3D Design Software Helps Engineers Prove Their Clients’ New “Home” is Ready for Work

Transoft VLMK

Whether it’s moving across town or across the country, there are always boxes to pack and trucks to fill. But what if the core of your business IS trucks and you didn’t have a choice about moving? That’s exactly what happened to Portland’s J+D Refrigeration. With the new Milwaukie Light Rail Project in Oregon’s biggest city, some businesses had to move to new locations across the city. J+D Refrigeration was one of the businesses forced to find a new location as their old location was appropriated to make way for part of the tracks and surrounding infrastructure. They found a location they liked in Clackamas County, but before they could move in, they had to know whether their fleet of refrigerated trucks could maneuver around the site. They called on VLMK Consulting Engineers in Portland to help them with the transition. “We got involved pretty early on when they realized that they were going to be ‘dislocated’,” says Brian Dubal, one of the senior engineers at VLMK. “The local authorities told them they would have to move as Portland was building their new light rail transit system right through their existing site. Once we got into the design, we realized we needed to check out some of the clients’ concerns and that’s when we got AutoTURN Pro.”

J+D Refrigeration moved into their new warehouse facility with approximately 150,000 square feet with 13 loading dock doors and a weigh scale on the premises. Prior to moving in, one of their main concerns was the site grading around the weigh scale. With WB-67 semi-trailer trucks coming and going throughout the day, it was up to Brian and his team to ensure safe operations. “They were really more worried about the trucks tipping and being at a weird angle,” says Dubal. “It was also about offsetting the weigh scale. They were worried about having that kind of issue in approaching the truck scale.” “We ended up having to do some grade changes in the area mid-design, so some of the grades, while not steep, would have been better if they were flat. It was good to be able to show them that it wasn’t a problem. They are pleased with that,” he continued.

Transoft VLMK
One feature of AutoTURN Pro that Dubal liked was the custom vehicle creation within the extensive vehicle libraries. While there is already a WB-67 included in the library, he wanted to add some specifications that VLMK had done previously. “We’ve actually measured a truck turning with the wheels forward and the stock template (in the AutoTURN Pro library) shows it with the wheels back,” says Dubal. “We modified the standard template because in Portland a lot of the WB-67 trucks move their back-trailer wheels forward, which gives them a bit more maneuverability,” says Dubal. “It was pretty cool to be able to modify that to match the custom template.”

When it comes to client satisfaction, VLMK decided to follow the adage ‘Show, Don’t Tell.’ Dubal used the simulation playback feature within AutoTURN Pro to animate the section of the site he wanted his clients at J+D Refrigeration to see. Being able to see their proposed site in 3D made all the difference. He described his process. “I started a program that recorded one of my monitors and then ran the 3D animation (within AutoTURN Pro). When the animation finished, I stopped recording. “says Dubal. “As soon as the client saw it, they said ‘Oh, we don’t have any problems.’ Looking at plans, most people have a tough time visualizing what something is going to look like. Being able to say ‘what is the real impact?’ and getting the right answer is key.

AutoTURN was first developed in 1991 and set the standard for CAD software of its kind. Now that clients like VLMK Consulting Engineers are beginning to adopt AutoTURN Pro, companies across the engineering spectrum are harnessing the computational power of designing in a 3D environment.

Simulating oversize and heavy vehicle manoeuvres using AutoTURN® from Transoft Solutions

Narrow mountain roads, steep hills and challenging ‘S’ curves are just part of the landscape in the ‘toe’ of Southern Italy, where wind farms are becoming a common part of the countryside. With green technology like wind Read More ...

Atlas Copco XA316 and XAT266 portable air compressors for Mumbai underground metro line

Atlas Copco portable air compressors have been deployed for the first underground metro line in Mumbai, and they are not just under the supervision of Mumbai Metro Rail Corporation Limited (MMRCL) but also under Read More ...

Indira Paryavaran Bhawan - First On-site Zero Net Energy Building of India

A zero-energy or a net zero building is a building with zero net energy consumption from outside source, which means that the total amount of energy used by the building on an annual basis is almost equal to Read More ...

Making of a Green Data Centre

Data centres make up 3% of global energy consumption. The main reason behind data centres being major energy guzzlers is the IT processing power, which has increased substantially to meet the growing Read More ...

Apollo ValueTec Plant Gives Competitive Edge to Rana Builders

Dhaka-based Rana Builders (Pvt.) Ltd. specialises in construction of roads, bridges and buildings. When purchasing a new asphalt-mixing plant, it wanted a product that would help meet its objective of on-time delivery Read More ...

BHAI concrete batch mix plant working at Asia’s largest waste-water treatment plant

Delhi Jal Board is setting up a 318 MLD (70 MGD) wastewater treatment plant at GT Karnal Road on the outskirts of Delhi. The ₹414.78 crore project, said to be the largest in Asia, is being constructed by EPC contractor-Larsen & Toubro Read More ...

The Fast Lane to Growth

When the National Highways Authority of India (NHAI) last widened the Vijayawada-Chilakaluripet Highway in the early 2000s, the country was at the beginning of its exponential economic growth. Since then, the nation’s GDP Read More ...

Insitu Investigation of Cinder Mound For Building Construction - A Case Study

Cinder is a waste generated as coal residues from the blast furnace of thermal power plant. It was accumulated over a long periods near railway station, Jamshedpur, Jharkhand, India. This dumping Read More ...

SoilTech Mk. III - 3rd Generation nano-polymer stabilization

Golfshire is a super-premium residential project in Bangalore, comprising luxury villas, a 18-hole PGA standard golf course, a large convention centre with seating capacity of 5000, and a 5-star hotel. The project is Read More ...

Especially Designed Rope Suspended Platform for Dam & Silo Projects

New Age Construction Equipment Engineering Company is one of the leading manufacturers of construction equipment like Rope Suspended Working Platforms (Gondolas/ Cradles), Bar Bending Machines Read More ...

New Age Offers Customized Solutions with Higher Productivity & Safety

As a leading manufacturer of construction equipment, we believe in superior performance, higher productivity & safety, faster execution and timely completion of projects,” says Mr. Jayesh Vadukiya Read More ...

Rehabilitation of National Highway at Tripura-Assam

The National Highway NH-44 is a major road artery for the North-East. The stretch of this highway leading to the border of Assam and Tripura (two states in the north-east of India), is the only land-link between Read More ...

Wirtgen Milling & Recycling Machines give Excellent result at NH-2

Wirtgen most compact and versatile machines W2000 and WR240 have been used for milling and cold in situ recycling works by contractor Soma during the road rehabiliation of Varansi-Aurangabad section Read More ...

KYB-Conmat's Advanced Mechanization Parallel Lower Ganga Canal Lining Project

Tougher norms for quality & safety in the industry have pushed contractors & developers towards advanced mechanization for their projects to deliver quality results in set timelines. It has also Read More ...

Comparative Study of Basalt And Carbon FRP Bonded Steel Beams and its Finite Element Modelling

Finite Element Modelling
The use of Fibre Reinforced Polymer (FRP) sheets to strengthen the steel structures has become an attractive option which may ensure confident retrofitting of existing steel structures. Conventional strengthening Read More ...

A Case Study on Application of Exterior Insulation Finishing System and Heat Reflective coating for Energy Efficient Building

Exterior Insulation Finishing System
Exterior Insulation Finishing System is a lightweight synthetic wall cladding that includes foam plastic insulation and thin synthetic coatings. There is also an EIFS-like product called a direct-applied Read More ...
NBM&CW

New Building Material & Construction World

New Building Material & Construction World
MGS Architecture

Modern Green Structures & Architecture

Modern Green Structures & Architecture
L&ST

Lifting & Specialized Transport

Lifting & Specialized Transport
II&TW

Indian Infrastructure & Tenders Week

Indian Infrastructure & Tenders Week