Tender Details
Category:
Infrastructure & Construction
Important Dates
Publish Date:
20 September 2026
Submission Date:
12 October 2026
Opening Date:
30 November -0001
Description
Shell Kit (Memu Dmc Jk)Shell Kit (Memu Dmc Jk),Shell Kit For Memu Dmc1 Jk 944 A. Roof Assembly - 94416001 000 01 Alt Nil - 1No Loc Ation Of Sidewall -94414001 000 01 Alt Nil - 1 No End Construction Pail End -94515001 000 01 Alt A - 1 No Firm Shall Fulfill The Manufacturing Facility As Per Icf/Md/Specn-200, Issue Status 0 1, Rev 04 With Amendment No 01. Firm Shall Fulfill The Manufacturing Facility As Per Icf/ Md/Specn-315,Issue Status-01, Rev.00 With Amendment No 01. B.Supply Of One Coach Set Of Body Shell Items And Partition Frames For Memu Dmc Jk 944To Drawing Nos: 1. 94410003 0 00 01 Alt A - 1 No 2. 74510257 000 01 Alt Nil - 1 No 3. 94410004 000 01 Alt Nil - 1 No 4. 74510045 00 0 01 Alt Nil - 1 No 5. 94410005 000 01 Alt Nil - 1 No 6. 94410002 000 01 Alt B - 1 No 7. 94410076 000 01 Alt Nil - 1 No 8. 94410072 000 01 Alt Nil - 1 No 9. 94410054 000 01 Alt Nil - 2 Nos C. Under Frame Ar Rangement 94411001 000 01 Alt B - 1 No Firm Shall Fulfill The Manufacturing Facility As Per Icf/Md/Specn-147, Issue Status-01 Rev.02 With Amendment No.02.. Special Condition : Packing As Per Icf/J&T/Misc-2201, Alt F. Packing As Per Icf/J&T/Sk-1809, Alt A. Packing Condition As Per Drg.No.Icf/J&T/Misc-2487, Alt B The Under Frame Should Be Supplied As Normal Side U P & Side Bearer Side Down. Packing Condition As Per Icf/J&T/Sk-1865, Alt A. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members S Hall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-Metallic Corrossion. [S Afety Item] [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ]