Running Contract For Manufacture And Supply Of Thick Web Switches Rdso Drg. No. T-9791.Running Contract For Manufacture And Supply Of Thick Web Switches Rdso Drg. No. T-9791.,Running Contract For Manufacturing And Supply Of 10125 Mm Curved Switch For 25 T A Xle Load As Per Rdso Drg. No: T-9791, Alt-02 With 6Oe1a1 Thick Web Tongue Rails And 60 E1 Prime Quality Stock Rail R-260 Grade Conforming To Irs Specification No.T-12 And T-10-2025, For 1 In 12 Tur Nout Bg (1673 Mm) On Psc Sleepers With All F

6325ENG45A

Tender Details

Category:
Infrastructure & Construction
Subcategory:
NULL

Important Dates

Publish Date:
02 September 2026
Submission Date:
02 November 2026
Opening Date:
30 November -0001

Financial Details

Tender Value:
₹ 0.00
EMD Value:
₹ 0.00
Document Value:
₹ 0.00

Location Information

Country:
India
State:
Rajasthan
City:
-
Location:
-
Address:
Pincode:
-

Contact Information

Contact Person:
-
Email:
-
Phone:
-
Fax:
-

Description

Running Contract For Manufacture And Supply Of Thick Web Switches Rdso Drg. No. T-9791.Running Contract For Manufacture And Supply Of Thick Web Switches Rdso Drg. No. T-9791.,Running Contract For Manufacturing And Supply Of 10125 Mm Curved Switch For 25 T A Xle Load As Per Rdso Drg. No: T-9791, Alt-02 With 6Oe1a1 Thick Web Tongue Rails And 60 E1 Prime Quality Stock Rail R-260 Grade Conforming To Irs Specification No.T-12 And T-10-2025, For 1 In 12 Tur Nout Bg (1673 Mm) On Psc Sleepers With All Fittings As Per The Drawing Excluding Ercs And Insulatin G Liners But Including Check Rails. Pre-Curving Of Tongue & Stock Rails Shall Be Done In Accordance Wi Th Rdsos Guidelines Of Pre-Curving Issued Vide Letter No. Ct/Ptx/Tws Design Dated 27.07.2018 Whe Never Required. As Per Note Sl. No. 27 Of Rdso Drg. No. T-9791, Alt-02, "10% Quantity (I.E. 1/10Th Of The Quantity Of Purchase Order) Of Breakage Prone And Wear Prone Spare Parts As Shown In Part-C Of Rdso/T-9791, Alt-02) Shall Be Supplied". Note: (I) The Purchase Order Shall Be Issued In Multiple Of 1 0 Sets.(Ii) The Rate Includes Cost Of Stock Rails, Tongue Rails And Check Rails(Iii) The Lh & Rh Quantit Y Bifurcation Is As Under- Lh = 400 Sets & Rh = 400 Sets. [ Warranty Period: 30 Months After The D Ate Of Delivery ] ]

Documents

🔒

Tender Documents Restricted

Full tender details and documents are available to premium subscribers only.

📋 Subscribe Now