Simulating oversize and heavy vehicle manoeuvres using AutoTURN® from Transoft Solutions.

Use AutoTURN® to design infrastructure adjustments to safely operate trucks transporting wind turbine components.

By Er. Alessio Gori - collaborator at POLITECNICA INGEGNERIA ED ARCHITETTURA SOC. COOP. (Infrastructure division - Head Office Firenze)

mezzo eccezionale

Narrow mountain roads, steep hills and challenging ‘S’ curves are just part of the landscape in the ‘toe’ of Southern Italy, where wind farms are becoming a common part of the countryside. With green technology like wind farms gaining popularity as generators of clean, efficient energy sources, technology and engineering are coming together to make these projects as safe and cost effective as possible.

In Reggio Calabria, the ENEL Green Power project proposed 2 wind farms development to be constructed in two areas: Piani di Lopa with 14 wind turbines rated output 0.85 MW and Campi S.Antonio with 25 wind turbines rated output 0.85 MW, within the boundaries of the three southern Italian municipalities of Bagaladi, Montebello Jonico and Motta San Giovanni.

The Aspromonte region infrastructure network has a limited number of paved roads. They are mostly classified as "mountain roads", both for the geometric road characteristics and for horizontal curves of low radii. The location of Piani di Lopa and Campi S.Antonio wind farm sites, which experts say are excellent for the wind and the rated power output, means engineers must study and plan the routes carefully prior to the transportation stage of the wind turbines components.

Special Software Required

Due to those conditions, the use of specialized software simulating oversize vehicle paths is important for evaluating how the transportation of wind turbine components along the provincial roads might be achieved. Two routes in particular, Strade Proviciale (SP) 3 and 107, from Reggio Calabria harbour to the project sites presented challenges to the engineers.

The objective of the path simulation along the provincial roads SP 3 and SP 107 was to verify the a priori conditions of the existing infrastructures. The actual tests have been set aside because they would have affected the road traffic and delayed the project schedule. Moreover, it has been possible to identify possible adjustments to the existing infrastructure in order to safely operate the oversize vehicles. Local engineering professionals were called in to inspect the overall topography of the route to assess any challenges. They measured the topography and the most critical curves along the route. They also tested the vehicle swept path of an oversized vehicle with an unloaded trailer.

The aspects listed below are potential issues in the traditional approach, which is suitable for short routes and/or simple studies:
  • The route length (40km)
  • The number of potentially critical points (about 150);
  • The presence of bridges, with geometry shown to be unsuitable for oversize vehicle paths.
AutoTURN, developed by Canadian software developer Transoft Solutions and distributed by One Team S.r.l in Italy was selected as the software for the simulation. The software allowed ENEL Green Power to perform vehicle swept path analysis and simulate the driving conditions of the area.

AutoTURN® includes a large selection of predefined vehicles, organized in international libraries and the software performs the simulation of "elementary" manoeuvres as well as of "simple" vehicles, trucks and special vehicles. The last ones are mainly common in Australian and North American regions (called "road train", combination of truck and 2 or more trailers). With the possibility of customizing the AutoTURN® library, defining the "vehicle type" and "ad-hoc" simulation profiles have been fundamental design aspects.

The oversize vehicle geometry and the steering characteristics of each component have been reproduced in a plan and meets the guidelines regulating the automatic steering of rear axles of the semi-trailers in relation to the front truck axles (Fig.4). Through a range of speeds, from 5km/h to 20km/h, each iteration showed the swept path of the simulated vehicle matching the swept path of the field test vehicle accurately. (Fig.5)

Definizione veicolo - Tipologico veicolo Autoturn

Choosing the Vehicles, Simulating the Route with AutoTURN

montaggio
Fig2 - montaggio
Melca Transporti worked with ENEL Green Power to conduct the path simulations. The inspection process designed by the two companies helped identify critical points along the route and the company made adjustments to ensure the equipment could be transported safely. After this process, the companies used an unloaded vehicle to successfully test the path and the convoys drove the route safely without delays or issues.

The vehicle type was selected by determining the characteristics of the three basic components that have to be transported from the production site to the building site. The basic components are:
  • fibreglass blade : length 26m, height 2.50 m
  • single section tower: width 3.60m, height 3.60m, length 25m
  • nacelle (to be installed at the top of the generator): width 2.50 m, height 3.00m, length 7.00m, weight 40 tonnes
The components are assembled with a mobile crane (Fig.2)

Wind turbine components are transported to the project site with wheeled vehicles, classified as "oversize transport vehicle", pursuant to Nuovo Codice della Strada (the new Highway Code). In accordance with the indications of the wind turbine producers, two "vehicle types" have been defined:
  1. Semi-trailer truck transporting a metal structure containing 3 "blade" components;
  2. Semi-trailer truck transporting the tower sections (Fig.3): the evaluated section is the critical one for its geometry; it is where the nacelle sits on the trailer. The nacelle also houses the rotational movement of the 3 fibreglass blades.
Figure 3
Figure - 3

The two "vehicle types" definition has been fundamental because type 1 has optimized the dimensions related to the length of the freight while the type 2 has shown the issues related to the semi-trailer truck width. The vehicle manoeuvre was conducted on both types of vehicles concurrently. The analysis was based on the hypothesis of keeping general traffic on the Piani di Lopa roads separate from the lower speed semi-trailer traffic. In order to ensure the safety margin between the simulation and the real path, the semi-trailer truck with steering axles have been taken into account. However, they have been not provided with a remote control of the steering angle of each axle. The decision to not include this variable in the path simulation is related to a larger flexibility in the vehicle selection for the company responsible for the transport execution.

Simulations and other editing operations are managed within the CAD-based program and this kind of versatility is built into the software. Customization of design attributes is an integral part of the software allowing simultaneous visualization of multiple vehicle combinations including:
  1. The precise position of the truck and semi-trailers during the manoeuvre;
  2. The convoy path with distinct single paths of rear and front wheels;
  3. The vehicle clearance, including the trailer ground clearance.
After topographic measurements were made, the 40 km delivery route from Reggio Calabria to the project site has been performed, revealing several adjustment points. (Fig.6, 7)

intervento tornante / Confronto interventi

The articulated vehicle simulation was performed with AutoTURN® and the path manoeuvres have been defined and designed, preventing errors in path modelling due to possible design inexperience with the semi-trailer truck. Without the aid of AutoTURN®, the path analysis would have been performed qualitatively, deducing the vehicle clearance from the turn radius values and then overlapping the oversize vehicle swept paths to the topographic measurements.

This qualitative approach doesn't consider system analysis; in fact in the typical "S" road curve case, the use of the geometric method would mislead the engineers because it doesn't correctly analyse single critical points in relation to the project plan. The close distance between two "S"-curves suggests a behaviour which is difficult to define with "swept path" analysis. In AutoTURN® this problem is avoided because the design path is built into the software’s vehicle libraries for the exact vehicle type being studied.

At a later stage of the two vehicle types path simulation, the required adjustments to the existing infrastructure were identified including, about 100 small scale "ad-hoc" projects, like: bedrock excavation to widen the road, pile bulkhead structures ( Fig.8) creating manoeuvring space, removal and replacement of direction signs and safety barriers and removing trees. From an economic standpoint, it is important to identify any conflicts along the route (Fig.9), including lighting and telephone wiring. AutoTURN allows the planning to take place ahead of time, speeding up the permit stage and allowing for repositioning or replacement of any obstacles along the way.

intervento con paratia di micropali / Intervento ponte

The oversize convoy path along 40 km route, with more than 100 adjustment points, has not found issues or conflcits with any obstacles along the path geometry (Fig.10, 11), showing the reliability of AutoTURN® for projects of this kind.

particolare manovre su ponte
Fig.10 - particolare manovre su ponte

transito mezzo
Fig.11 - transito mezzo
Click Here
To Know More / Contact The Manufacturer
Please provide your details we will contact you as soon as possible
Please let us know your name.
Invalid Input
Please let us know your Designation.
Invalid Input
Please let us know your City.
Please let us know your State.
Please let us know your Country.
Please let us know your Contact Number.
Please let us know your email address.
Please brief your query.

Characteristics & Categorization of Tunnel Fires & Their Mitigation

A fire that develops in a tunnel interacts with the ventilation airflow and generates complicated air flow patterns and turbulence in the vicinity. The heat generated warms up the surrounding air, and in case of a slope inside Read More ...

Mapei: Injection Solutions for Underground Construction

Injection can be defined as the introduction of a material with pressure into the ground or a structure for waterproofing and for consolidating voids, cracks and porosity. Generally, the injection can be categorised as Pre Read More ...

Tunnel Renovation Redefined

During renovation of the Hasselborner Tunnel in Central Hesse, Germany, contractor Baresel used a method they hadn't tried before. Parts of the tunnel lining had to be removed and the areas were subsequently Read More ...

GHH adds Shotcreting Machine to its - Tunneling Equipment Solutions

GHH is offering state-of-the-art and proven IS26 Concrete Spraying (Shotcrete) machine in India. The machine is suitable for shotcreting application in medium and large sized tunnels with cross sections ranging Read More ...

Kishanganga Hydro Power project – A New Power House

Inaugurated by the Prime Minister of India, the Kishanganga Hydro Electric Power project is the first mega hydro power plant to be awarded as EPC to HCC by NHPC. Located at Bandipore in north Kashmir, the Read More ...

Tunneling to Prosperity: Solutions, Equipment and Technologies

India is one of the fastest growing markets for tunnel construction due to various infrastructure development projects underway across the country. Tunnels are required for hydroelectric power projects, for improving road Read More ...

CREG: Tunneling Specialist

China-based China Railway Engineering Equipment Group Co., Ltd (CREG) is a subsidiary of the public- listed China Railway Engineering Corporation (CREC), a Fortune 500 company and a key state-owned company under Read More ...

Intermodality & Last Mile Connectivity - Creating Smart Walkable Spaces

Urban congestion needs to be addressed by encouraging high quality and innovative energy-efficient public transport integrating it with other forms of paratransit, ensuring last mile connectivity; working on Read More ...

Ashram Metro Station - An Engineering Masterpiece

One of the main challenges of constructing a station in the Delhi Metro Network, especially in a busy and densely populated area, is designing it according to the ambience and the limited space allocated. Constructing Read More ...

Transit Oriented Development - Challenges and Proposed Regulatory Framework

Transit Oriented Development (TOD) complements the concept of new urbanism. Compact, mixed-use communities are the answer to suburban problems. Due to the dynamic nature and multiplicity of underlying Read More ...

Urgent Course Correction Imperative for Indian Railways

Railways’ freight and passenger businesses over the 5-year period, i.e., 2014-15 to 2018-19 (budgeted) indicate a flat growth. The number of total passenger journeys would record a CAGR of 0.22%, passenger kilometres Read More ...

Meeting Emerging Urban Transport Challenges

The Ministry of Housing and Urban Affairs has envisaged growth of urban transport along with a low carbon footprint through seamless implementation of a New Metro Rail Policy, announced last year Read More ...

Tunnelling Through the Ages

History has seen the evolution of tunnelling starting with cave formation, for water management, underground transportation, mineral extraction and for warfare purposes. The oldest reference of a tunnel was Read More ...

Afcons uses Robbins EPB TBM to Complete Third Bore for Chennai Metro Project

Contractor Afcons Infrastructure Ltd used a 6.65 m (21.8 ft) diameter Robbins EPB TBM to bore through in Chennai Metro, making it the contractor's third tunnel to be bored by the machine for the project. The three Read More ...

Robbins Slurry TBM ramps up for Mumbai Metro Line 3

The first of two Slurry TBMs, a rebuilt 6.65 m (21.8 ft) diameter machine, passed its factory acceptance on September 4, 2017 in Singapore. The machine, fitted with a Robbins cutterhead and outer Read More ...

Tunnelling Technologies & product support keep pace with construction complexities

Advanced technologies, mechani- sation of equipment with heightened safety features, and timely service and technical support to end-users can help the construction industry deal with construction complexities Read More ...
NBM&CW

New Building Material & Construction World

New Building Material & Construction World
MGS Architecture

Modern Green Structures & Architecture

Modern Green Structures & Architecture
L&ST

Lifting & Specialized Transport

Lifting & Specialized Transport
II&TW

Indian Infrastructure & Tenders Week

Indian Infrastructure & Tenders Week