SoilTech Mk. III - 3rd Generation nano-polymer stabilization

Treats the roads of Prestige Golfshire, Bangalore

Prestige Golfshire


SoilTech Mk. III - 3rd Generation nano-polymer stabilization
Golfshire is a super-premium residential project in Bangalore, comprising luxury villas, a 18-hole PGA standard golf course, a large convention centre with seating capacity of 5000, and a 5-star hotel. The project is spread across 320 acres on Nandi Hill Road, which is 15 minutes-drive from Bangalore International Airport.

Prestige Estates decided to use SoilTech to treat the roads at the new Golfshire project. SoilTech was selected because of its high-speed construction characteristics and superior quality. Prestige’s Project Manager Mr. Hara Kumar said that by using SoilTech, the budgeted cost of the project was reduced by 25%.

The total arterial road requirement of the project was 7.5 km in length with two carriageways of 7.5 metre average width each. The project, which started in August 2008 during the monsoon season, was completed and handed over to the developer by November-end, 2008.

70,000 litres of SoilTech was used. The standard process, as recommended for the usage of polymer-based soil stabilizer, was followed at all levels. It included:
  • Test Reports prior to designing
  • Designing
  • Construction Methodology
  • Construction Equipment required
  • Tests undertaken after 10 days and 90 days of stabilization
Design process

Designing for the pavements was undertaken based on characteristics of the soil, life of the road, expected traffic, and its composition.

Material Design: The required characteristics of soil for the usage of polymer-based soil stabilizer with dosage of 0.5 percent of the dry weight of the soil include Plasticity Index (PI) of the soil to be between 5 and 15 and CBR of more than 5.

If the soil does not meet the above criteria, the soil is modified by addition of clay or aggregate. Though the CBR of the soil was good, the PI was not within the required range as it had more clay content. The PI was brought down by addition of aggregate. The soil and aggregate mix was to be 80% soil and 20% aggregate. The composition of aggregate was 30% 20 mm metal, 30% 12 mm metal and 40% quarry dust.

SoilTech Mk. III - Design Process

Pavement Design

There was one common specification including design life of 6MSA and expected traffic of 3000 PCU. Based on this, the pavement was designed as 150 mm thick with dosage of stabilizer being 1.5 liters per sqm.
  • Depth – 150 mm
  • Length – 7-5 km
  • SoilTech polymer – 1.5 litres p/m2
  • Material used – insitu plus 20% imported aggregate
  • Traffic Volume 20Msa
  • Control CBR <5
  • Stabilized CBR >122
  • Completion Time 60 days.
Seal – unsealed for 3 years then 30 mm BC

Construction Methodology


Construction methodology was devised, based on the design process and included the following steps:
  • Pavement was outlined and pegged to maintain the alignment and levels
  • Soil was spread and modified; it was ripped after modification
  • Admixture of soil stabilizer and water was added to the ripped surface to reach 1% above OMC and mixed to evenly distribute the admixture
  • Profiled and compacted.
SoilTech Mk. III - 3rd Generation nano-polymer stabilization

Construction Equipment used
  • Hydraulic motor grader with ripper
  • Tractor with attached cultivator
  • Water tanker with attached sprinkler and carrying capacity of 4000 liters
  • Smooth drum vibratory soil 10-ton compactor
  • Backhoe loader for material handling and miscellaneous works
The construction methodology was strictly followed and the above mentioned equipment were efficiently utilized to complete the project in three months during the monsoon season.

The Results

Field CBR tests were undertaken after 100 days of preparation of pavement. The average CBR was found to be 85.

The client was fully satisfied and opted for using polymer-based soil stabilizer in another project as well.

The stabilized layer did not show any wear and tear after 9 years of extensive construction activity. In 2012, Prestige started laying concrete over the stabilized layer. The thickness of the layer was 100 mm.

Benefits of Soiltech Mk. III stabilizer
  • Utilizes existing road construction equipment
  • Faster to construct
  • Constructed according to international and local standards
  • Meets and exceeds all CBR/UCS strength requirements
  • Lower carbon emissions
  • Lower cost
  • Pavement flexibility means less maintenance and reduced costs
Polymer Applications
  • Stabilisation of roads, parking lots and golf pathways
  • Stabilizing bunker walls
  • Bunkers – keep soils separated
  • Lining and sealing of dams
PolySeal Dam Liners

PolySeal is a cost-effective spray-on dam liner. The earthen dam is lined with a geotextile and then three coats of PolySeal are sprayed over the lining.
  • 10-year UV warranty
  • Environmental-friendly for fish, water-fowls and plants
  • Water is drinkable
  • Quick application
  • Elastomer with good tensile strength.

NBM&CW November 2017

Click Here
To Know More / Contact The Manufacturer
Please provide your details we will contact you as soon as possible
Please let us know your name.
Invalid Input
Please let us know your Designation.
Invalid Input
Please let us know your City.
Please let us know your State.
Please let us know your Country.
Please let us know your Contact Number.
Please let us know your email address.
Please brief your query.

Simulating oversize and heavy vehicle manoeuvres using AutoTURN® from Transoft Solutions

Narrow mountain roads, steep hills and challenging ‘S’ curves are just part of the landscape in the ‘toe’ of Southern Italy, where wind farms are becoming a common part of the countryside. With green technology like wind Read More ...

Atlas Copco XA316 and XAT266 portable air compressors for Mumbai underground metro line

Atlas Copco portable air compressors have been deployed for the first underground metro line in Mumbai, and they are not just under the supervision of Mumbai Metro Rail Corporation Limited (MMRCL) but also under Read More ...

Indira Paryavaran Bhawan - First On-site Zero Net Energy Building of India

A zero-energy or a net zero building is a building with zero net energy consumption from outside source, which means that the total amount of energy used by the building on an annual basis is almost equal to Read More ...

Making of a Green Data Centre

Data centres make up 3% of global energy consumption. The main reason behind data centres being major energy guzzlers is the IT processing power, which has increased substantially to meet the growing Read More ...

Apollo ValueTec Plant Gives Competitive Edge to Rana Builders

Dhaka-based Rana Builders (Pvt.) Ltd. specialises in construction of roads, bridges and buildings. When purchasing a new asphalt-mixing plant, it wanted a product that would help meet its objective of on-time delivery Read More ...

BHAI concrete batch mix plant working at Asia’s largest waste-water treatment plant

Delhi Jal Board is setting up a 318 MLD (70 MGD) wastewater treatment plant at GT Karnal Road on the outskirts of Delhi. The ₹414.78 crore project, said to be the largest in Asia, is being constructed by EPC contractor-Larsen & Toubro Read More ...

The Fast Lane to Growth

When the National Highways Authority of India (NHAI) last widened the Vijayawada-Chilakaluripet Highway in the early 2000s, the country was at the beginning of its exponential economic growth. Since then, the nation’s GDP Read More ...

Insitu Investigation of Cinder Mound For Building Construction - A Case Study

Cinder is a waste generated as coal residues from the blast furnace of thermal power plant. It was accumulated over a long periods near railway station, Jamshedpur, Jharkhand, India. This dumping Read More ...

Especially Designed Rope Suspended Platform for Dam & Silo Projects

New Age Construction Equipment Engineering Company is one of the leading manufacturers of construction equipment like Rope Suspended Working Platforms (Gondolas/ Cradles), Bar Bending Machines Read More ...

New Age Offers Customized Solutions with Higher Productivity & Safety

As a leading manufacturer of construction equipment, we believe in superior performance, higher productivity & safety, faster execution and timely completion of projects,” says Mr. Jayesh Vadukiya Read More ...

Rehabilitation of National Highway at Tripura-Assam

The National Highway NH-44 is a major road artery for the North-East. The stretch of this highway leading to the border of Assam and Tripura (two states in the north-east of India), is the only land-link between Read More ...

Wirtgen Milling & Recycling Machines give Excellent result at NH-2

Wirtgen most compact and versatile machines W2000 and WR240 have been used for milling and cold in situ recycling works by contractor Soma during the road rehabiliation of Varansi-Aurangabad section Read More ...

KYB-Conmat's Advanced Mechanization Parallel Lower Ganga Canal Lining Project

Tougher norms for quality &amp; safety in the industry have pushed contractors &amp; developers towards advanced mechanization for their projects to deliver quality results in set timelines. It has also Read More ...

3D Design Software Helps Engineers Prove Their Clients’ New “Home” is Ready for Work

Transoft VLMK
Whether it’s moving across town or across the country, there are always boxes to pack and trucks to fill. But what if the core of your business IS trucks and you didn’t have a choice about moving? That’s exactly Read More ...

Comparative Study of Basalt And Carbon FRP Bonded Steel Beams and its Finite Element Modelling

Finite Element Modelling
The use of Fibre Reinforced Polymer (FRP) sheets to strengthen the steel structures has become an attractive option which may ensure confident retrofitting of existing steel structures. Conventional strengthening Read More ...

A Case Study on Application of Exterior Insulation Finishing System and Heat Reflective coating for Energy Efficient Building

Exterior Insulation Finishing System
Exterior Insulation Finishing System is a lightweight synthetic wall cladding that includes foam plastic insulation and thin synthetic coatings. There is also an EIFS-like product called a direct-applied Read More ...
NBM&CW

New Building Material & Construction World

New Building Material & Construction World
MGS Architecture

Modern Green Structures & Architecture

Modern Green Structures & Architecture
L&ST

Lifting & Specialized Transport

Lifting & Specialized Transport
II&TW

Indian Infrastructure & Tenders Week

Indian Infrastructure & Tenders Week