ElectroMech Solution for Kochi Metro Rail Project

Electromech Kochi Rail Project

ElectroMech cranes are rugged, reliable and have a long life. Several EPC companies use them confidently over the years on a number of projects – one after the other. Admirably, before relocating them from one project to another, they can be reconfigured and modified to suit the new requirement. This ensures optimal utilisation of assets and also reduces project costs. The cranes being used by Soma for the Kochi Metro rail project are a testimony to this.

Kochi is a cosmopolitan city with a bustling commercial port in Kerala, India. It is the financial capital of the state, with a population of more than 2 million. The city's population is rapidly growing and so is its expanse. After cities like Mumbai, Delhi and Bangalore, Kochi is the first tier II city in India to start the execution of a metro rail project to provide an efficient mass transportation system. The Kochi metro rail is expected to be the fastest constructed metro rail project in the country. The INR 50 billion (USD 860 million) project consists of 22 stations from Aluva to Petta. The metro rail at Kochi will run on elevated viaduct tracks mounted on prestressed U/I concrete girders with pile/open foundations.

Electromech Soma
Electromech helped Soma modify, upgrade and reuse its existing cranes at Kochi Metro Project that were previously used on several of their other projects. This helped in substantial reduction of project cost and time in procuring new cranes.

Handling Challenges

Soma has been awarded the second phase of this metro rail project; which includes the stations from Jawaharlal Nehru Stadium to Ernakulam South. In order to ensure quick and timely completion of the project, Soma set up a casting yard near the project site in Kalamaserry to manufacture pier caps, pier bases, pre-stressed U beams and I beams. The complete yard is divided into 4 regions to carry out the work efficiently and control the entire process. The first area is for machining and processing of bars and rods used for the concreting process. The second and third bays are 300m length each and will provide the concrete segments required for viaducts and metro tracks. The next area is allocated for the storage and handling of these finished products. The material handling requirement for this project included TMT bars, precast moulds and various precast segments at different stages of their production. The project team at Soma was interested in a solution which allowed the reuse of existing ElectroMech cranes that were used at Soma's other projects.

ElectroMech Cranes

Team ElectroMech welcomed this tough challenge and designed a solution which was technically feasible and economically viable. It was a proud moment for ElectroMech to see its cranes still standing tall after being used at other project sites. A detailed study of the handling requirements and production volume in this huge casting yard was conducted by the ElectroMech design team, who recommended using 5 gantry cranes. Of these, 4 were to be used for production and one in the dispatch bay for loading precast segments on to the trucks/trailers. Every crane was expected to handle heavy loads, be precise in operations and cover long bays. In addition, two cranes in a bay would often have to work in tandem.

Solution for Bay – 1

As desired by Soma, for the reuse of the existing cranes, a team from Cranedge, ElectroMech's service subsidiary, conducted a thorough audit of the existing cranes. In order to meet the new requirements of load, span and synchronisation, Cranedge suggested some modifications and upgrades for the existing ElectroMech cranes owned by Soma. These recommendations were not only to meet the new requirements but also to enhance the life of the cranes. Considering the load to be lifted and the stability required to handle the load, 2 gantry cranes each of 50MT SWL, 28m span and 12m height of lift were required to work in tandem. The cranes to be modified and used were originally manufactured by ElectroMech in 2008 and supplied to Soma to be used for their Panipat-Jalandhar highway project. They were used for handling precast structures for bridge construction.

These cranes were modified by Cranedge from the original span of 20m to the new span of 28m. They are now being used for handling the entire process from laying of outer and inner moulds, handling the manufactured components and storage of finished products. The complete modification project was carried out at our works in 2013.

ElectroMech Solution

What does the customer say?
Our casting yard required heavy duty and high capacity cranes for casting of huge structures. Hence we installed ElectroMech cranes to handle our process. These cranes have helped us achieve a faster rate of production with no downtime, higher but stable speeds and no maintenance costs.
- Inavalli Ram Babu, AGM Civil Projects, Soma Enterprises Ltd.

Solution for Bay – 2

The operations in the second bay are critical, requiring two 80MT gantry cranes. These 2 cranes also work in tandem to cover a bay length of 300m and provide a combined load capacity of 160MT while maintaining stability during the handling of the end product. This is a very specific operation and requires precise dimension control with respect to the manufacturing of girders. Here, first the outer mould has to be placed on the ground. Then, the inner mould has to be placed within the outer mould and then the template has to be placed within these structures. This process is carried out simultaneously in two adjacent rows. The cranes are then used to move finished precast segments to the storage area. These cranes were modified by Cranedge at our works from existing 120MT, 22m span gantry cranes to 80MT, 32m span gantry cranes with 10m height of lift. The modifications included the change of span of the girders and modification of the existing trolley to support a load of 80MT. These cranes were originally manufactured by ElectroMech in 2009 and supplied to Soma for similar application of handling pre-cast structures for flyover construction in Bangalore.

How Soma benefitted from ElectroMech Solution

  • Saving of nearly Rs.35 million (approximately US$ 0.6 million) of the capital cost
  • Considerable time was saved
  • Safety assurance equivalent to new cranes
  • Enhanced life - a result of 'factory-fitting'
  • Trouble-free performance on site due to complete overhaul
  • Higher productivity due to correctly configured cranes
  • Stability even at higher load through synchronous operation
  • Modified cranes covered under warranty

Challenges

  • Reuse of existing cranes supplied for previous projects
  • Modification of cranes to suit current requirements
  • Handling of long & heavy pre-cast structures
  • Covering long bays of around 300 metres
  • Tandem operation of two cranes in each bay

Solutions

  • Refurbishment of existing cranes with thorough design analysis to supply cranes as good as new
  • Synchronous operation to handle long and heavy capacity structures
  • Heavy duty cranes to cover the entire length of 300 metres

NBMCW February 2015

Click Here
To Know More / Contact The Manufacturer
Please provide your details we will contact you as soon as possible
Please let us know your name.
Invalid Input
Please let us know your Designation.
Invalid Input
Please let us know your City.
Please let us know your State.
Please let us know your Country.
Please let us know your Contact Number.
Please let us know your email address.
Please brief your query.

Simulating oversize and heavy vehicle manoeuvres using AutoTURN® from Transoft Solutions

Narrow mountain roads, steep hills and challenging ‘S’ curves are just part of the landscape in the ‘toe’ of Southern Italy, where wind farms are becoming a common part of the countryside. With green technology like wind Read More ...

Atlas Copco XA316 and XAT266 portable air compressors for Mumbai underground metro line

Atlas Copco portable air compressors have been deployed for the first underground metro line in Mumbai, and they are not just under the supervision of Mumbai Metro Rail Corporation Limited (MMRCL) but also under Read More ...

Indira Paryavaran Bhawan - First On-site Zero Net Energy Building of India

A zero-energy or a net zero building is a building with zero net energy consumption from outside source, which means that the total amount of energy used by the building on an annual basis is almost equal to Read More ...

Making of a Green Data Centre

Data centres make up 3% of global energy consumption. The main reason behind data centres being major energy guzzlers is the IT processing power, which has increased substantially to meet the growing Read More ...

Apollo ValueTec Plant Gives Competitive Edge to Rana Builders

Dhaka-based Rana Builders (Pvt.) Ltd. specialises in construction of roads, bridges and buildings. When purchasing a new asphalt-mixing plant, it wanted a product that would help meet its objective of on-time delivery Read More ...

BHAI concrete batch mix plant working at Asia’s largest waste-water treatment plant

Delhi Jal Board is setting up a 318 MLD (70 MGD) wastewater treatment plant at GT Karnal Road on the outskirts of Delhi. The ₹414.78 crore project, said to be the largest in Asia, is being constructed by EPC contractor-Larsen & Toubro Read More ...

The Fast Lane to Growth

When the National Highways Authority of India (NHAI) last widened the Vijayawada-Chilakaluripet Highway in the early 2000s, the country was at the beginning of its exponential economic growth. Since then, the nation’s GDP Read More ...

Insitu Investigation of Cinder Mound For Building Construction - A Case Study

Cinder is a waste generated as coal residues from the blast furnace of thermal power plant. It was accumulated over a long periods near railway station, Jamshedpur, Jharkhand, India. This dumping Read More ...

SoilTech Mk. III - 3rd Generation nano-polymer stabilization

Golfshire is a super-premium residential project in Bangalore, comprising luxury villas, a 18-hole PGA standard golf course, a large convention centre with seating capacity of 5000, and a 5-star hotel. The project is Read More ...

Especially Designed Rope Suspended Platform for Dam & Silo Projects

New Age Construction Equipment Engineering Company is one of the leading manufacturers of construction equipment like Rope Suspended Working Platforms (Gondolas/ Cradles), Bar Bending Machines Read More ...

New Age Offers Customized Solutions with Higher Productivity & Safety

As a leading manufacturer of construction equipment, we believe in superior performance, higher productivity & safety, faster execution and timely completion of projects,” says Mr. Jayesh Vadukiya Read More ...

Rehabilitation of National Highway at Tripura-Assam

The National Highway NH-44 is a major road artery for the North-East. The stretch of this highway leading to the border of Assam and Tripura (two states in the north-east of India), is the only land-link between Read More ...

Wirtgen Milling & Recycling Machines give Excellent result at NH-2

Wirtgen most compact and versatile machines W2000 and WR240 have been used for milling and cold in situ recycling works by contractor Soma during the road rehabiliation of Varansi-Aurangabad section Read More ...

KYB-Conmat's Advanced Mechanization Parallel Lower Ganga Canal Lining Project

Tougher norms for quality & safety in the industry have pushed contractors & developers towards advanced mechanization for their projects to deliver quality results in set timelines. It has also Read More ...

3D Design Software Helps Engineers Prove Their Clients’ New “Home” is Ready for Work

Transoft VLMK
Whether it’s moving across town or across the country, there are always boxes to pack and trucks to fill. But what if the core of your business IS trucks and you didn’t have a choice about moving? That’s exactly Read More ...

Comparative Study of Basalt And Carbon FRP Bonded Steel Beams and its Finite Element Modelling

Finite Element Modelling
The use of Fibre Reinforced Polymer (FRP) sheets to strengthen the steel structures has become an attractive option which may ensure confident retrofitting of existing steel structures. Conventional strengthening Read More ...
NBM&CW

New Building Material & Construction World

New Building Material & Construction World
MGS Architecture

Modern Green Structures & Architecture

Modern Green Structures & Architecture
L&ST

Lifting & Specialized Transport

Lifting & Specialized Transport
II&TW

Indian Infrastructure & Tenders Week

Indian Infrastructure & Tenders Week