CRCHI TBMs used in Under River Tunnel Project of Yuan River in Changde in Hunan Province, China, for customer CRCC 14th Bureau Group

First super large-diameter SPB with cutter replacement under normal pressure in ChinaFirst super large-diameter SPB with cutter replacement under normal pressure in China

The under-river tunnel project of Yuan River in Changde is a twin-tube tunnel in the Chinese inland city of Changde. The tunnel connects two sides of the Yuan River, and with its two-way and four-lane, it will promote harmonious development of regions along the river. The tunnel excavation was completed in July 2019. 3360 meters of the twin-tube tunnel (each of 1680 meters long) with an outer diameter of 11.3 meters and an excavation diameter of 11.71 meters were driven by a CRCHI independently developed slurry pressure balance shield machine (SPB), which is the first set super large-diameter SPB with cutter replacement under normal pressure.

As for the tunnel’s vertical section, the maximum longitudinal gradient is 3.54%, the minimum turning radius is 680 meters, the maximum overburden is 18. 2 meters, the minimum overburden is 11.3 meters, the maximum water-earth pressure in the river is 4.5 bar, and the utmost water-earth pressure is 5.5 bar.

Main geology is round gravel soil. Pebble strata is distributed in an area of 400 meters long at the northern part. A small amount of silt interlayer is distributed in the river’s bottom. Soil dig-ability grades are Grade I~III, surrounding rock classification is Grade V. The gravel-cobble stratum, among others, is highly permeable, its permeability coefficient being 120m/d. The maximum particle size of the pebble is 45cm, the range of point loading strength is 0.51~5.21MPa and the uniaxial compressive strength is 73.57 Mpa.

Project challenges
Project challenges are large excavation diameter, complicated hydrogeological conditions and confined water. Due to characteristics of high strength, high permeability and high-water pressure, ensuring stable and safe excavation is a key point for this project.

When the SPB is driven in the gravel-cobble stratum with maximum permeability coefficient of 120m/d for a long distance, underground water will constantly enter the excavation chamber to cause slurry fail to reach the standard. Therefore, muck is difficult to discharge and will be accumulated at the bottom of the excavation chamber. This will increase the wear to the cutting tools and slurry pipes and the frequency of cutter replacement. So, driving in the pebble stratum in a smooth way is a big challenge.

Driving in the clay may cause formation of mud cakes, which will reduce tunneling efficiency. So, preventing formation of mud cakes during excavation is another big challenge.

TBM breakthrough

TBM type and parameters
TBM type: ZTS11710 SPB with cutter replacement under normal pressure
Excavation diameter: 11750mm
Length of shield+back-up gantries: 132 meters
Weight of shield+back-up gantries: 3000 tons
Installed power: 6100 kW
Maximum advance rate: 60mm/min

Innovation points
The mega 12m-level SPB with cutter replacement under normal pressure is applicable in high water pressure and long-distance tunneling and available for high requirement on ground settlement.

The self-developed technology of cutter replacement under normal pressure effectively reduces the risk of workers during cutter change by workers, making the replacement safer and quicker.

Application of a high precision gas-liquid pressure balance control technology guarantees that the pressure is always kept balanced between the tunnel face and the excavation chamber. A big-power slurry circulation flushing system ensures high-efficiency excavation and delivery so as to operate easily and adjust parameters.

CRCHI TBMs used in Under River Tunnel Project

Alloy-toothed crushers at the slurry outlet are hydraulic-driven and have high crushing efficiency.

The SPB uses CRCHI integrated control systems and has stable and reliable performance. The successful development and application of cutter change under normal pressure technology is a big leap for Chinese TBM development technology, filling in the domestic gap in this field. Besides, application of box culvert synchronous installation technology allows for the assembly of precast box culverts parallel to tunneling, effectively shortening the construction period.

Construction performance
  • Maximum daily advance rate is 22m/day
  • Maximum monthly advance rate is 362m/month.

NBM&CW March 2020

Click Here
To Know More / Contact The Manufacturer
Please fill in your details, we will contact you as soon as possible
Choose Title from the listPlease let us know your name.
Please let us know your Designation.
Invalid Input
Please let us know your email address.
Please let us know your City.
Please let us know your Contact Number.
Please brief your query.
Our other value-added services:

To receive updates through e-mail on Products, New Technologies & Equipment, please select the Product Category(s) you are interested in and click 'Submit'. This will help you save time plus you will get the best price quotations from many manufacturers, which you can then evaluate and negotiate.

Equipment & Machinery
Invalid Input
Building Products
Invalid Input

India’s Tunnelling Industry Opportunities & Challenges

The growth of the tunnel construction in the country has been driven by a robust pipeline of projects and investments in setting up hydropower projects, developing urban mass rapid transit systems, improving road Read More ...

Klang Valley Mass Rapid Transit Putrajaya Line in Malaysia

Stoked by their debut success with the timely completion of Kajang Line’s underground section, Gamuda Engineering found themselves pitted once more against the unique challenges of tunnelling in Kuala Lumpur Read More ...

Sandvik DT 821C Tunneling Jumbo Setting a New Standard in Speed & Precision

A tunnelling project is a race against time and costs. Getting it right from the very beginning requires knowledge, skill and experience, as well as a proper range of equipment that fulfils the customer’s tunnelling Read More ...

German manufacturer GHH brings special Shotcreting Machine to help complete Mumbai Nagpur Expressway

The Mumbai-Nagpur Expressway is delayed until 2022. In the meantime, a machine ‘GHH IS26’ with remarkable reliability has been specially flown in from the supplier and is in operation to help complete the project Read More ...

CRCHI’s EPB TBM ‘Victory’ Achieves New Records in Construction of Moscow Metro

The project, located at the riverside of the Moscow River, passes under heavy traffic and crowded buildings. It includes two sections of a total length of 2947m. One is from Maple Avenue Station to No.2 Working Shaft Read More ...

Pull Force

Pull Force is the force that a truck or prime mover can exert onto a transporter or any type of trailer. It has been a subject of much controversy and misunderstandings as truck manufacturers and end-users often do not talk Read More ...

Fully Automated Jumbo Revolutionizing Tunneling in India

The first Sandvik DT922i, a computer controlled fully automatic tunneling jumbo, has been introduced by Sandvik Mining and Rock Technology in India with a vision to achieve high levels of safety, productivity and Read More ...

HDD Machines Best Suited for Gas, Cable, and Sewerage Pipeline Projects

Horizontal Directional Drilling is a technology in pipe and utility installation that allows greater accuracy and flexibility in placement and ends the need for costly digging, large crews, road closures and other Read More ...

Progress Maschinen & Automation: Reinforcing cages for tunnel construction and wind-energy solutions

Special knowledge is required for building tunnels and wind energy plants in order to implement demanding projects. The facilities and manufacturing processes required for such projects can be adjusted well in advance for Read More ...

Tunnelling for Science - Special formworks from Doka for tunnel system at CERN

The Large Hadron Collider (LHC) at CERN is the biggest particle accelerator in the world – and growing. To equip the LHC for new, more ambitious experiments in the next decade, the accelerator is currently Read More ...

Proven Technology in Use

The river has its source at over 3000 meters high in the snow-covered Andes. It reaches the Pacific Ocean after 250 km. On its way, it overcomes a considerable gradient and is, therefore, ideally suited to generate electricity Read More ...

CREG: Distinctive Amongst Peers

Tan Shunhui, Chairman, CREG, discusses the competitive advantages of the company’s tunneling equipment and solutions, emerging opportunities in developing countries, factors driving its growth and success across Read More ...

CRCHI TBM at work in Hangzhou Genshan East Road Crossing River Tunnel

15-meter mega Slurry TBM rolled off the assembly line at CRCHI. The excavation diameter of the equipment is 15.01 m, its total length is about 130 m, total weight is about 4300 t, installed power is about 9755 kW, rated Read More ...

Open-type TBM produced by CRCHI creates a new record in China

Being the longest water delivery line in the history of Jilin province, transferring water from Songhua River into Central Jilin Province will transfer the largest capacity of water and cover the largest areas. The water diversion Read More ...

Composite Shell Lining for Tunnels and Mined Stations

Amit Kaul, BASF India Limited (Construction Chemicals Division), India, tells about the innovative tunnel lining system and related design aspects, and also describes the main advantages of this lining system in comparison Read More ...

Impact of Underground Construction n Urban-Built Environments

Underground infrastructures are an integral part of modern cities as they serve to counter problems of surface congestion and environmental degradation. The problems of ground vibrations, vibration induced noise and ground Read More ...
NBM&CW

New Building Material & Construction World

New Building Material & Construction World
MGS Architecture

Modern Green Structures & Architecture

Modern Green Structures & Architecture
L&ST

Lifting & Specialized Transport

Lifting & Specialized Transport
II&TW

Indian Infrastructure & Tenders Week

Indian Infrastructure & Tenders Week