Supply And Installation Of Body Shell Items For Lwlrrm Coaches For Amrit Bharat Rake.Supply And Installation Of Body Shell Items For Lwlrrm Coaches For Amrit Bharat Rake.,Supply And Installation Of Body Shell Items For Lwlrrm Coaches For Amrit Bharat Rake A S Per Drawing No: (1) Aaa-1-0-488, Alt. C, 2 Nos (Rain Water Gutter) (2) 2 11012.0.20.110.100, Alt. Ni L, 2 Nos (Rain Water Gutter) (3) Lp10107, Alt. Nil, 2 Nos. (Sheeting) (4) Lp10136, Alt. D Anx-4, 1 No. (Including 538-1-0-070, Alt A Sub Dr

11261127

Tender Details

Category:
Infrastructure & Construction
Subcategory:
NULL

Important Dates

Publish Date:
28 September 2026
Submission Date:
22 October 2026
Opening Date:
30 November -0001

Financial Details

Tender Value:
₹ 0.00
EMD Value:
₹ 0.00
Document Value:
₹ 0.00

Location Information

Country:
India
State:
Uttarakhand
City:
-
Location:
-
Address:
Pincode:
-

Contact Information

Contact Person:
-
Email:
-
Phone:
-
Fax:
-

Description

Supply And Installation Of Body Shell Items For Lwlrrm Coaches For Amrit Bharat Rake.Supply And Installation Of Body Shell Items For Lwlrrm Coaches For Amrit Bharat Rake.,Supply And Installation Of Body Shell Items For Lwlrrm Coaches For Amrit Bharat Rake A S Per Drawing No: (1) Aaa-1-0-488, Alt. C, 2 Nos (Rain Water Gutter) (2) 2 11012.0.20.110.100, Alt. Ni L, 2 Nos (Rain Water Gutter) (3) Lp10107, Alt. Nil, 2 Nos. (Sheeting) (4) Lp10136, Alt. D Anx-4, 1 No. (Including 538-1-0-070, Alt A Sub Drawing Of 1 11012.0.20.095.037, Alt. C Anx-1 And Lp10135 Anx-1 3) (5) Lp10125 Alt. B Anx-13, Item-33, 14 Nos. (Ledge) (6) Lp10108, Alt. A Anx-1, 8 Nos.(Duct Asse Mbly) (7) Aaa-1-0-278, Alt. Nil, 4 Nos. (Hand Hold Arrangement) (8) 1.11012.0.03.095.001 Alt. A, 1 No (Including 538-1-0-035, Alt. C Sub Drawing Of 1.11012.0.03.095.002, Alt. A Anx-3) Note : Drawin G Number: Aaa51072 To Be Read As Mvmc15013 Alt. Nil The Above Items To Be Supplied As Set And T O Be Installed At The Body Shell Assembly Stage To Assembly Drawing Number: Lp10125, Alt. B Anx-13 . Special Condition: A) Installation Required & Annexure-A, Dated: 13-09-2023 To Be Followed. B) Supply Rate And Installation Rate To Be Quoted Separately. C) The Firms Should Use Only Gtaw (Or) Gmaw Weld Ing Process For Installation Works. Mmaw (Manual Metal Arc Welding) Is Not Permitted. Packing Instr Uction: (Rcf Pi 042 Ver 1.0 ) [ Warranty Period: 96 Months After The Date Of Delivery ] ]

Documents

🔒

Tender Documents Restricted

Full tender details and documents are available to premium subscribers only.

📋 Subscribe Now