
The Warangal Metro Neo will consist of a 15.5 km long corridor of which 8.4 km will be an elevated portion while 7.1 km will be at ground level. The project will have 21 stations with 12 at an elevated level and 9 at ground level. The metro neo line will run from Kazipet to Warangal Bus Station via the District Police Office (DPO) junction. It will have advanced signalling and telecommunications systems and will be equipped with an Automatic Train Protection (ATP) system. The project will consist of electric bus coaches of length 25 meters running on rubber wheels with each train to have a maximum capacity of carrying 250 commuters at a time. The coaches will draw power from an overhead electrical (OHE) system. Metro Neo is a Mass Rapid Transit System that aims to provide safe, comfortable, reliable and energy-efficient transportation services to commuters. It has a cost advantage as well as being lighter and smaller in comparison to regular metro systems and is particularly suited for Tier-2 & Tier-3 cities.