Tender Details
Category:
Infrastructure & Construction
Important Dates
Publish Date:
14 September 2026
Submission Date:
21 October 2026
Opening Date:
30 November -0001
Description
Design, Manufacturing, Supply And Installation Of High Capacity Semi-Automatic Coupler With Type-10 Headdesign, Manufacturing, Supply And Installation Of High Capacity Semi-Automatic Coupler With Type-10 Head,Design, Manufacturing, Supply And Installation Of High Capacity Semi-Autom Atic Coupler With Type-10 Head., As Per Drawing: As Per Rdso Spec. Rdso/2017/Cg-07 (Latest) Complying To Annexure-Cb With Automatic Coupling/ Manual Uncoupling And Without Cr Ash Buffers, Anti-Climbers, Pneumatic Connections & Electrical Connections, To Be Fitte D In Pocket To Rcf Drawing Le11165 Without Modification. Installation Required Annexu Re-A Dated 13.09.2023 To Be Followed. -Tenderer To Quote Rate For Supply And Installati On Separately., Packing Instruction: Lhb Cbcs Are Being Used In Two Stages In Rcf And As Per Shop (Using ) Practice , It Is Proposed That Lhb/Cbcs To Be Packed In Two Wooden Box Es As Per Packing Instruction Here Under :- 1.Packing -I:- Un-Coupling Device With Hardwa Res And Other Related Acessories. All Related Hardwares To Be Packed Separately In Jut E Packing To Avoid Rusting/Corrosion Of Hardwares . Pl No To Be Printed/Marked On Pac King Slip And For Use Of Fur Group To Be Marked On Box . 2.Packing -Ii:- One Coupler Hea D, One Draft Gear With Hardwares And Other Related Acessories. All Related Hardware S To Be Packed Separately In Jute Packing To Avoid Rusting/Corrosion Of Hardwares .Ma Chined Surfaces Must Be Covered With Corrosion Resistant Paint/Substance. Pl No To Be Printed/Marked On Packing Slip And For Use Of Underframe Group To Be Marked On Box . Note: (I) Item No. I, Ii Should Be Packed In Separate Boxes. (Ii) A List Should Be Pasted On Each Box Showing Order No. , Pl No., Description Of Item Drg. No./Spec. No., Qty., Firms N Ame, Address , User Name As Above & Date Of Despatch Etc. [ Warranty Period: 48 Months Af Ter The Date Of Delivery ] ]