Use of Ferrocement for Construction of Mini Check Dams and Diversion Structures

Diversion structures and check dams are constructed for diverting/ storing the water, flowing in shallow rivers/ streams for various purposes. The present practice is to use brick / stone / stone block masonry, for permanent check dams and sand bags / stone block, lined with wire crates for temporary or semi-permanent check dams. As a part of National Drinking Water Mission project, technique for construction of ferrocement check dams was developed at CSIR- Structural Engineering Research Centre, Ghaziabad/Roorkee (SERC) for smaller and medium heights. The technique includes the casting of precast ferrocement segments and then assembling these segments at the site using methods, developed at SERC(G). This technique saves construction time and cost to a greater extent.

P. C. Sharma, Retired Head, Material Sciences, CSIR-Structural Engineering Research Centre, Ghaziabad, Chief Editor, NBM&CW, New Delhi. Dr. Rajeev Goel, Senior Principal Scientist, CSIR-Central Road Research Institute, New Delhi.

Introduction

Mini check dams are constructed across small and shallow rivers/streams or water catchment areas for diverting water flow to the sources of collection / storage or for diverting water into mini-canals. These structures are needed in large numbers, especially in hilly areas where the volume of available rain water run-off is quite large and small check dams are often constructed as barrier for stopping and diverting rain water flow to surface / underground tanks for storage of sufficiently large quantity of water. Stone or brick masonry have been used for construction of these structures. Dry stone stacks, lined with wire mesh/ crating (Fig. 1), wooden logs and sand bags are other materials in use at present. These methods of construction are time consuming and need very large amount of construction materials posing handling problem, do not provide water-tight barriers, can get easily damaged, higher cost and need frequent repairs. Mini check dams are mostly constructed in interior / difficult areas where transportation of materials and manpower for construction and maintenance is very difficult.

Cross section of a dry masonary chek dam
Figure 1: Cross section of a dry masonary chek dam at Ranichauri Tehri, Uttarakhand

To reduce the construction time, expenditure on maintenance and for providing leak-proof diversion structures, SERC(G) took the lead for development of mini check dams as part of National Drinking Water Mission, project of Government of India. Complete technology for construction of ferrocement mini check dams for heights upto 1.5m (suitable for shallow streams in hills and foothills) was developed at SERC(G) in 1986-87 and was demonstrated furing NDWM Training Programmes between 1988-92 period organised for Phed engineers, NGOs, and RES engineers in several states.

What is Ferrocement?

Cross section of a dry masonary chek dam
Figure 2: Ferrocement with or without skeletal reinforcement
Ferrocement is a durable long-lasting cement-based composite material. It is a modified form of reinforced cement mortar / micro-concrete, in which the reinforcement is finely subdivided and dispersed (Fig.2) in the matrix in order to achieve a closely spaced crack- free regime, coupled with excellent corrosion resistance and high impermeability to ingress in projects for irrigation, transportation, fishing, housing, storage, water supply, etc.

Apart from these, ferrocement has proved to be a very successful composite material for waterproofing, rehabilitation, and retrofitting of RCC and masonry structures.

Constituent of Ferrocement

The constituent of ferrocement are as follows: Cement, Sand, Water, Wire mesh, Admixtures, and Skeletal reinforcement

The cement used is normally Ordinary Portland Cement (33 or 43-grade). The well graded fine aggregate should comply with grading zone II of IS: 383-1970. Potable tap water (free from chlorine residue) is considered best for mixing mortar / micro-concrete, and curing. Steel wire meshes (Hot dip galvanized) are used to enhance the resistance to cracking, which is achieved due to the closely spaced small diameter reinforcement spread throughout the thickness and area of the ferrocement layer and high bond between reinforcement and matrix. Few selected admixtures such as pore sealants, bond improvers, and plasticizers are added to improve the workability, bond & strength, and water resisting properties. Skeletal reinforcement is used just to give the desired shape to ferrocement elements and for taking handling stresses.

The thickness of ferrocement elements generally varies from 10 to 50 mm whereas for water proofing rehabilitation & retrofitting applications, it varies from 16 to 50 mm depending upon type of structures and site specific requirements. In ferrocement construction, the minimum mesh reinforcement provided is 0.3% by volume. This may change depending upon the nature of the job. Two to six number of layers of hot dip annealed galvanized mesh reinforcement has been found adequate in most of the cases. Minimum cover to outermost layer of wire meshes is usually 4 to 5 mm which is enough due to the use of fine grain polymer modified matrix Square or Rectangular shape meshes performan better then Hexagonal meshes.

Details of Developed Technology
Precast Units


Precast Ferrocement Core Masonry Mould and Skeletal Reinforcement
Figure 3: Precast Ferrocement Core Masonry Mould and Skeletal Reinforcement
The ferrocement core, which is the basic unit, is cast in inverted position over solid masonry moulds plastered in slope on both the sides. Slope is provided for facilitating the de-moulding of the cast units. Figure-3 shows a masonry mould, reinforcement cage and cast units. The mould surface is covered with a mixture of grease and diesel oil and a lightly oiled hessian cloth is placed over the mould for acting as a separation layer. The reinforcement cages are fabricated and then tied over the mould. The amount of reinforcement will depend on the size of the check dam and has to be properly designed. During the casting process, reinforcing bars and meshes are left projected on the top side and also on both ends of the long sides. The bars projected on the top of the inverted cast core are lapped to the base reinforcement and become an integral part of the RCC base. The size and reinforcement in the base will depend on the height of the dam and water force it has to face. The bars and wire mesh projecting on long side ends are used for jointing of one precast unit to other adjoining units on both sides. A minimum of two layers of hot-dip galvanised square woven mesh are provided on either side of the bar reinforcement (Fig.4.)

Mortar is applied by hand and compacted using an orbital vibrator, specially developed by author1. The cement sand mortar (or micro-concrete), used for casting, is designed to have a minimum compressive strength of 25 MPa at the age of 28 days. The cast unit is de-moulded after 24 hours period and then cured for next 24 hours. After a gap of 48 hours, the unit is lifted of the mould, inverted and the RCC base is cast (Fig.5). Segment unit with base is inverted after 36 hours of casting and inside is finished with cement: sand mortar using the same mix as used in the casting of core unit. A coat of cement slurry is applied before applying the finishing layer for improving bond with the precast surface. Figure-6 shows a finished segment.

Ferrocement Core

Jointing of precast segments

After attaining enough strength, sufficient to resist handling and transportation stresses, the segments are shifted to site. After the excavation for foundation as per design, the foundation concrete is laid and compacted.

The precast units are placed in position over the foundation concrete after laying of bed mortar. The laps for projecting reinforcement bars and meshes are fixed and tied with the reinforcement of the adjoining units (Fig.7, 8,9).

Fig. 7, 8,9

Mortar is then applied over the joints and compacted. After 24 hours, sand/soil or gravel is filled in the cavity of the segment upto the top level (Fig.8) and the reinforcement projected is bent and the top is sealed with mortar layer.

In case of soil filling, a layer of plastic sheet placed over soil surface helps in separating top Ferro cement layer from soil. In case, the gravel filling is used, plastic sheet is not necessary, as some part of mortar will enter into the gravel cavities and provide anchorage to the sealing layer. Joints and sealing layer is cured for at least 7 days. Figure-7,8,9 shows a cross-section of a Ferro cement assembled check dam.

The basic information about the system has been provided in this paper but the structure needs to be designed as per the site conditions and requirements.

Test on Prototype Structure and Requirements

Ferrocement Check Dam 6m long under test at SERC(G) 1988-92
Figure 10: Ferrocement Check Dam 6m long under test at SERC(G) 1988-92
A prototype ferrocement check dam for 6.0 m span has been tested at SERC for a period of 36 months, during 1987-90 for evaluating the performance of joints and the structural system and for solving the difficulties/problems and for training techniques from NGOs which may come-up during such constructions. During the testing, the joints and the whole structure were found to be totally water tight. The overall performance was found satisfactory. The downstream of the test tank remained dry when the upstream was kept full of water (Fig.10).

The system developed at SERC(G) can be easily adopted for various other uses in hill road construction, soil conservation projects, and irrigation projects for providing support to soil.

Economics

Ferrocement check dams, developed at SERC, are cost-effective when compared with solid brickwork or stone masonry structures and save quantity of cement upto 20%. The saving in construction time can be upto 25%. Further, these can be constructed by local persons, just after one-day training. By this, employment is also generated at local level.

Use of Developed Technology for Construction of Mini Check Dams and River Training structures

Precast Ferrocement Check Dam Segment
Figire 11: Precast Ferrocement Check Dam Segment
Using the developed technology, easy to handle, transport, and join ferrocement segments (Fig.11), can be cast and assembled at site for making the check dam structures. The length of these structures are generally upto 10-15m but in case of longer structures, intermediate solid supports could be provided for dividing the long structure into several spans.

Openings for discharging the excess water can also be provided by modifying the joint areas. Check dams are assembled using segment units of smaller lengths (1 to 1.5m), depending upon the load handling and transportation facilities.

This developed technology is also found suitable for making guide bunds and diversion walls for bridges and river training works. Tests were carried out on both these types of structures from 1988 to 1992, and the results were very encouraging.

The dissemination of this technology was included in training programs-cum-demonstrations organised for National Drinking Water Mission in various states of the country for Public Health Engineering and Rural Development Department officials as well as for NGOs.

Special Vibration Device

A special vibration device was developed for thin ferrocement layers by author1 by modifying an orbital vibration device. This was successfully used for producing FC checkdams, segmental water tanks, Roof and walling units at SERC (G). If a ferrocement surface is vibrated during casting its strength, durability and service life is increased considerably.

Durability of Ferrocement Structures

Ferrocement is a highly durable composite construction material suitable for even producing Boats. There are examples when F.C. structures behaved and remained in use for many decades. InSharma India itself, F.C. water tanks constructed in 1974 are still in use. FC waterproofing treatment applied in 1976 is still intact. Some of the experimental structures produced during FC R&D work at SERC(G) (during 70-80) were in good shape till 2010 when these were dismantled to recover space. These included water tanks, grain bins, biogas holders, and a building using two leaf panel walls.

Acknowledgments

Financial support from National Technology Mission on Drinking Water is greatly acknowledged for funding this project which was carried out at SERC, Ghaziabad as a part of Drinking Water Mission project.

References
  • Sharma P.C. (1988), ‘Ferrocement structures for rain water harvesting schemes’, National seminar on issues of drinking water in hilly areas, Nainital, September.
  • Sharma P.C. (1999), ‘Construction techniques, casting, installation and maintenance of ferrocement products’, Keynote lecture in workshop on Ferrocement for Housing Development, February, The Institution of Engineers (India), Nagpur.
  • Sharma P.C. (1990), ‘Rain water harvesting techniques for drinking purposes’, Lecture Notes published for National Drinking Water Mission – Department of Rural Development, Government of India, March.
  • Sharma P.C. (1991), ‘Construction techniques, casting, installation and maintenance, Proceedings of Ferrocement Training Course at AuroviIle Building Centre, AuroviIle (Tamil Nadu), February.
  • Status Report on CSIR Programmes for National Drinking Water Mission - Published by CSIR, New Delhi.
  • Sharma P.C. (2013), ‘Construction and repair techniques for ferrocement applications’, Proceedings of International conference on Trends and Challenges in Concrete Structures’, Ghaziabad, December, pp.658-676.

NBM&CW October 2017

Durability of Concrete made with Marble Dust as partial replacement of Cement subjected to Sulphate attack

This experimental study presents the feasibility of the production of more durable concrete with marble dust as partial replacement of cement by 5%, 10%, 15% and 20% by weight. Standard concrete cube specimens of size Read More ...

Effect of Aggregate-Cement Ratio on Engineering Properties of Pervious Concrete

Pervious concrete is a composite type of material containing coarse aggregate, little or no fine aggregate, cement and water. In pervious concrete, carefully controlled amount of water and cementitious materials are used to Read More ...

Recent Advances in - Self-Compacting Concrete

In line of advanced concrete technology and research self-compacting concrete (SCC) contribute an innovative role for the development and its implementations worldwide. SCC, also known as self-leveling concrete Read More ...

Life-Cycle Management of Concrete Structures

A concrete structure is required to maintain its functions and performance during its design service life. However, serious damages have been sometimes found, which may be caused by physical and chemical actions. Read More ...

Green, Sustainable Construction: Solutions for Affordable Housing

Concrete is the second most consumed material in the world after water and it is used most widely in the construction industry due to its high compressive strength and other properties.[1] Therefore, the basis of Read More ...

Aesthetical Integration in High Performance Concrete for Infra Construction

Concrete, the wonder material that has shaped our surroundings, was invented in the mid-18th century, and continues to be the most widely used construction material. Concrete came to architects and designers as a boon Read More ...

Comparative Study of concrete mix design using IS and ACI methods with and without super-plasticizer

Concrete is a composite material consisting of cement, water, and aggregates. These ingredients can be mixed in different ratios to attain desired strengths. Though rough mix ratios for different strengths Read More ...

Non destructive testing for determining the strength of concrete

Civil engineering infrastructures are designed to operate for long periods of time, such as 50 to 100 years. However, several unpredictable and uncontrollable factors reduce their expected performance and life Read More ...

An Experimental investigation on utilizations of Marble Dust as partial replacement of Cement in Concrete

Marble dust is an industrial by-product obtained during sawing, shaping, and polishing of marble and causes a serious problem to the environment. Research indicate that the effect of mixing marble dust on the Read More ...

Sustainable Concrete - An Inevitable Need for Present & Future

Concrete has become, by far, the most widely used construction material in the world. It is surpassed only by water as the most used material on earth. Concrete is perceived and identified as the provider Read More ...

Structural Behaviour of High Performance Fiber Reinforced Concrete Beam Column Joints Under Cyclic Loading

The strength & ductility of structures primarily depend on proper detailing of reinforcement in beam column joints. Under seismic excitations, beam-column joint region is subjected to high horizontal & vertical Read More ...

Translucent Concrete by Using Optical Fibers and Glass Rods

Translucent Concrete
Concrete is traditionally a solid, substantial building material. It needs a makeover. Small buildings are replaced by high-rise buildings and skyscrapers. There arises one of the major problem in deriving natural Read More ...

Practical applications of UHPC & HPC concrete by generative development...

Fiber Reinforced UHPC
Ultra High Performance Concrete (UPHC) is one of the most modern concretes developed during the last decade. It's a material generally characterized by (although not limited to the one) having Read More ...

High Performance Concrete for High-rise Construction

Self Compacting Concrete
Concrete is ubiquitous in our built environment - be it in buildings, roads, bridges, railways, or dams. Global growth in concrete consumption is partly due to the rapid industrialization of developing Read More ...

The Basic Facts on Admixtures for Concrete

Basic Facts on Admixtures
Chemical admixtures are the forth ingredient of the concrete which is inevitable for the modern concretes. The properties of the concrete can be modified either in the plastic or the hardened state as required Read More ...

Small Ferrocement Dams to Recharge Groundwater

Ferrocement Dams
Ferrocement uses less cement and the thickness is also very small as, such intelligent use of this material is possible in water retaining structures. In Mexico, ferrocement dams with curved sections Read More ...
NBM&CW

New Building Material & Construction World

New Building Material & Construction World
MGS Architecture

Modern Green Structures & Architecture

Modern Green Structures & Architecture
L&ST

Lifting & Specialized Transport

Lifting & Specialized Transport
II&TW

Indian Infrastructure & Tenders Week

Indian Infrastructure & Tenders Week