Tender Details
Category:
Infrastructure & Construction
Important Dates
Publish Date:
23 September 2026
Submission Date:
20 October 2026
Opening Date:
30 November -0001
Description
Ac Duct For Vande Bharat Coachesac Duct For Vande Bharat Coaches,Supply & Installation Of One Coach Set Of Ac Duct Complete For Vande Bhar At Mc/Ndtec Coaches. Note: Safety Clause Must Be Followed According To Annexure-A O F Dy.Cple-Ii L.No.Rcf/Emp/1 Dated. 01.04.2025., As Per Drawing: Vm44100 Alt A, Packing Instructio N: Pi042 Ver 3.0 (1) Drawing No. Icf/J&T/Misc-2487 Alt. `B? To Be Followed. (2) It Should Be E Nsured That Item Should Not Rub During Transportation. The Item Should Be Packed Wit H Adequate Strength. Transit Damage, If Any, Shall Be At The Cost Of Supplier. For Unde Rframes: Both (1) & (2) To Be Followed As Stated Above. For Other Items Except Underfr Ames: Only (2) Need To Followed. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply And Installation Of One Coach Set Of Ac Duct Complete For Vande Bh Arat Dtc Coaches. Note: Safety Clause Must Be Followed According To Annexure-A Of Dy .Cple-Ii L.No.Rcf/Emp/1 Dated.01.04.2025., As Per Drawing: Vd44131 Alt Nil, Packing Instruction: P I042 Ver 3.0 (1) Drawing No. Icf/J&T/Misc-2487 Alt. `B? To Be Followed. (2) It Should Be Ens Ured That Item Should Not Rub During Transportation. The Item Should Be Packed With A Dequate Strength. Transit Damage, If Any, Shall Be At The Cost Of Supplier. For Underfr Ames: Both (1) & (2) To Be Followed As Stated Above. For Other Items Except Underframe S: Only (2) Need To Followed. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation Of One Coach Set Of Ac Duct Complete For Vande Bhara T Tc Coaches. Note: Safety Clause Must Be Followed According To Annexure-A Of Dy.Cple -Ii L.No. Rcf/Emp/1 Dated. 01.04.2025., As Per Drawing: Vt44100 Alt A, Packing Instruction: Pi042 V Er 3.0 (1) Drawing No. Icf/J&T/Misc-2487 Alt. `B? To Be Followed. (2) It Should Be Ensured T Hat Item Should Not Rub During Transportation. The Item Should Be Packed With Adequa Te Strength. Transit Damage, If Any, Shall Be At The Cost Of Supplier. For Underframes: Both (1) & (2) To Be Followed As Stated Above. For Other Items Except Underframes: Onl Y (2) Need To Followed. [ Warranty Period: 30 Months After The Date Of Delivery ] ]