In this paper, construction of cross-passage for a twin tunnel system has been discussed along with problem encountered and solution adopted, by using a case history of cross passage in R.K Puram Station, being constructed by L&T-SUCG JV for CC27 of Delhi Metro. Work for the cross-passage commenced after the completion of the twin tunnel on account of ease and efficiency. Method employed for construction of the cross-passage and specifications of materials used have been reported in this paper. The paper also reports a solution adopted for mitigation of a major problem of water-logging encountered during the construction. Approach adopted to address the problem has also been reported in the paper. Efficacy of the procedure utilized and applicable conditions for same along with possible contributing factors have been indicated in the paper.

Introduction

Cross-passages are reinforced concrete structures built in between either two tunnels (as in case of twin tunnel systems) or a tunnel and the ground surface. They are provided to serve two primary purposes namely, emergency escape and maintenance work. In this paper, design, construction methodology and problem encountered during construction of one such structure has been described by analyzing case of a Cross-passage being constructed by L&T-SUCG JV for twin tunnels between R.K Puram and Munirka underground stations for project CC27 of 'Delhi MRTS Project of Phase-III'.

Project Background

The project consists of five underground metro stations (Hauz Khas, Vasant Vihar, Munirka, IIT and RK Puram), underground ramp at Shankar Vihar metro station (part of CC-27) and tunnel from end of this underground ramp to Hauz Khas metro station connecting the five underground stations listed above. Total tunnel drive length is 4.49 Km. Keeping strata of the soil in mind and time constraints, five Tunnel Boring Machines (TBM's) namely Okumura TBM, THI-1 TBM, Herrenknecht TBM, THI-2 TBM and Mitsubishi TBM were used for construction of the tunnels. Out of these, Okumura TBM is particularly suitable for tunneling in soft soil.

Of the total tunnel length under construction, part of the tunnel connecting R.K Puram station to Munirka station, is the subject of consideration in this paper. The tunnel extends 1.32km in length and has an internal diameter of 5.80m and external diameter of 6.35m.

As a standard practice, during construction of a tunnel system, depending upon length of the tunnel and soil characteristics, a pre-calculated number of cross-passages are planned. In the instant case, four cross passages numbered CP-12, CP-13, CP-14 and CP-15 are being constructed between the two stations with average gap of 400m between the cross passages. Soil type found in this region is called 'Delhi Silt' which contains silt and sand in varying proportions from 35% to 80%. It is lightly compacted, has only an insignificant proportion of clay and is largely non-plastic although its behavior is transitional. Absence of rocks and stones lends this soil easily to efficient utilization of Okumura TBM.

NBMCW June 2016

Click Here
To Know More / Contact The Manufacturer
Please provide your details we will contact you as soon as possible
Please let us know your name.
Invalid Input
Please let us know your Designation.
Invalid Input
Please let us know your City.
Please let us know your State.
Please let us know your Country.
Please let us know your Contact Number.
Please let us know your email address.
Please brief your query.

Characteristics & Categorization of Tunnel Fires & Their Mitigation

A fire that develops in a tunnel interacts with the ventilation airflow and generates complicated air flow patterns and turbulence in the vicinity. The heat generated warms up the surrounding air, and in case of a slope inside Read More ...

Injection Solutions for Underground Construction

Injection can be defined as the introduction of a material with pressure into the ground or a structure for waterproofing and for consolidating voids, cracks and porosity. Generally, the injection can be categorised as Pre Read More ...

Tunnel Renovation Redefined

During renovation of the Hasselborner Tunnel in Central Hesse, Germany, contractor Baresel used a method they hadn't tried before. Parts of the tunnel lining had to be removed and the areas were subsequently Read More ...

GHH adds Shotcreting Machine to its - Tunneling Equipment Solutions

GHH is offering state-of-the-art and proven IS26 Concrete Spraying (Shotcrete) machine in India. The machine is suitable for shotcreting application in medium and large sized tunnels with cross sections ranging Read More ...

Kishanganga Hydro Power project – A New Power House

Inaugurated by the Prime Minister of India, the Kishanganga Hydro Electric Power project is the first mega hydro power plant to be awarded as EPC to HCC by NHPC. Located at Bandipore in north Kashmir, the Read More ...

Tunneling to Prosperity: Solutions, Equipment and Technologies

India is one of the fastest growing markets for tunnel construction due to various infrastructure development projects underway across the country. Tunnels are required for hydroelectric power projects, for improving road Read More ...

CREG: Tunneling Specialist

China-based China Railway Engineering Equipment Group Co., Ltd (CREG) is a subsidiary of the public- listed China Railway Engineering Corporation (CREC), a Fortune 500 company and a key state-owned company under Read More ...

Intermodality & Last Mile Connectivity - Creating Smart Walkable Spaces

Urban congestion needs to be addressed by encouraging high quality and innovative energy-efficient public transport integrating it with other forms of paratransit, ensuring last mile connectivity; working on Read More ...

Ashram Metro Station - An Engineering Masterpiece

One of the main challenges of constructing a station in the Delhi Metro Network, especially in a busy and densely populated area, is designing it according to the ambience and the limited space allocated. Constructing Read More ...

Transit Oriented Development - Challenges and Proposed Regulatory Framework

Transit Oriented Development (TOD) complements the concept of new urbanism. Compact, mixed-use communities are the answer to suburban problems. Due to the dynamic nature and multiplicity of underlying Read More ...

Simulating oversize and heavy vehicle manoeuvres using AutoTURN® from Transoft Solutions.

Use AutoTURN® to design infrastructure adjustments to safely operate trucks transporting wind turbine components. By Er. Alessio Gori - collaborator at POLITECNICA INGEGNERIA ED ARCHITETTURA SOC. COOP. Read More ...

Urgent Course Correction Imperative for Indian Railways

Railways’ freight and passenger businesses over the 5-year period, i.e., 2014-15 to 2018-19 (budgeted) indicate a flat growth. The number of total passenger journeys would record a CAGR of 0.22%, passenger kilometres Read More ...

Meeting Emerging Urban Transport Challenges

The Ministry of Housing and Urban Affairs has envisaged growth of urban transport along with a low carbon footprint through seamless implementation of a New Metro Rail Policy, announced last year Read More ...

Tunnelling Through the Ages

History has seen the evolution of tunnelling starting with cave formation, for water management, underground transportation, mineral extraction and for warfare purposes. The oldest reference of a tunnel was Read More ...

Afcons uses Robbins EPB TBM to Complete Third Bore for Chennai Metro Project

Contractor Afcons Infrastructure Ltd used a 6.65 m (21.8 ft) diameter Robbins EPB TBM to bore through in Chennai Metro, making it the contractor's third tunnel to be bored by the machine for the project. The three Read More ...

Robbins Slurry TBM ramps up for Mumbai Metro Line 3

The first of two Slurry TBMs, a rebuilt 6.65 m (21.8 ft) diameter machine, passed its factory acceptance on September 4, 2017 in Singapore. The machine, fitted with a Robbins cutterhead and outer Read More ...
NBM&CW

New Building Material & Construction World

New Building Material & Construction World
MGS Architecture

Modern Green Structures & Architecture

Modern Green Structures & Architecture
L&ST

Lifting & Specialized Transport

Lifting & Specialized Transport
II&TW

Indian Infrastructure & Tenders Week

Indian Infrastructure & Tenders Week