6. I-System Software is an engineering utility for classification and characterisation of ground; however, it is under further development for more applications in design and practice.

Conclusions

I-System is developed to compensate demerits of existing engineering classifications including their limitations, drawbacks, impreciseness, and inaccuracy. It is applicable for rock and soil with acceptable precision and accuracy with simplicity in use and certainty in its approach for derivation of input parameters besides clarity and trust in the output data.

It is developed in challenging projects in varieties of ground and verified for perfectness. There is no limitation/s in its application for any type of underground, semi-surface, and surface structures in rock and soil. It comes with a simple equation containing essential parameters, which can be derived from doubtless input tables, reliable references, or test results. It is based on certain key indices, which defines mechanical behaviour of surrounding ground of structure considering impact of dynamic forces as well as excavation technique impact.

I-System contains two main parts; (I)-Class as classification system and (I)-GC as characterization system.

(I)-Class classifies the ground to 10 classes from the best to the worst, which contains a hexad output as recommendations that is required in practice for execution including; Support System, Excavation Technique/s, Instrumentation Technique/s, Prevention Technique/s, Forecast Technique/s, and Design Remark/s.

(I)-GC provides a hexad output, which is required for design as input including; E", u#,

σ$", σ%", C", and φ".

I-System practically takes into consideration the most important mechanical aspects of ground for an appropriate optimised design. It has the capacity to be a reliable comprehensive classification as well as characterisation system to be utilised in both practice and design for all ground related structures.

Future Research Recommendations

Author recommends following additional researches for further development and improvement of I-System:

  • Scrutinization of indices including their parameters as well as their scorings for a better modelling of each index of ground.
  • Investigation on impact factors and their influence on total value of I-System to obtain better accuracy – if possible – in effect of influencing parameters on (I).
  • Study on impact of important factors of shape, scale, in-situ stresses, and/or overburden, which are already considered in Strength Index to develop – if possible – a more effective method in consideration of these factors.
  • Adding more recommendation/s on required SS, ET, IT, PT, FT, and DR as output of (I)-Class.
  • Work on (I)-GC and their output in characterisation of mechanical aspects of ground for already proposed properties and more parameters by collecting further data in a comprehensive range and varieties of ground for obtaining best fit to derive more accurate correlations.

Nomenclature

(I) I-System’s value

(I)-Class I-System's Ground Classification, which provides recommendations on SS, ET, IT, PT,

FT, and DR that are applicable in practice as well as design for structures in ground

(I)-GC I-System's Ground Characterisation, which provides hexad of E), uE, σ(), σ?), C), and

φ) that are applicable in design as input parameters for design of structures in ground 3DM 3D Monitoring - using Bi-Reflex Target

3DMS 3D Monitoring Station

ada Factor related to “Discontinuity Aperture” that is based on the most unfavourable opening of the discontinuities; a parameter of A!

add Factor related to “Discontinuity Disintegration” that is based on the worst weathering or alteration of surface of the discontinuity sets; a parameter of A!

adf Factor related to “Discontinuity Friction” that is based on the least friction condition of discontinuity sets; a parameter of A!

ADH Axial Drainage Hole/s - NX hole/s (w/- or w/o casing), parallel to axis of tunnel, perpendicular to face; L ≤ 1.5D, S as per site condition

adi Score related to “Discontinuity Inclination” that is based on the dip angle of the most critical/unfavourable discontinuity set; a parameter of A!

adn Score related to “Discontinuity Number/s” that is based on number of individual discontinuities per meter of a horizontal or vertical scanline or average of number of discontinuities per meter of horizontal and vertical scanline; a parameter of A!

adp Factor related to “Discontinuity Persistency” that is based on the most unfavourable discontinuity set; a parameter of A!

ads Score related to “Discontinuity Set/s” reflecting the number of sets of discontinuities; a parameter of A!

A! Armature Index

B Width of a berm in a slope or trench or width or horizontal span of an underground space

B/H Underground, semi-surface, or surface structures’ shape or scale factor as ratio of horizontal span to height of underground opening or ratio of width of berm to height of slope or trench

BH Blind Hole - triangular patterned probing parallel to axis of underground space using blind hole/s; L = 2D and 100+ mm diameter

BP Burst Prone – highly stressed ground condition with rock burst or coal burst behaviour

BRT Bi-Reflex Target - 3, 5, or 7 targets installed in a 3DMS based on severity of convergency

BulkH Bulk Head - shotcrete/concrete plug at whole section of excavation at face to prevent the ground from flowing; L ≤ 0.15D

C Convergency (mm)

c/a Conditionally Applicable

cD Site constant in USBM PPV Predictor

cF Site constant in USBM PPV Predictor

CableL Cable Lacing - applicable for controlling rock burst in deep underground spaces CF Collar Filtration - filtration of drainage holes' outlet to stop debris/fines discharge

Cg Cohesion of ground (MPa)

C! Configuration Index

CommBlast Commercial Blasting (engineered blast near commercial area) ConeB Cone Bolts - oriented/radial cone bolts; L = 0.5D, S = 0.3L

Continuum A massive medium rather than layered one; e.g., intact rock or unlayered and structurally

Massive interlocked rock mass

Rock

cpc Impacting factor related to “Problematical Configuration” of ground indicating ground's tectonic state; a parameter of C!

CPD*%G Maximum charge per delay (kg)

CPS Crown Periphery Spiling - SN umbrella at 5-30 deg; L = 0.7D

csc Score of “Structural Configuration” of ground (an effect of ground's texture, fabric, and structure); a parameter of C!

CtldBlast Controlled Blasting (an ordinary engineered blast for civil works)

CYSS Conventional Yield Support System - a conventional system of yield measures used in tunnelling under SSH condition; it includes TH or H sliding ribs, LSC, and/or LCN

d Depth of placement of the structure

D Diameter, width, or height (mm) of underground opening (the greater value) DD Drilling Depth (mm)

DF! Dynamic Forces Impact

DH Drainage Hole/s - upward NX hole/s (w/- or w/o casing); L = 1.5H, S as per site condition Di Damage Indicator (%); Bineshian (2021a, 2021b)

Di-Class Classification of ViD based on Di

DIC Digital Image Correlation (Bineshian et al, 2021a, 2021b)

Dist The distance between the blasting location and concerned structure (m) DL Drilling Length of blastholes (mm)

DnB Drill and Blast - controlled blast using a designed drilling pattern DR Design Remark/s

DWall Diaphragm Wall

EC Exploratory Coring - single NX hole parallel to axis of tunnel; L = 3D

Eg Deformation Modulus of ground - rock mass or soil mass's deformation modulus (GPa)

ElFootR Elephant Foot Rib – a stiff/rigid rib applicable when vertical load above crown is high

EN European Standard – Eurocode of practice

ERT Electrical Resistivity Tomography - a non-destructive geophysical method for ground characterisation

ERZ Earthquake Risk Zone classifies seismicity to EH (Extremely High), VH (Very High), H (High), M (Moderate), L (Low), VL (Very Low), EL (Extremely Low)

ET Excavation Technique/s

ET! Excavation Technique Impact

FaceB Face Bolting – Fibreglass Dowel/s or SDA bolts drilled parallel to axis to support against face pressure/thrust, perpendicular to face; L = D, S ≤ 0.3L

FaceButt Face Buttress - keeping part of face in place as a buttress to absorb face pressure or thrust as part of face stabilization; L ≥ 0.25D (Only if D ≥ 6 m)

FaceP Face Plug - shotcrete at face to plug outlet of debris discharge; L ≤ 0.05D

f+ Frequency of blast-induced vibration (Hz)

FF Full Face excavation

FibreD Fibreglass Dowel/s - used as FaceB; L = D, S ≤ 0.3L

FP Fore Poling - umbrella using perforated/blind SDA; L = D FRC Fibre Reinforced Concrete

Freezing A pre-excavation solidification for underground, semi-surface, and surface openings

FRFS Fibre Reinforced Face Sealing

FRS Fibre Reinforced Shotcrete

FT Forecast Technique/s

g g-force or peak ground acceleration due to earth’s gravity (m/sec2); 1g = 9.81 m/sec2 GB Ground Behaviour based on mechanical response of ground

GCD Ground Conductivity Designation (Bineshian, 2020a)

GCDe Existing GCD; post-blast measured GCD

GCDp Pre-existing GCD; pre-blast measured GCD

GCef Ground Conductivity Enhanced Factor (Bineshian, 2021a, 2021b) GD Gravity Driven - flowing ground with fully plastic behaviour

GH Ground Hazards based on failure categorisation Rock Intact rock or rock mass

Granular Soil mass (conglomerate and breccia is excluded from this category) GRC Ground Reaction Curve

GZ Ground Zoning based on ground properties

H Height of a slope, trench, opening, or buttress

HCF Half Cast Factor (%)

HEAM High Energy Absorption Mesh - mesh over shotcrete; protective mesh against dynamic or impact loads

hgc Score assigned to “Ground Conductivity” that is measured using GCD or selected from Wetness diagram as criterion for hydropressure effect on ground; a parameter of H!

hgs Impact factor related to “Ground Softness” that is considered as an effect of water on medium/infilling material (Mohs); a parameter of H!

H! Hydro Index

HnB Heading and Benching - an excavation method to control the scale effect on stability

I-System Index of Ground-Structure; a comprehensive classification and characterisation system for ground including both rock and soil media (Bineshian, 2019a, 2019b, 2020c)

IncM Inclinometer/s

IndBlast Industrial Blasting (engineered blast near industrial area)

IndiB Individual Bolting - oriented and in very limited number

InfraBlast Infrastructures Blasting (engineered blast for demolishing infrastructures)

IS Indian Standard - code of practice

IT Instrumentation Technique/s

JetG Jet Grouting - applicable in construction of underground, semi-surface, and surface metro station

Jointless A definition describing an important feature of intact rock; a medium that does not have any countable joint set

L Length of ADH, BH, ConeB, CPS, DH, EC, FaceB, FaceButt, FaceP, FP, PH, PR, RDH, SRH, SysA, SysB, SysDB, SysHB, SysLB, SysN, VPH, WDH, WH, and YieldB (mm)

LCN Longitudinal Compression Niche; applicable in YSS for tunnelling under SSH condition (Bineshian, 2020b)

L(H Length of contour or periphery blasthole (m)

LG Lattice Girder

LH( Length of half-cast or half barrel (m)

L! Length of water injected portion (packed length) of drilled hole (m) or length of casing hole (m) or length of installed perforated SDA (m) in the GCD test procedure

LoadC Load Cell/s

LRFD Load and Resistance Factor Design method

LSC Longitudinal or Liner Stress Controller - rubber/spring/soft-timber/rolled-MSP; it is a member of CYSS for tunnelling under SSH condition (Bineshian, 2020b)

LSD Limit State Design method

M Earthquake Magnitude

ManDigg Manual Digging (small scale excavation without use of explosives or NonExBreak)

MASW Multichannel Analysis of Surface Waves - a non-destructive geophysical method for characterisation of ground

McNally A system for rock burst treatment in tunnelling using TBM

ME Mechanised Excavation (Medium- to large-scale excavation using TBM, Roadheader, Excavator, or Hammer without use of explosives or NonExBreak)

MicroP Micro Piles - distribute concentrated load to a wider footing area under elephant ribs MineBlast Mining Blasting (controlled blast as per mining standards)

MSF Magnitude Scaling Factor

MSK Medvedev-Sponheuer-Karnik Scale classifies seismicity as I to XII MSP Mild Steel Plate

MultiRodE Multiple Rod Extensometer - measuring points @ 2, 4, and 6 m recommended n/a Not Applicable

NATM New Austrian Tunnelling Method; it minimises SS needs based on utilisation of ground capacity in load bearing and activation of load configuration by application of active SS. NATM is applicable for comprehensive range of ground conditions. SCL and SEM are following the same philosophy of NATM.

NMT Norwegian Method of Tunnelling; it is a method in tunnelling using Q for ground classification and cross-hole seismic tomography for further characterisation. NMT is not providing a new philosophy in tunnelling.

NonExBreak Non-Explosive Breaking (ground fragmentation using expansive materials) NX Hole with 54.7 mm diameter

OB Over Break or over cut or over excavation

OC Open Cut

PatchHEAM Patch High Energy Absorption Mesh (protection against dynamic/impact loads) – used in slope protections against rock falls and/or tunnelling under burst prone condition

PatchPS Patch Plain Shotcrete

PatchWeldM Patch Weld Mesh - applicable as protective mesh in underground, semi-surface, and surface openings to prevent spot rock falls

pbw Factor related to “Body Wave Velocity” including Vp or Vs as geophysical properties of ground that corrects P!; Body Wave Velocity is derived either from reliable references (considering the type of materials of ground) or is measured using geophysical methods

pcc Score related to “Cohesiveness Consistency” that is an important shear property of soil (cohesion); a parameter of P!

PCC Plain Cement Concrete

PD Pull Depth

pdc Score related to “Denseness Consistency” that is an important shear property of soil (non-cohesiveness; friction); a parameter of P!

PGA Peak Ground Acceleration (g)

PGASD Scaled Design Peak Ground Acceleration (g); desired scaled PGA

PH Probe Hole - probing using blind hole drilling with 100+ mm diameter or exploratory coring using NX hole/s; L = 2D for BH and L = 3D for EC

P! Properties Index

PL Pull Length (mm) - advance length

P* Peak head (MPa) during injection period of T! in GCD test procedure; it is the measured water pressure before the first drop in peak is observed.

PostG/I Post-excavation Grouting/Injection - consolidation/solidification

ppm Influencing parameter related to “Particles’ Morphology” that is a function of shape of soil's grains/granules; a parameter of P!

pps Influencing parameter related to “Particles’ Size” that is a function of size of soil's grains/granules”; a parameter of P!

PPV Peak Particle Velocity (mm/sec)

PR Pipe Roofing - perforated/blind pipe (w/- or w/o grouting); L = D PreF Pre-Excavation Freezing of face or excavation line/periphery PreG/I Pre-excavation Grouting/Injection - cement/mineral/chemical-base PreS Pre-excavation Splitting

PressC Pressure Cell/s

ProdBlast Production Blasting (controlled blast for rock production in large scale) PS Plain Shotcrete

PSD Partial-Sequential Digging - small scale partial digging in several sequences e.g., small pilots, considering stand-up time and maximum unsupported span

PSE Partial-Sequential Excavation - small scale partial excavation larger than digging scale in several sequences e.g., pilot and enlargement, considering stand-up time and maximum unsupported span

PSFS Plane Shotcrete Face Sealing - application of 50 mm plain shotcrete at face to prevent hazards/disintegration

PT Prevention Technique/s

PU-2C Polyurethane with two components

Q Rock mass classification for tunnel supports (Barton et al, 1974)

Q, Water intake rate (lit/min) in GCD test procedure RCC Reinforced Cement Concrete (Conventional)

RDH Radial Drainage Hole/s - NX radial holes (w/- or w/o casing); L ≤ D, S as per site condition

ResiBlast Residential Blasting (engineered blast near residential area)

RigidR Rigid Ribs – steel ribs made from H profile (heavy beam) or any equivalent profile/s used for manufacturing rigid ribs to absorb entire dead/passive load from the ground

RingC Ring Closure or invert closure

RMR Rock Mass Rating (Bieniawski, 1973)

RSS Rigid Support System

RWall Retaining Wall including cladding wall and any other types

S Spacing related to ConeB, CPS, FaceB, SRH, SysA, SysB, SysDB, SysHB, SysLB, SysN, or YieldB; S ≤ 0.3L

SCL Sprayed Concrete Lining; it is a tunnelling method using shotcrete (sprayed concrete) as a primary liner as a member of SS for interaction with ground load configuration. SCL is almost the same as NATM with higher emphasis on shotcreting as primary SS.

scs Score related to “Compressive Strength” as Uniaxial Compressive Strength of ground; a parameter of S!

SD Structural Dimensioning for each SS

SDA Self-Drilling Anchor

SecP Secant Piling or equivalent driven or bored piles including friction or end bearing piles SEM Sequential Excavation Method; it is not a tunnelling method; instead, it is an excavation

method based on NATM principles for optimisation of load configuration.

SF Scaling Factor

SFL Structural Final Liner

S! Strength Index

SingleRodE Single Rod Extensometer - measuring point @ 3 m recommended

SLS Serviceability Limit State design check - a LSD method

SN Store Norfors - a rigid system of bolts using steel rebars SolP Soldier Piling or equivalent driven or bored piles

SPL Structural Primary Liner

SpotA Spot Anchoring

SpotB Spot Bolting - oriented with limited number

SRH Stress Release Holes - long radial naked holes; 100 - 300 mm diameter; L = D (Bineshian, 2020b)

SRT Seismic Refraction Tomography - a non-destructive geophysical method SS Support System

sse “Scale Effect” factor; a parameter of S!

SSH Squeezing/Swelling/Heaving (Bineshian, 2020b)

SSH-Class Classification for SSH ground based on severity of convergency (Bineshian, 2020b)

StrainG Strain Gauge/s

StrainM Strain Meter

SurS Surface Structure including surface and semi-surface structure/s and mine/s in general comprising of but not limited to bridge and dam abutments, cut & cover, deep and shallow foundations, embankment and tailing dams, open cuts, open pits, shallow metro stations (cut & cover or open cut), slopes, surface power house openings, trenches

SV Structural Verification based on the definition of relative safety margin for SD Swellex An expandable rock bolting system from Atlas Copco

SysA Systematic Anchoring - anchors perpendicular to face of slope; L = 0.5H, S = 0.3L

SysB Systematic Bolting - radial direction; L = 0.5D, S = 0.3L

SysDB Systematic Dynamic Bolts - oriented/radial dynamic bolts; a system of ductile bolting, which is applicable for tunnelling under stressed condition like burst prone and/or SSH ground (Bineshian, 2020b); L = 0.5D, S = 0.3L

SysHB Systematic Horn Bolting – a system of bolts oriented towards the direction of advancement at tunnel, which is used to prevent over-breaks and rock falls from crown in tunnelling with unfavourable orientation of discontinuities; to be used only above SPL of tunnel (crown) at 30 - 45 deg; L = 0.7D, S ≤ 0.3L

SysLB Systematic Long Bolting - radial long bolts; L = 0.7D, S = 0.3L SysN Systematic Nailing - radial bolts/anchors; L = D = H, S = 0.3L t Time period or duration of vibration in a blast (sec)

TanP Tangent Piling or equivalent driven or bored piles including friction or end bearing piles TBM Tunnel Boring Machine

TD Time Dependent - ground condition with time dependent shearing behaviour such as squeezing/swelling/heaving condition, or even creep

TH Toussaint-Heintzmann - steel profile used in fabrication of yield/sliding ribs

T! Injection period (minutes) taken for injection of V, quantity of water in GCD test procedure; it is the period of time from initial raise in pressure till the first drop in peak.

TSP Tunnel Seismic Prediction

UB Under Break or under cut or under excavation

UC Universal Column as per Australian Standard (i.e., 150UC23 and 200UC46)

UCS Unconfined Compressive Strength

ULS Ultimate Limit State design check - a LSD method UnCtldBlast Un-Controlled Blasting (Non-engineered blast)

UndS Underground Structure/s including underground shallow and deep structures, openings, and mines comprising of but not limited to caverns, deep metro stations, galleries, stopes, shafts, tunnels, underground power houses, stations, storages, wells

USBM The United States Bureau of Mines

ViD Vibration-induced Damage or blast-induced damage (Bineshian, 2021a, 2021b) Vp Primary Wave Velocity (m/sec)

VP Visco-elasto-Plastic - ground condition as visco-elasto- to fully plastic behaviour; ground contains elastic component/s together with viscous component/s that causes strain rate dependence on time; however, due to losing energy during static or dynamic loading cycle, its behaviour converts to fully plastic and may flow like viscous substance.

VPH Vertical Probe Hole - vertical NX blind/coring exploration hole/s; L = 0.5H Vs Shear/Secondary Wave Velocity (m/sec)

V, Injected quantity of water (lit) during injection period of T! in GCD test procedure; it is measured from the moment that the pressure is started rising till the first drop in peak is observed.

w Width of crack in concrete (mm); as per IS 456:2000 permissible crack width in the SLS design check for SV must be as: w < 0.30 mm

WDH Wing Drainage Holes - NX wing shape (w/- or w/o casing) at 30 - 45 deg applicable in underground openings to drain water from sides and ahead of face to reduce the pore hydrostatic pressure; L ≤ 2D, S as per site condition

WeldM Weld Mesh - conventional weld mesh used over shotcrete in ground burst condition or used as reinforcement for shotcrete

Wetness A diagram defined here to clarify the ground's water content, which is classifying the ground water condition (observational identification) in 11 ranges

WH Weep Holes - upward angled NX weeps (w/- or w/o casing); L = H, S as per condition

WPM Waterproofing Membrane - an elastic/flexible impermeable geotextile or fibre reinforced geomembrane or composite to be used for sealing

X1 One Row

X2 Two Rows

YieldB Yielding Bolts - oriented/radial ductile bolts for stressed condition including burst prone and/or SSH ground (Bineshian, 2020b); L = 0.5D, S = 0.3L

YieldFRC Yield Fibre Reinforced Concrete - FRC with embedded LSC and/or LCN, which is applicable for tunnelling under SSH condition (Bineshian, 2020b)

YieldFRS Yield Fibre Reinforced Shotcrete - FRS with embedded LSC and/or LCN, which is applicable for tunnelling under SSH condition (Bineshian, 2020b)

YieldR Yield Ribs - sliding ribs using TH or H yield/sliding steel profile; it is an important member of CYSS for tunnelling under SSH condition (Bineshian, 2020b)

YSS Yield Support System - a system of yield measures, which is used for tunnelling under SSH condition; it includes CYSS and/or SRH System (Bineshian, 2020b)

νg Poisson's Ratio of ground

σc Unconfined Compressive Strength of intact rock or soil (MPa)

σcg Unconfined Compressive Strength of ground - rock mass or soil mass (MPa)

σh Horizontal Stresses (MPa) at the location or depth of placement of structure (d) σtg Uniaxial Tensile Strength of ground - rock mass or soil mass (MPa)

σv Vertical Stresses (MPa) at the location or depth of placement of structure (d)

φg Internal Friction Angle of ground (degrees)

References

  1. AS 2187.2 1993. ‘Australian Standard – Explosives; Storage, transport, and use; Part 2: Use of explosives’, Committee CE/5.
  2. Barton, N, Lien, R, Lunde, J 1974. ‘Engineering classification of rock masses for the design of tunnel support’, Rock Mechanics, 6: 4: 189 - 236.
  3. Bieniawski, Z.T, 1973. ‘Engineering classification of jointed rock masses’, Civil Engineer, South Africa, 15 (12).
  4. Bineshian, H 2012. ‘Prediction of triaxial compressive strength of geomaterials based on a failure criterion’, Proceedings of 31th International Conference OOAE, OMAE, Rio, Brazil, 1 - 6.
  5. Bineshian, H 2014. ‘Stress non-uniformity in concrete and rock structures’, LAP Lambert Publishing, Germany, 333p.
  6. Bineshian, H 2017. ‘Tunnelling in Visco-Elasto-Plastic ground in tunnel T05 of the Katra-Dharam Section of the Udhampur Srinagar Baramulla Rail Link Project’, Proceedings of Tunnelling in Himalayan Geology, Jammu, India.
  7. Bineshian, H 2019a. ‘I-System; A quick introduction’, Proceedings of the 8th IndoRock-2019 Conference, Delhi, India, 254 - 271.
  8. Bineshian, H 2019b. ‘I-System: Index of Ground-Structure; A Comprehensive Indexing System for Ground-Structure Behaviour; Classification and Characteri- zation’, Journal of Engineering Geology (JOEG), XLIV (1 & 2), 73 - 109, ISSN 0970-5317.
  9. Bineshian, H 2020a. ‘GCD – Ground Conductivity Designation; A testing method to quantify ground’s hydraulic conductivity and solidification quality’, Journal of Engineering Geology (JOEG), XLV (1 & 2), 17 - 23, ISSN 0970-5317.
  10. Bineshian, H 2020b. ‘SRH System – Stress Release Hole/s; A substitution to conventional yield support system’, Journal of Engineering Geology (JOEG), XLV (1 & 2), 1 - 16, ISSN 0970-5317.
  11. Bineshian, H 2020c. ‘I-System: Index of Ground-Structure; Definition, applications, and utilisation in design/practice’, TAI Journal, 9 (1): 42 - 64.
  12. Bineshian, H 2021a. ‘Principles in blasting design for civil works; An introduction to design and control of underground blasting; Part 1: Fundamentals of blasting; Part 2: Blast impacts control’, Presentation of lectures delivered to National Hydroelectric Power Corporation (NHPC Limited), Delhi, India, 1 - 39.
  13. Bineshian, H 2021b. ‘Vibration-induced Damage Assessment; New practical methods applicable for engineered blasting’, TAI Journal, 10 (1): 5 - 14.
  14. Bineshian, H, Dyskin, A V, Pasternak, E 2021a. ‘QI Full-Field of View Strain Measurements in Concrete/Rock Structures – Precision and Accuracy’, ISRM Journal, 10 (1), 3 - 15, ISSN 2277-131X (Print), ISSN 2277-1328 (Online).
  15. Bineshian, H, Dyskin, A V, Pasternak, E 2021b. ‘Effect of Bending Moment on Concrete/Rocks in Compression – A Study Based on Digital Image Correlation (DIC) ’, In press.
  16. Bineshian, H, Ghazvinian, A 2012a. ‘A comprehensive nonlinear-linear compressive-tensile strength criterion for geomaterials’, JRMGE, 4 (2): 140 - 148.
  17. Bineshian, H, Ghazvinian, A 2012b. ‘Applicability of a new strength criterion in comparison to failure criteria’, Ground Engineering in a Changing World, ANZ Conference, Melbourne, Australia, 1045 - 1050.
  18. Bineshian, H, Gupta, S, Hegde, R K 2019. ‘NATM in Hazardous Condition – Challenging Visco-Elasto-Plastic Ground – T5 Tunnel – USBRL Project’, Proceedings of International Conference, Tunnelling Asia, Mumbai, India, 120 - 135.
  19. Bineshian, H, Rasouli, V, Ghazvinian, A 2013. ‘Proposed constants for Bieniawski's strength criterion for rocks and coal’, IJRSG, 2 (3): 12 - 21.
  20. Boulanger, R W, Idriss, I M 2014. ‘CPT and SPT-based liquefaction triggering procedures’, Rep UCD/CGM-14/01, Department of Civil and Environmental Engineering, University of California, Davis, 138p.
  21. Carranza-Torres, C 2004. ‘Elasto-plastic solution of tunnel problems using the generalized form of the Hoek-Brown failure criterion’, Int J Rock Mech Min Sci 41 (Suppl 1): 629 - 639.
  22. Duvall, W I, Fogelson, D E 1962. ‘Review of Criteria for Estimating Damage to Residences from Blasting Vibrations’, United States Bureau of Mines (USBM), RI5968.
  23. Dyno Nobel 2010. ‘Blasting and Explosives Quick Reference Guide’, REF 0110/0210/AZZ AUS/2K.
  24. EN 1990:2002 E 2001. ‘Eurocode - Basis of Structural Design’, CEN.
  25. Idriss, I M 1999. ‘An update to the Seed-Idriss simplified procedure for evaluating liquefaction potential’, In Proceedings, TRB Workshop on New Approaches to Liquefaction, Publication No FHWA-RD-99-165, Federal Highway Administration.
  26. Idriss, I M, Boulanger, R W 2008. ‘Soil liquefaction during earthquakes’, Earthquake Engineering Research Institute, Oakland, 261p.
  27. Idriss, I M, Boulanger, R W 2010. ‘SPT-based liquefaction triggering procedures’, Rep UCD/CGM-10/02, Department of Civil and Environmental Engineering, University of California, Davis, CA, 259p.
  28. IS 456:2000. ‘Indian Standard – Plain and reinforced concrete’, Code of Practice, 4th Edition, BIS2000.
  29. McCormac, J C 2008. ‘Structural Steel Design (4th ed)’, Upper Saddle River, NJ: Pearson Prentice Hall, ISBN 978-0-13-221816-0.
  30. McKown, A F 1986. ‘Perimeter control blasting for underground excavations in fractured and weathered rock’, Bulletin of the Association of Engineering Geologists, 23 (4), 461 - 478.
  31. Medvedev, S V, Sponheuer, W 1969. ’Scale of seismic intensity’, Proceedings of the 4th World Conference on the Earthquake Engineering, 1, A-2, 143 - 153.
  32. Palmstrom, A, Broch, E 2006. ‘Use and misuse of rock mass classification system with particular reference to the Q system’, Tunnels and Underground Space Technology, Vol 21, 575 - 593.
  33. Russo, G, Grasso, P 2007. ‘On the classification of the rock mass excavation behaviour’, Proceedings of the 11th Congress of International Society of Rock Mechanics, Lisbon, 9 - 13.
  34. United States Patent 2002. ‘McNally et al (45)’, Date of Patent: 2002/10/22.

Appendix 1: GCD

Ground Conductivity Designation (GCD) is a test method based on a simple single stage water injection procedure for examination of the ground’s hydraulic conductivity (Bineshian, 2020a). The output of GCD guides engineers and/or geologists to have a pre- and/or post-grouting/injection assessment on ground quality in terms of permeability, solidification, consolidation, water ingress reduction, or sealing quality.

Eq 17 represents dimensionless empirical form of GCD. Eq 18 represents water intake rate in lit/min, which is used in Eq 17. Figure 16 demonstrates schematics for the GCD test setup. Table 13 provides classification for ground hydraulic conductivity as well as ground solidification quality.

GCD = Q,⁄(P* + L!)        (17)

Q = I$ J%        (18)

where;

GCD Ground Conductivity Designation (dimensionless)

L! Length of water injected portion (packed length) of hole or perforated SDA (m)

P* Peak head (MPa) during injection period of T!; measured pressure before the first drop in peak

Q, Water intake rate (lit/min); to be calculated using Eq 18

T! Injection period of time (min) taken to inject V, quantity of water; it is the period of time from initial raise in pressure till the first drop in peak is observed.

V, Injected quantity of water (lit) during injection period of T!; it is measured from the time that pressure is started to raise till the first drop in peak pressure is observed.

A proper conduction of GCD test method includes procedures as follows:

  1. Select the location in which ground conductivity to be measured.
  2. Drill a single naked hole in any direction or orientation in the chosen location including horizontal, vertical, or inclined at face, wall/s, crown, or invert (Figure 16a). Drilling can be conducted using a rotary-percussion or rotary drilling system; however, rotary drilling system is preferred.
  3. Stabilise the drilled hole using casing; however, naked hole for GCD test is preferred. If hole is not sustained, casing can be applied or SDA can be used.
  4. Flush the naked hole using clear water to remove fine debris and cuttings. If casing hole or SDA is used, the same flushing procedure to be applied.
  5. Pack the collar of the naked drilled hole using a top/mechanical packer (Figure 16b). Packing must be conducted in a proper way that the collar is completely sealed and no leakage of water is observed. If casing or SDA is used, a proper packing inside casing or on the outlet of SDA is necessary to be conducted. The space between casing and ground and/or between the SDA and ground should be completely sealed only at collar using cement mortar or PU-2C or any method/material that may be applicable. It is important to note that only a short portion (maximum 300 mm length) at collar of the hole to be sealed.
  6. Set up a suitable water pump and connections for injection of water to the hole (Figure 16c). The water pump should have the capacity in providing enough pressure and be equipped with pressure gauge. Use of grouting pump unit in GCD test procedure is highly recommended.
  7. Inject water to the hole and measure the V& in T! period of time.
  8. Calculate Q& and consequently GCD.
  9. Find the proper range of GCD in Table 13 based on the calculated value.
  10. Classify the Ground Hydraulic Conductivity and Ground Solidification Quality using Table 13 for further judgment and use in design and/or practice.
I-SystemFigure 16: GCD setup (Bineshian, 2020a)


GCD ranges from below 1 to above 100 (Table 13) that classifies ground’s hydraulic conductivity into 6 categories; very low (VL), low (L), moderate (M-), medium (M+), high (H), and very high (VH). It also classifies solidification quality into 6 categories as excellent (E), very good (VG), good (G), fair (F), poor (P), and very poor (VP).

Conduction of GCD test does not contain complicated procedure; however, there are some important notes that needs to be considered in measurements as follows:

  • It is recommended to repeat the test for 3 times and then making an average of values to obtain a better precision and accuracy in GCD estimation.
  • If during the water injection, pressure is not obtained, or it is lesser than 0.20 MPa, then the ground hydraulic conductivity would be considered as VH, which means that quality of grouting or injection executed at the location of the hole is classified as VP (Table 13). In this case the section should be further grouted/injected by a proper consolidation material/s and/or with a better configuration to obtain the targeted GCD value that designated in particular design.
  • If the pressure is rapidly raised and exceeded 1 MPa, then the ground hydraulic conductivity would be considered as VL, which means that quality of grouting or injection executed at the location of the hole is classified as E (Table 13).
I-System

 

Appendix 2: ViD

Vibration-induced Damage (ViD) or in other words blast-induced damage includes deterioration of ground, further development of plastic zone beyond the excavation line, aggravation of overbreak, and damage to vicinity structure/s induced by vibration (Bineshian, 2021a). Peak Particle Velocity (PPV) is a suitable vibration parameter that is used to assess the ViD that is measured, calculated, or predicted using seismographs, mathematical formulas, or empirical equations respectively. In absence of measurement or calculation, empirical equations are developed. One of the first and most credible empirical PPV predictor (Eq 19) is proposed by USBM (Duvall and Fogelson, 1962).

I-System



where;

cD Site constant; determined by regression analysis on (Dist, PPV) or empirical values to be used

cF Site constant; determined by regression analysis on (Dist, PPV) or empirical values to be used

CPD*%G Maximum charge per delay (kg)

Dist The distance between the blasting location and concerned structure or transducer (m)

PPV Peak Particle Velocity (mm/sec)

“Dist” to be assumed as 20 m when Eq 19 is used for derivation of ET! value from Table 8 (Section 3.7). c' and c( can be derived from regression analysis; however, use of empirical values for site constants (e.g., Table 14) assists in prediction of PPV.

I-System


Considering that I-System includes the ETi in its equation as a dependent variable on PPV, the same is used to define an indicator for ViD as a function of the same, which is expressed in a percentage (Bineshian, 2021b). Mathematical form of this indicator is defined in Eq 20 and the classification for ViD is shown in Table 15 (Bineshian, 2021b).

I-System


Di = (1- ETi)×100        (20)

where;

Di Damage Indicator (%); indicator for ViD to the structure in ground

ETi Excavation Technique’s Impact factor; part of I-System (Bineshian, 2019a, 2019b, 2020c)

I-System


Another method to assess the ViD is the Ground Conductivity Enhanced Factor (GC)*), which is developed by author (Bineshian, 2021a, 2021b) using GCD (Bineshian, 2020a; Appendix 1). Post-blast enhanced conductivity can be a criterion for assessment of ViD to the surrounding ground of tunnel by taking the pre-blast conductivity as a reference value. Eq 21 and Table 16 provide ViD assessment based on GC)* (Bineshian, 2021b).

I-System
 

where;

GCD Ground Conductivity Designation (Bineshian, 2020a)

GCD- Existing GCD; post-blast measured GCD GCD' Pre-existing GCD; pre-blast measured GCD

GC-& Ground Conductivity Enhanced Factor

I-SystemUse of Di, GCef, or HCF is the choice of designer, engineer, or geologist


HCF (McKown, 1986) is a handy (Eq 22) but inaccurate method for assessment of ViD due to considering only the length of half-barrels for assessment. Likewise, the ViD classifications proposed by researchers based on HCF are not in details. Author to make this handy assessment more detailed, proposed a classification for ViD based on HCF (Table 17) with more details in categorisation of damage (Bineshian, 2021a, 2021b) that is matched with ViD classification presented in Tables 15 and 16.

I-System
 

where;

HCF Half-Cast Factor (%)

LCH Length of contour hole (m)

LHC Length of half-cast (m)

Appendix 3: Pull Length Advisor

Implementation of suitable length for pull is crucial for stability of opening in tunnelling specially under challenging condition. I-System in its earlier edition (e.g., 2019, 2020) proposed values for pull length (PL) to be considered for each (I)-Class during excavation in underground spaces; however, in this edition an equation (Eq 23) is proposed (Bineshian, 2021b) – based on the best fit on empirical data – for calculation of PL as a function of D and (I) values, which provides a better advice for safe PL based on tunnel dimension and ground’s quality or condition. The “PL” recommendation that is reflected in (I)-Class in Tables 9 and 11 for underground structures should be calculated using Eq 23. The calculated value for PL should be further assessed by engineer as per site condition for the safe and efficient advance at face. When drill and blast technique (DnB) is used for excavation, Eq 24 provides an estimate for the drilling length (DL) for an optimised engineered blasting with a reasonable blasting efficiency.

I-System
 

where;

(I) I-System’s value

D Diameter, width, or height (mm) of underground opening (the greater value) DL Drilling Length (mm) when DnB is used for excavation

PL Pull Length (mm) as an advice for advance in tunnel using DnB or ME

Figure 17 is a graphical representation of Eq 23. Calculated PL from Eq 23 or derived from Figure 17 can be further reviewed by the engineer at site based on the actual condition of ground and structure.

I-SystemFigure 17: PL graph; derivation of PL as a function of D and (I) for tunnels (Bineshian, 2021b)


An example as a guide is also shown in Figure 17 for a tunnel with D = 8,000 mm and

(I) = 75; the PL for DnB technique for tunnel’s face advance is derived from Figure 17 and DL is calculated using Eq 24:

PL = 3000 mm DL = 3300 mm

I-System

 

Appendix 4: SRH

SSH (squeezing, swelling, and heaving) behaviour is a complicated non-uniform time- dependent mechanical response of ductile ground to excavation; however, it is different in load configuration compared to creep as a typical time dependent behaviour. It is a post-excavation procedure of yield stress development that generates plastic zone around the opening, however; because of stimulation caused by micro-scale sliding failure of existing non-uniformly distributed weak planes, shear stresses further magnified that initiates non-uniform deformation toward free space in a plastification process. Convergence is occurred when excavated space is the only existing free space. Severity of SSH condition depends on ground properties and induced stresses (Bineshian, 2020b). An empirical identification criterion for distinguishing SSH from Non-SSH as well as a classification for severity of SSH is presented in Table 18.

I-System


Support system used for SSH ground includes Rigid Support System (RSS), and Yield/Ductile Support System (YSS). RSS is a stiff system of measures to resist against induced deformation due to SSH behaviour by absorbing entire accumulative SSH stresses. RSS is applicable for passive load configuration in gravity driven and shallow depth overburden with less arch effect; it is not recommended to be applied for tunnelling in SSH ground. YSS is designed to accommodate deformations that is induced to periphery of tunnel in SSH ground by controlled yielding to prevent/terminate accumulation of load. Application of YSS in its conventional form (CYSS) includes reaming (Figure 18a), LCN (Figure 18b), LSC (Figure 18c), YieldR (Figures 18d and 18e), YieldB, convergency measurements, and instrumentation.

I-System


Application of CYSS is a cost- and time-inefficient system, which includes several sequences as well as delay and hindrance in the tunnelling procedures. Consequently, SRH (Stress Release Hole/s) is developed for tunnelling under SSH condition (Bineshian, 2020b) to eliminate the hazards and challenges involved with tunnelling under SSH condition as well as lessening the hindrance and cost caused by application of CYSS without compromise in safety. Key concept behind SRH is to divert the SSH stresses towards the uniformly distributed free spaces created by SRHs; therefore, non- uniform deformation caused by SSH behaviour is induced to the SRHs instead of their occurrence on periphery (Figure 19). Thus, further accumulation of SSH stresses also will be controlled and finally terminated. Table 19 offers requirements for application of SRH System for treatment of each class of SSH condition in tunnelling as well as requirements for CYSS. SRH System releases/terminates incremental non-uniform time-dependent shear stresses around the periphery, prevents/minimises convergency, eliminates repair or rework of primary SS, saves in cost and time and reduces hindrance compared to CYSS, and also improves efficiency of advancement (Bineshian, 2020b).

I-SystemFigure 20: SRH drilling pattern – plan and cross section views; L = D, S = 2000 mm (Bineshian, 2020b)


SRH System is applied in a systematic pattern of large diameter drilled – using ordinary rotary percussion drilling system – holes (100 - 300 mm) in an individual system as shown in Figure 20 or combined with other measures (Table 19) depending on the severity of convergency. Continues monitoring of stresses is required when CYSS (e.g., sliding ribs and LSC) is applied, further to several periodical sequences of measurements and clamps laxation, which is time-consuming procedure that hinders the advancement. Contrastingly, SRH replaces all these sequences of CYSS with a simple systematic inexpensive drilling of holes. SRH works in a continuous no- maintenance manner until it ends the accumulation of shear stresses and convergency. It is individually applicable for Minor to Mild-SSH condition with (I)-05 to (I)-07 without needs of CYSS. Moreover, it is applicable for Severe-SSH in combination with some elements of CYSS (Table 19). When LG is applied in combination with SRH in ground with (I)-07, it prevents occurrence of large deformation at periphery while SRH System absorbs the deformation beyond the periphery (Bineshian, 2020b).

I-System


3DM measures for tunnelling under SSH condition is provided in Table 20. Each 3DMS may contain 3, 5, or 7 BRTs depending on the SSH-Class (Figure 21) and the size of the underground space. It is not recommended to place the final liner before termination of convergency and earlier than ending of proposed minimum period of monitoring.

I-SystemFigure 21: 3DM; illustration of configuration of 3DMS based on SSH-Class (Bineshian, 2020b)


Similarly, SRH System is applicable for tunnelling in burst prone (BP) condition; however, if TBM is used application of McNally et al (2002) support system with HEAM/WeldM is an alternative choice. Use of SRH System to control the plastic zone around the tunnel in BP load configuration is recommended with use of CtldBlast (PPV ≤ 449 mm/sec), SysDB, FRS, and HEAM or WeldM (Bineshian, 2020b).

Appendix 5: Schematic Illustrations of SS

I-System

 

Appendix 6: Systematic Bolting Calculator

Estimation of the length of bolting system (Section 10) is summarised here in Table 21, which is proposed for (I) ≤ 50 (Tables 9 and 11) to provide an initial estimation for length and spacing of bolts as variables dependent on D; however, due to having only one independent variable without considering the ground quality, it gives less precision and accuracy in estimation of bolt parameters when ground condition varies.

I-System


Author proposed Eq 25 and 26 for calculation of length and spacing of aforementioned bolting systems as a function of D and (I). Eq 25 is valid for (I) ≤ 50. Systematic bolting for (I) > 50 is not recommended in I-System; instead, spot and/or individual bolting is recommended (if required). Neither to be conservative nor incautious, a comparison of output of Table 21 and Eq 25 and 26 may help to decide on bolting system’s parameters.

I-System
 

where;

(I) I-System’s value

D Diameter, width, or height (mm) of underground opening (the greater value)

L Length of ConeB, SysB, SysDB, SysLB, SysN, YieldB (mm) for 25-32 mm diameter bolts

S Spacing of bolts along the both axis and transverse direction (mm)

Figure 23 provides a graph based on Eq 25 for L when D and (I) are known. An example is also shown in Figure 23 for a tunnel with D = 10,000 mm and (I) = 30; the length of the bolting system is derived as L = 7000 mm.

I-SystemFigure 23: L graph; derivation of length of bolting systems (25-32 mm diameter ConeB, SysB, SysDB, SysLB, SysN, YieldB) as a function of D and (I) for underground spaces

 

Appendix 7: I-System Software – Input and Output

I-SystemFigure 24a: I-System Software’s output; Input & Figure 24b: I-System Software’s output; (I)-Class Output

 

I-SystemFigure 24c: I-System Software’s output; (I)-GC Output & Figure 24d: I-System Software’s output; (I)-GC Chart Output

 

NBM&CW - April 2025

No comments yet, Be the first one to comment on this.

Soil Mixing Techniques: Sustainable & Economic Foundation Engineering

Soil Mixing Techniques: Sustainable & Economic Foundation Engineering

Fadi Haddad, Head BD Dams, Dikes, Mining, Ports, Bauer Spezialtiefbau GmbH, and Vidyaranya Bandi, Technical and Tendering, Bauer Engineering India, draw a focus on Soil Mixing Techniques and their economic and ecological benefits.

Read more ...

Sustainability in Geotechnical Construction to Reduce Environmental Impacts

Sustainability in Geotechnical Construction to Reduce Environmental Impacts

Sustainable geotechnical practices can reduce environmental impacts by using energy-efficient designs, low-carbon materials, alternate fuels & equipment and waste reduction strategies. Dr. V. R. Raju, Senior Advisor

Read more ...

Unearthing the Role of Geotechnical Software in Open Pit Mining

Unearthing the Role of Geotechnical Software in Open Pit Mining

In the realm of modern mining, technology plays a pivotal role in optimizing operations and ensuring safety. Among the numerous technological advancements, geotechnical software stands out as a crucial tool in open pit mining. Geotechnical software

Read more ...

Geotechnical Investigation: Why and How?

Geotechnical Investigation: Why and How?

Geotechnical Investigation (GI) is seldom considered important in civil engineering projects by the stakeholders, structural consultants, or architects, primarily because of their ignorance of the subject. The common practice is to save a tiny fraction of the project

Read more ...

Building Sustainable Foundations for Infrastructure Projects

Building Sustainable Foundations for Infrastructure Projects

Foundation construction is one of the leading industries contributing to infrastructure’s carbon footprint. The amount of greenhouse gases (GHG) released into the atmosphere due to geotechnical construction activity is an average of 15 - 23%

Read more ...

Reverse Circulation Drills a Solution for Large Dia Marine Piles

Reverse Circulation Drills a Solution for Large Dia Marine Piles

Suretech Infrastructure is offering the very efficient, safe, and environmentally friendly BUMA Reverse Circulation drilling technique for a wide range of pile diameters, deep holes, and holes drilled into hard rock in various projects across India

Read more ...

Quality Control Measures Prior to Pouring of Concrete for Deep Foundations

Quality Control Measures Prior to Pouring of Concrete for Deep Foundations

Parthasarathy C R, Nandhagopal A R, Srinivas N, and Soumik Ghosal, at Sarathy Geotech & Engineering Services, Bengaluru. present the methods to understand the processes involved during installation of bored cast-in-situ piles using two of the latest

Read more ...

Sustainability in Construction Industry

Sustainability in Construction Industry

Sustainable products for geotechnical works are those that may cause less emissions and increase the sustainability of construction activities. The key parameter to sustainable products for geotechnical works is the optimisation of processes on site

Read more ...

Re-Use of Old Pile Foundations in Amsterdam

Re-Use of Old Pile Foundations in Amsterdam

Evaluating existing foundations is a common and necessary practice, not only for buildings, but also for structures like bridges that bear increasing traffic of cars and trucks, resulting in a tremendous increase in the foundation loads. Inspections to assess the

Read more ...

A Deep Dive into India's Foundation Solutions Market

A Deep Dive into India's Foundation Solutions Market

India’s rapid urbanization and ambitious infrastructural growth have paved the way for transformative advancements in construction technologies like the piling rigs and diaphragm wall machines, which, with their multifaceted applications, are

Read more ...

Assessment of Earthquake Induced Liquefaction Hazard in Jammu & Kashmir: Step for Site Safety and Resilient Foundation

Assessment of Earthquake Induced Liquefaction Hazard in Jammu & Kashmir: Step for Site Safety and Resilient Foundation

This study provides a database for designers working on the construction, development, and expansion-related projects in J&K for developing any prospective earthquake-induced liquefaction mitigation strategies. Dr. Abdullah Ansari, Dept of Smart City