Construction: Then, Now & in Future

Construction: Then, Now & in Future

H. L. Chawla, Research Scholar, Department of Engineering & Technology, Mewar University, Chittorgarh, and Dr. P. R. Swarup, Director General, Construction Industry Development Council (CIDC), New Delhi, describe the various types and methods of construction which have been used in the past, the ones being used at present, and the methods which can be used in the future.

India has been using age-old methods of construction, depending largely on traditional construction, and using natural materials like wood, slates and other stones, bamboo, etc. Some mechanization came in the last 2-3 decades after liberalization and globalisation.

But it is still a long way to go before we achieve our targets. There is a shortage of trained manpower in the construction sector, particularly, skilled manpower.

Apart from the requirement of housing, there is an urgent need to provide better sanitation, potable water, communications, better road connectivity, telephones, railways, water ways, flyovers, metro rail corridors, ports, bridges, airports, uninterrupted water and power supply, etc.

Types of Construction
There are several types of construction like:
  • Traditional (Built at site)
  • Precast
  • Prefabricated
  • Pre-engineered
  • Modular
Traditional (Built at site)
As the name implies, the term “traditional” implies the construction done by assembling materials at the construction site and engaging the work force to do the linear construction. Each step of construction is not only constructed entirely (or largely) at site but needs to be completed before the project moves on to the next phase. The conventional method of building a house is to transport bricks, timber, cement, sand, steel, and construction aggregate, etc. to the site, and to construct the house on site from these materials.

Precast
While in traditional construction, the concrete is cast in-situ, in precast construction, the concrete is cast at another location, either at the building site or in a factory, transported and lifted to its final resting place and fixed securely. This means that unlike cast-in-situ construction, which is monolithic or continuous, precast concrete buildings are made of separate pieces that are connected or bolted together.

Prefabrication
Prefabrication flourished during the prehistoric times as an innovative creation, and showed the way to future developments. The cultural background and period of construction are easily recognized from the materials used, the construction techniques, and the architectural style. The evolution of prefabricated construction is noticeable by observance of the original ancient models that continued over centuries. Different techniques and materials have been adopted since ancient times for the construction of buildings and the processes have evolved along with the skill.

The Process and Theory of Prefabrication
In prefabricated construction, only the foundations are constructed at the site, while sections of walls, floors and roof are prefabricated (assembled) in a factory (possibly with window and door frames included), transported to the site, lifted into place by a crane and bolted together. Prefabrication is used in the manufacture of ships, aircraft and all kinds of vehicles and machines where sections previously assembled at the final point of manufacture are assembled elsewhere, before being delivered for final assembly.

The theory behind the method is that time and cost is saved if similar construction tasks can be grouped, and assembly line techniques can be employed at a location where skilled labour is available, while congestion at the assembly site, which wastes time, can be reduced. The method finds application particularly where the structure is composed of repeating units or forms, or where multiple copies of the same basic structure are being constructed. Prefabrication avoids the need to transport large numbers of skilled workers to the construction site, and other restricting conditions such as lack of power, lack of water, exposure to harsh weather or a hazardous environment are avoided. Against these advantages must be weighed the cost of transporting prefabricated sections and lifting them into position as they will usually be larger, more fragile and more difficult to handle than the materials and components of which they are made.

History of Prefabrication
It might sound like a technological advancement in the modern world, but the fact is that the prefab method is one of the oldest known construction methodologies and the most versatile. Over the years, there have been modifications in its perception and execution as per the local materials available and the impact on the environment.

Pre- historic
The earliest known civilizations, i.e. the Stone Age, Bronze Age and Iron Age had limited construction materials and little construction experience, so caves were used as shelters. Later, with the use of tools, tents began to be built of bones, stones, wood, grass and animal fibers. It was while making the tools that the early man realized the technique of fixing and jointing.

Sri Lanka (3000 BC)
Vatadage Temple, Polonnaruwa

Sinhalese Structures (3000-2000 BC) (Temples) specially in the Kingdom of Anuradhapura and Kingdom of Polonnaruwa. The components of the building were prepared individually offsite and then assembled at site.
  • Stone Henge, England (3100-Neolithic Period)
  • The Sweet Track, England (3800-Neolithic Period)
  • Egyptian Civilisation: 3000-100 BC (Prefabricated stone slabs & stone blocks)
B. River Valley Civilization
  • MESOPOTAMIA (2500-600BC)
  • EGYPTIAN CIVILIZATION (3000-100BC)
  • River Valley Civilisation: 2500-600 BC: Dry wall construction (Palaces, temples, ziggurats), bridges by using wooden logs
Construction with mud Blocks [10]

C. Historic
    • Vedic-Aryan Civilisation: 1500-500 BC (Huts built by using timber, bamboo and temples built with stone for columns and beams)
Luxor Temple

    • HINDU TEMPLES
The pillars and the beams of the temples

    • Roman forts (Built with pre-assembled stone blocks)
    • Atlantic to American Colonisers: 16th Century AD (Panellised timber houses shipped from UK/Europe to America)
    • 18th Century AD
      1. Great Lisbon earthquake of 1755-a new Pombaline style of architecture and urban planning arose, which introduced early anti-seismic design features and innovative prefabricated construction methods, according to which large multistory buildings were entirely manufactured outside the city, transported in pieces and then assembled on site.
      2. The town of Vila Real de Santo António was constructed using prefabricated construction in about 3 years.
    • 19th Century:
      • Crystal Palace London: 1851 (Elements partially prefabricated on the ground & then lifted up) using iron and glass.
      • Eiffel Tower: 1889 (Prefabricated iron elements)
    • 20th Century:
      • Between the World Wars 1 & 2
      • After World War 2
    • Many eastern European countries had suffered physical damage during World War II and their economies were in a poor state. There was lot of damage in the UK and in Western European countries too. There was a need to quickly reconstruct cities which had been severely damaged due to the war. Prefabricated buildings served as an inexpensive and quick way to alleviate the massive housing shortage associated with the wartime destruction and large-scale urbanization. Various building systems were developed in the process.


      However, these houses were mainly utilitarian and there was hardly any sound architectural systems used. They had some inherent defects but lived longer than expected.


      The post-war prefabricated buildings, especially those built using light systems, were seen to deteriorate extensively, and increasingly failed to meet minimum waterproofing and fire safety requirements, among others.


      Two instances of accidents in prefabricated houses led to the unpopularity of the prefabricated houses:
      • A fire in a residence for the elderly built in England in 1974
      • The collapse, due to a gas explosion, of a 24-story block of flats constructed with precast panels in Ronan Point, London in 1968.
The 1980s
      : There was a new emphasis on the added value of industrialized architecture and technologies; these included the ability to provide higher quality within minimum construction timeframes, increased possibilities for customization.


The 1990s:
      Totally mechanized construction systems developed and applied, such as the Japanese T-UP system.
    • 21st Century:

The 2000s
    : prefabricated architecture saw many initiatives to reduce environmental impact and development of improved prefabricated systems. The enhanced sustainability features led to increased costs in the new prefabricated products and technologies and efforts have been put to reduce the costs.
New products have the following advantages:
  • They incorporate local and natural materials
  • Allow the possibility of disassembling and reusing even the foundations
  • Solve integral rehabilitation of façades for better environmental performance of a building
  • Offer reasonably priced homes to internationally accepted standards.
Moreover, advances in Computer Numerical Control (CNC) technologies and building information modeling (BIM) research and software tool have led to improvements in prefabricated construction.

Prefabrication in India
Prefabrication in India began with the emergence of the Hindustan Housing Factory (HHF). The company was set up as a solution to the housing crisis that resulted from the influx of refugees from West Pakistan in the 1950s. It is now known as the Hindustan Prefab Limited or HPL. When the company was set up, it was intended to produce low-income housing solutions.

Pre-Engineered Buildings
The PEB is a suitable construction technique for developing countries. It is a combination of precast and prefabricated structures. PEBs are generally low-rise buildings meant for offices, houses, showrooms, shop fronts etc.

PEBs reduce total construction time of the project by about 40%. This allows faster occupancy and earlier realization of revenue.

In structural engineering, a PEB is designed by a PEB supplier or PEB manufacturer and is fabricated using the best suited raw materials and manufacturing methods that can efficiently satisfy a wide range of structural and aesthetic design requirements. Within some geographic industry sectors these buildings are also called pre-engineered metal buildings (PEMB) or, as is becoming increasingly common due to the reduced amount of pre-engineering involved in custom computer-aided designs, simply Engineered Metal Buildings (EMB).

These buildings can be optimized to meet specific design criteria and are purpose-built such as hangers for aircraft, warehouses, manufacturing and repair facilities, captive power plants, cold storages, office buildings, hospitals, living shelters etc. In automotive manufacturing plants, high altitude living shelters and cold storages, considerable economies have been registered by such optimized designs.

The term PEB was coined in the 1960s. Typically, this metal building consists of light gauge metal standing seam roof panels on steel purlins spanning rigid frames with light gauge metal wall cladding. In other words, it has a much greater vertical and horizontal deflection.

In building a regular steel structure, the time frame will be more, and the cost will be higher. In a pre-engineered building, the complete design is done in the factory, and as per the design, members are pre-fabricated and then transported to the site where they are erected within 6 to 8 weeks.

The first rigid-frame buildings introduced in the late 1940s could span only 40 ft. In a few years, 50-, 60-, and 70-ft buildings became possible. By the late 1950s, rigid frames with 100-ft spans were made; ribbed metal panels became available, allowing the buildings to look different from the old tiered corrugated types.

When collared panels were introduced by a US company in the early 1960s, it permitted some design customisation. At about the same time, continuous span cold-formed Z purlins were invented. The first factory-insulated panels were developed, and the first UL-approved metal roof appeared on the market. The first computer-designed metal buildings also made their debut in the early 1960s. With the advent of computerization, the design possibilities became almost limitless. All these factors combined to produce a new metal-building boom in the late 1950s and early 1960s. As long as the purchaser could be restricted to standard designs, the buildings could be called pre- engineered.

Benefits
  • Optimised design of steel reducing weight
  • Easy future expansion/modification
  • Voluminous space (up to 60M clear spans, 30M eave heights)
  • Weather-proof.
  • No fire hazards
  • International quality standards
  • Seismic & Wind pressure resistant.
  • Quality design, manufacturing, and erection
  • Quick delivery and quick turnkey construction.
  • Architectural versatility
  • Energy-efficient roof and wall system using Rockwool & PUF insulation.
  • Water-tight roofs & wall coverings
  • Pre-painted and low maintenance
  • Easy integration of all construction materials
  • Fast erection of the building
  • Can be dismantled and relocated easily.
  • Future extensions can be accommodated without much hassle.
Applications
Applications of pre-engineered steel buildings include (but are not limited to) the following:

•   Houses   •   Factories   •   Warehouses   •   Sport Halls   •   Aircraft Hangers   •   Supermarkets   •   Workshops   •   Distribution Centres   •   Commercial Showrooms   •   Restaurants   •   Office Buildings   •   Labor Camps   •   Petrol Pumps/Service Buildings   •   Schools   •   Community Centres   •   Railway, Metro & Bus Stations   •   Equipment housing/shelters   •   Telecommunication shelters   •   Almost any low-rise building

Modular PPVC
Prefabricated Prefinished Volumetric Construction (PPVC) is a construction method whereby free-standing 3-dimensional volumetric modules (complete with internal finishes for walls, fixtures, fittings, floors and ceilings) are constructed and assembled, or manufactured and assembled. In an accredited off-site fabrication facility, in accordance with any accredited fabrication method, they are transported and then installed in a building under building works.

Key benefits of PPVC
  • Speeds up construction and achieves a productivity improvement of 35-50% in terms of manpower and time savings, depending on complexity of the project.
  • Dust and noise pollution is minimized as more activities are done off-site.
  • With the bulk of the installation activities and manpower moved off-site to a factory-controlled environment, site safety is improved.
Productivity Improvement
  • Fabrication of PPVC in the factory can proceed alongside other ongoing worksite activities to streamline the construction process.
  • The on-site construction activities can be significantly reduced through use of PPVC.
  • It can potentially achieve a productivity improvement of 35% to 50% in terms of manpower on site and more than 20% in time savings, depending on complexity of the project.
Better Construction Environment
  • As more activities are done off-site, there is reduced environment pollution as dust and noise are minimised.
  • Reduced disturbance to the surrounding neighborhoods during construction.
  • Prefabrication of the building modules leads to cleaner worksites by generating less overall construction waste on-site.
Reduction of Onsite Manpower
  • This will enhance worksite safety and direct the manpower to better working conditions. More construction off-site leads to less time on-site and fewer individual man-hours working at height.
  • By reducing construction and installation activities and manpower from the site, and placing them off-site in a controlled factory environment, fewer workers will be on site, which in turn leads to fewer accidents and less downtime.
Better Quality Control
  • PPVC delivers most of the final product from a controlled factory environment leading to increased reliability with higher quality finishing.
  • Sequence of work can be planned more efficiently with better logistics coordination.
Application of PPVC
PPVC can be considered for building multi-room accommodations such as:

•   Residences   •   Institutions   •   Hotels and hostels   •   Nursing homes   •   Dormitories

References
  1. www.imf.org
  2. World Economic Outlook Update, June 2020. Available. https://www.imf.org/en/Publications/WEO/Issues/2020/06/24/WEOUpdateJune2020
  3. Prefabrication in Ancient Period, August 16, 2018. Available http://www.ivsindia.com/blog/prefabrication-in-ancient-period/
  4. https://en.wikipedia.org/wiki/Prefabrication
  5. Eva Prasher, Shaluza Mittal, “Prefabri- cation in Ancient Period”, IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), e-ISSN: 2278-1684, p-ISSN: 2320–334X. Available: https://pdfs.semanticscholar.org/f804/885f68b24867b59ccdbaf0c917df5c331a66.pdf
  6. Ryan E. Smith “Prefabrication in Developing Countries: a case study of India”. Available. https://scholarworks.umass.edu/cgi/viewcontent.cgi?article=1006&context=wood#:~:text=Prefabrication%20in%20India%20began%20with,West%20Pakistan%20in%20the%201950s.
  7. Subodh.S.Patil, Raviraj.V.Jadhav, Pritam.A.Mali, Mahesh.M.Bhanuse, Murgesh.R,Katti, analysis and design of pre-engineered building of An industrial warehouse, ISSN (PRINT): 2393-8374, (ONLINE): 2394-0697, VOLUME-4, ISSUE-12, 2017 [pg. 41] Available. http://troindia.in/journal/ijcesr/vol4iss12part5/39-43.pdf
  8. https://en.wikipedia.org/wiki/Pre-engineered_building#:~:text=In%20structural%20engineering%2C%20a%20pre,structural%20and%20aesthetic%20design%20requirements.
  9. Mitra, K.K. Pre - Engineered Metal Buildings -The Latest Trend In Building Construction. Pp. 6. Available. www.naredco.in › article › pdfs › Pre - Engineered Met.
  10. Farman Iqbal Shaikh et al. A Study On Pre-Engineered Building – A Construction Technique. Int. Journal of Engineering Research and Applications www.ijera.com ISSN: 2248-9622, Vol. 5, Issue 3, (Part -2) March 2015, pp.05-09. Available https://www.ijera.com/papers/Vol5_issue3/Part%20-%202/B53020509.pdf

No comments yet, Be the first one to comment on this.

×

Terms & Condition

By checking this, you agree with the following:
  1. To accept full responsibility for the comment that you submit.
  2. To use this function only for lawful purposes.
  3. Not to post defamatory, abusive, offensive, racist, sexist, threatening, vulgar, obscene, hateful or otherwise inappropriate comments, or to post comments which will constitute a criminal offense or give rise to civil liability.
  4. Not to post or make available any material which is protected by copyright, trade mark or other proprietary right without the express permission of the owner of the copyright, trade mark or any other proprietary right.
  5. To evaluate for yourself the accuracy of any opinion, advice or other content.
Concrete 3D Printing Technology: Potential & Problems

Concrete 3D Printing Technology: Potential & Problems

A. V. Rahul, Assistant Professor & Divya S. Kurup, Research Scholar, Department of Civil and Environmental Engineering, IIT Tirupati, discuss the progress being made in 3D Concrete Printing, applications worldwide, and the ongoing

Read more ...

Innovative Construction Technologies for PMAY-U Light House Projects

Innovative Construction Technologies for PMAY-U Light House Projects

Urban India is undergoing a rapid transformation, driven by initiatives like the Pradhan Mantri Awas Yojana - Urban (PMAY-U), which aims to provide housing for all. To meet this ambitious goal, it's crucial to shift from traditional

Read more ...

3D Concrete Printing: A Look at Challenges & Future of Construction

3D Concrete Printing: A Look at Challenges & Future of Construction

Construction industry is the economic backbone of a country. The productivity of the projects in the construction industry is significantly influenced by formwork systems that consume huge project resources such as time, cost, material and

Read more ...

Boosting Precast Construction with Augmented Reality

Boosting Precast Construction with Augmented Reality

Blending virtual information with the real-world view, AR has become an effective tool in construction management to improve project planning, execution, and delivery. Bhavin Lakhani, Project Controls Specialist Lead, PMP, and CCM

Read more ...

3DXB Group Sets Guinness World Record for Largest 3D-Printed Villa in Dubai

3DXB Group Sets Guinness World Record for Largest 3D-Printed Villa in Dubai

3DXB Group, a leading innovator in 3D printing solutions for the construction industry, unveiled its achievement in making the world’s largest 3D-printed villa in Dubai. This groundbreaking project signifies a pivotal moment in the UAE

Read more ...

Rapidcast Boundary Walls: Best Quality Concrete Precast Textured Walls

Rapidcast Boundary Walls: Best Quality Concrete Precast Textured Walls

Rapidcast LLP brings to you for the first time in India the best quality concrete precast elements such as RCC precast compound walls and RRC precast stormwater UDrains. The new generation Rapidcast boundary wall/fence is a high quality precast

Read more ...

Elematic's Large Precast Concrete Plant for My Home GRAVA Project

Elematic's Large Precast Concrete Plant for My Home GRAVA Project

Hyderabad is witnessing the construction of Asia's tallest towers with a planned built-up area totalling 3.7 million sqm. The two 180-meter towers, each comprising 43 storeys, will be accompanied by six more similar towers. With each tower

Read more ...

Benefits of Shear Keyed Surfaces in Precast Building

Benefits of Shear Keyed Surfaces in Precast Building

Depending on the finish of the concrete surface, different coefficients are assigned by international codes in the calculation of shear resistance. The American Concrete Institute Code ACI318, Nov.19, states the following: Chapter 16.2.1.1 – Transfer of forces by

Read more ...

Revolutionizing Precast Industry with Advanced Tracking of Precast Concrete Elements

Revolutionizing Precast Industry with Advanced Tracking of Precast Concrete Elements

The precast concrete industry is undergoing a transformative change with innovative software solutions that offer enhanced tracking of precast concrete elements. One of these pioneering software solutions is StruSoft’s Impact Precast, which aims

Read more ...

Emerging Trends & Growth of the Prefab Industry

Emerging Trends & Growth of the Prefab Industry

Prefabricated technologies are becoming increasingly popular in the construction industry, particularly for large-scale construction. As prefabricated structures continue to evolve and improve, they are being used to construct warehouses, factories

Read more ...

Precast RCC Structures versus Pre-Engineered Steel Structures

Precast RCC Structures versus Pre-Engineered Steel Structures

A comparative study on Industrial Building Adopting Structural Frames as Precast RCC and Structural Steel Frames with Prestressed Precast Hollow Core Slabs as Flooring Slabs, presented by C. A. Prasad, Director, METEY Engineering Consultancy, Hyderabad

Read more ...

My Home Mega Project Shows Potential of Precast Construction Technology in India

My Home Mega Project Shows Potential of Precast Construction Technology in India

Storey by storey, Asia’s tallest precast towers with a total planned built-up area of 3.7 million sqm are rising towards the sky in Hyderabad. These two 180-meter towers of 43-stories each will be followed by six more similar towers. With each tower

Read more ...

Mekuba: A Leader in Mould Releasing Agents for Concrete

Mekuba: A Leader in Mould Releasing Agents for Concrete

With over 47 years of experience in the petrochemicals industry, and an expert in the formulation and production of mould-releasing agents, Mekuba Petro Products is growing rapidly in the construction chemicals segment with a daily production

Read more ...

Dextra Groutec Coupler - A Unique Solution for Reliable Joints in Precast

Dextra Groutec Coupler - A Unique Solution for Reliable Joints in Precast

Dextra has added yet another customer-centric, innovative, and custom engineered product - the Groutec Coupler - an efficient product that has been qualified and tested successfully on several major infrastructure projects in the recent past. With the

Read more ...

India an Important Market for TOPWERK

India an Important Market for TOPWERK

Sachin Shetty, India Head – Operation & Sales, and Rajesh Jha, India Head - Sales & Market Development, TOPWERK INDIA, discuss the potential of precast concrete construction in India, localization of non-critical components to bring down cost, and the possibilities of digitalization

Read more ...

Vollert: Building A Stronger India with Precast

Vollert: Building A Stronger India with Precast

Vollert India has recently expanded its production capacity in Sikandrabad (UP) India. As a global leader in precast concrete components, systems, and machine solutions, Vollert’s investment in India indicates a growing interest among German companies

Read more ...

Precast India Connector - Helping Precasters Overcome Cost & Time Overruns

Precast India Connector - Helping Precasters Overcome Cost & Time Overruns

Precast India Connections, a new entity of Precast India Infrastructures, has innovated and patented a method of achieving a Dowel-Sleeve connection that functions even in the horizontal direction. Kapilesh Bhate, MD, Precast India Connections, shares

Read more ...

Prensoland Modern Precast Floors Appearance of the iHCS

Prensoland Modern Precast Floors Appearance of the iHCS

Pre-stressed concrete hollow core slabs used for building floors are unidirectional members; they are laid one next to the other until the complete carpet area is covered. In the presence of lateral loads like wind, or due to seismic episodes, they behave

Read more ...

Brimax AAC: An Indian Lighthouse Project from HESS AAC SYSTEMS, Netherlands

Brimax AAC: An Indian Lighthouse Project from HESS AAC SYSTEMS, Netherlands

Brimax AAC Products LLP contracted Hess AAC Systems to supply a new AAC plant in Vadodara, India, with a capacity of 680 cbm/day (expandable up to 900 cbm/day with reinforcement for panel production). This order strengthens Hess´ position as

Read more ...

To get latest updates on whatsapp, Save +91 93545 87773 and send us a 'Saved' message
Click Here to Subscribe to Our eNewsletter.