Ajax Fiori — Serving the Hydroelectric Projects

Ajax Fiori Hydroelectric Projects

The world is constantly in search for renewable, non-polluting and cost effective power solutions. One such solution is hydroelectricity. Construction equipment manufactured by Ajax Fiori Engineering (I) Pvt. Ltd. has been used in the construction of large number of hydroelectric projects. A few of these are mentioned below, but first, a brief summary of the benefits of hydroelectricity.

Hydroelectricity:
  • is non-polluting
  • is renewable
  • can reduce the amounts spent on oil imports
  • can be an important source of revenue for a country. In Bhutan, hydroelectricity has become one of, if not the most important revenue source today
  • Offers means of responding within seconds to changes in load demand
  • Offers benefits for irrigation, and this is important in a country like India, where such a huge population is engaged in agriculture.
India has a great potential for hydroelectricity, though only a small percentage of this has been tapped. However, new projects are constantly being commissioned.

Some of the hydroelectric projects at which Ajax Fiori machines have been used are:

Tala Hydroelectric Project:

This 1020 MW project, still underway, is located close to Phunstsholing, the gateway of Bhutan, and is planned to be commissioned in June 2006. The Tala Project is the biggest Indo – Bhutan joint project.

10 Ajax Fiori Transit Mixers were used for concreting of 22.64 km of tunnelling for this project.

Ajax Fiori Hydroelectric Projects

These machines were used by the 3 major contractors undertaking this project – Hindustan Construction Company, Jaiprakash Industries Ltd. and L & T – ECC Group.

The machines, which were commissioned in January 1999, were used to deliver concrete from a batching plant to the dam and tunnel, and during the work there, till November 2001, transported approximately 80,000 m3 of concrete.

Malana Hydroelectric Power Project

Located on the River Malana, in the Parbati Basin in the Kullu region of Himachal Pradesh, the project involved the construction of a barrage / reservoir and head works structures, which include a power tunnel, a surface penstock and a surface power house complex.

The 86 MW project, at the time of construction was one of the largest hydro works projects in India. It is designed to generate 370 million units in a 90% dependable year. The power so generated is being delivered to the Haryana State Electricity Board for distribution.

The Malana Power Company used five Ajax Fiori Selfloading Mobile Concrete Mixers for concrete lining of the tunnels in this project. The flexibility and utility of these machines made them ideal for working in narrow tunnel conditions.

Sewa Hydroelectric Project

Ajax Fiori Hydroelectric Projects
This 120 mw is located in the Basholi Tehsil region of Kathua district of Jammu and Kashmir, on the river Sewa, a tributary of the river Ravi. This project is expected to generate around 534 million units of power in a 90% dependable year.

At this project Patel Engineering Ltd., Satav Infrastructure Pvt. Ltd., V Arks Engineers Pvt. Ltd. have used Radial Lift Arm Batching plants and Transit mixers and Site Dumpers manufactured by Ajax Fiori, for concreting of the dam and tunnel.

Priyadarshini Jurala Hydroelectric Project

This 234 mw project is being jointly implemented by Apgenco and the Government of Karnataka, and the first unit is expected to be commissioned in March 2007. At this project V Arks Engineers Pvt. Ltd has used 1 bin type batching plant and 2 transit mixers of Ajax Fiori, for concreting of tunnel.

NBMCW May 2006

Click Here
To Know More / Contact The Manufacturer
Please provide your details we will contact you as soon as possible
Please let us know your name.
Invalid Input
Please let us know your Designation.
Invalid Input
Please let us know your City.
Please let us know your State.
Please let us know your Country.
Please let us know your Contact Number.
Please let us know your email address.
Please brief your query.

Exposed Reckli Finish Retaining Wall

The Reckli Finish Exposed Retaining Wall at Sabarmati Riverfront in Ahmedabad, using a 9m high Exposed Retaining Wall with a textured finish, and outer face using Formliner Formwork (known as Reckli), has grabbed the eyes of the world. Besides Read More ...

Delhi Metro Terminal 1 IGI Airport Terminal

One of the great benefits of Delhi Metro Phase 3 is that the domestic terminals of the Indira Gandhi Intl’ Airport have got Metro connectivity - a boon to the city’s domestic air passengers. While the Airport Express Link provides Read More ...

Simulating oversize and heavy vehicle manoeuvres using AutoTURN® from Transoft Solutions

Narrow mountain roads, steep hills and challenging ‘S’ curves are just part of the landscape in the ‘toe’ of Southern Italy, where wind farms are becoming a common part of the countryside. With green technology like wind Read More ...

Atlas Copco XA316 and XAT266 portable air compressors for Mumbai underground metro line

Atlas Copco portable air compressors have been deployed for the first underground metro line in Mumbai, and they are not just under the supervision of Mumbai Metro Rail Corporation Limited (MMRCL) but also under Read More ...

Indira Paryavaran Bhawan - First On-site Zero Net Energy Building of India

A zero-energy or a net zero building is a building with zero net energy consumption from outside source, which means that the total amount of energy used by the building on an annual basis is almost equal to Read More ...

Making of a Green Data Centre

Data centres make up 3% of global energy consumption. The main reason behind data centres being major energy guzzlers is the IT processing power, which has increased substantially to meet the growing Read More ...

Apollo ValueTec Plant Gives Competitive Edge to Rana Builders

Dhaka-based Rana Builders (Pvt.) Ltd. specialises in construction of roads, bridges and buildings. When purchasing a new asphalt-mixing plant, it wanted a product that would help meet its objective of on-time delivery Read More ...

BHAI concrete batch mix plant working at Asia’s largest waste-water treatment plant

Delhi Jal Board is setting up a 318 MLD (70 MGD) wastewater treatment plant at GT Karnal Road on the outskirts of Delhi. The ₹414.78 crore project, said to be the largest in Asia, is being constructed by EPC contractor-Larsen & Toubro Read More ...

The Fast Lane to Growth

When the National Highways Authority of India (NHAI) last widened the Vijayawada-Chilakaluripet Highway in the early 2000s, the country was at the beginning of its exponential economic growth. Since then, the nation’s GDP Read More ...

Insitu Investigation of Cinder Mound For Building Construction - A Case Study

Cinder is a waste generated as coal residues from the blast furnace of thermal power plant. It was accumulated over a long periods near railway station, Jamshedpur, Jharkhand, India. This dumping Read More ...

SoilTech Mk. III - 3rd Generation nano-polymer stabilization

Golfshire is a super-premium residential project in Bangalore, comprising luxury villas, a 18-hole PGA standard golf course, a large convention centre with seating capacity of 5000, and a 5-star hotel. The project is Read More ...

Especially Designed Rope Suspended Platform for Dam & Silo Projects

New Age Construction Equipment Engineering Company is one of the leading manufacturers of construction equipment like Rope Suspended Working Platforms (Gondolas/ Cradles), Bar Bending Machines Read More ...

New Age Offers Customized Solutions with Higher Productivity & Safety

As a leading manufacturer of construction equipment, we believe in superior performance, higher productivity & safety, faster execution and timely completion of projects,” says Mr. Jayesh Vadukiya Read More ...

Rehabilitation of National Highway at Tripura-Assam

The National Highway NH-44 is a major road artery for the North-East. The stretch of this highway leading to the border of Assam and Tripura (two states in the north-east of India), is the only land-link between Read More ...

Wirtgen Milling & Recycling Machines give Excellent result at NH-2

Wirtgen most compact and versatile machines W2000 and WR240 have been used for milling and cold in situ recycling works by contractor Soma during the road rehabiliation of Varansi-Aurangabad section Read More ...

KYB-Conmat's Advanced Mechanization Parallel Lower Ganga Canal Lining Project

Tougher norms for quality & safety in the industry have pushed contractors & developers towards advanced mechanization for their projects to deliver quality results in set timelines. It has also Read More ...
NBM&CW

New Building Material & Construction World

New Building Material & Construction World
MGS Architecture

Modern Green Structures & Architecture

Modern Green Structures & Architecture
L&ST

Lifting & Specialized Transport

Lifting & Specialized Transport
II&TW

Indian Infrastructure & Tenders Week

Indian Infrastructure & Tenders Week