Co-relationship of Seismic (EDR) & (PGA) for Cable Stayed Bridge

Cable Stayed Bridge

Prof A. K. Desai, Dr. J. A. Desai, M.Tech. Dr. H. S. Patil, Department of Applied Mechanics, S V N I T, Surat.

The evolution of the modern cable-stayed bridges took place almost exclusively in postwar Germany in the early fifties. Since then, it has become increasingly popular in many countries because of its remarkable structural efficiency as well as its aesthetically pleasing appearance. As opposed to the classical suspension bridge, the cable-stays are directly connected to the bridge deck resulting in a much stiffer structure. A large number of closely spaced cablestays support the bridge deck throughout its length, reducing the required depth and bending stiffness of the longitudinal girder to a minimum, thereby allowing the construction of relatively longer spans. The structural action is simple in concept: the cables carry the deck loads to the towers and from there to the foundation.

The primary forces in the structure are tension in the cable-stays and axial compression in the towers and deck; the effect of bending and shear is considered to be secondary. The early designs of modern cable-stayed bridges essentiality consisted of a stiff girder supported by a few cables. The stay- forces were rather large and consequently the anchorage design was excessively complex. Further development indicated that these problems could be eliminated by increasing the number of stays. The multi-cable arrangement has following advantages:
  • The deck can be erected using a cantilever erection sequence in conjunction with suspension by successive cable-stays.
  • The use of large number of small cables reduces the concentrated forces at the anchorage points in the tower and deck. Moreover, the deck bending moments between the suspension points are reduced.
  • A damaged or corroded cablestay can easily be replaced without over-stressing the bridge structure.
Cable Stayed Bridge
Excellent seismic stability is obtained as the damping of the system is increased by adding a large number of cables of different lengths with different natural frequencies. The seismic stability of the pylon is another important consideration. Very few researchers have worked on this as many of the cable-stayed bridges are in active seismic regions. When the slender deck of relatively flexible long span structure is subjected to seismic excitation, depending upon mass distribution of deck, cable and pylon tend to induce both torsional and flexural oscillations in the bridge deck. Another problem associated with earthquake is that two earthquakes have not similar finger print. All earthquakes have different peak ground acceleration, different duration and direction. Use of different shapes of pylon create different length, inclination and plane of the cables, this results into complex behavior during seismic excitation.

Many researchers (Table:1&2) have tried damper and isolation mechanism for absorbing seismic excitation, but still the problem of controlling deck oscillation during seismic excitation prevails for long span cable-stayed bridges. In additions to these, cable-stayed bridges exhibit a nonlinear structural response, principally because of geometric nonlinearity of stay-cables and combined bending moment and axial force effect in the deck and towers. These considerations require relatively sophisticated analysis procedures.

Looking to the increased popularity of cable-stayed bridges, it is obvious that there is a need for more comprehensive investigations of analysis and design of these contemporary bridges. The present general trends are two: one towards increasing center span length of cable-stayed bridge and second towards implementation of different aesthetical and functional shapes of pylons. Moreover, in view of the literature survey, the lack of research is found particularly in 3-D earthquake analysis of alternate bridge systems considering different shapes of pylon, under different duration, peak ground acceleration and pulse shape of seismic time histories.

For all three seismic time histories displacement centre of deck (Table:5,6,7) in y-direction (lateral) is maximum medium in zdirection (vertical) and very less in the case of x-direction (longitudinal). In self-anchored type bridge, intermediate side span supports are ineffective in controlling centre deck displacement during seismic excitation. These end supports reduce axial cable forces in inner and outer cable. They also reduce bending moment at base of the pylon.

Cable Stayed Bridge

It is observed that Bi-stayed Bridge gives less amount of cable forces (Fig:4,Table:8)in comparison to self- anchored type. It has also less amount bending moment at base of pylon. This reduction is in x- (longitudinal direction) and y- (lateral direction) for the condition of without ISSS. Outer cable forces are not under much influence of bi-stayed cable effect, for all seismic time histories.

Bhuj, Koyna and El-centro earthquakes (Fig:3, Table:4)are almost having similar magnitude (Range 6.5 to 7.7), but all three have different duration, different PGA value at different peak times. Even all three have different pulse shapes of acceleration vs time diagram. Bhuj time history has wide spread peak distribution between 40 to 47 sec, while Koyna short duration time history is having almost uniform wave form gives peak between 3 to 6 sec. El-centro medium duration time history is having impact type of pulse shape creates peak between 3 to 5 sec. In short, no two earthquakes are similar and very complex behaviour of spread pylon cablestayed bridge is noticed.(Fig: 6,7,8) Even peak value for B.M., S.F. and central deck displacement occur for all above three earthquakes at different time. It is narrated in the Table:9,10,11

It is observed that for spread angle μ = 300 pylon gives good seismic performance with compared to μ = 00 (Conventional Bridge). (Table:9,10,11) For long span bridge of 605 m pylon gives lowest value of maximum B.M. & maximum S.F at pylon base. For proper understanding of seismic behaviour of spread pylon cablestayed bridge, variety of time histories like short, medium & long duration having different PGA value & different earthquake magnitudes are essential. Spread angle of pylon μ = 300 gives normally reduction of deck oscillation with compared to μ = 00 (Conventional Bridge). Application of dampers between bottom of deck and top of deck beam of pylon reduce deck oscillation in all types of spread pylon cable stayed bridges (μ = 00, 190, 300). Improvement of dynamic behaviour of spread pylon cable-stayed bridge is observed with higher spread angle of wings of pylon. This is because of more stiffness of the structure due to less length and more verticality of cables.

EDR for various bridges

The Proposed “Earthquake- Displacement Ratio” (EDR) is defined as ratio of maximum seismic displacement to maximum static displacement. These both displacements must be at the same point. Earthquake-displacement ratio can be evaluated as seismic The mathematical formulation can be classified in to three parts:
  • Finite Element Formulation
  • Dynamic Analysis
  • Earthquake Analysis
Cable Stayed Bridge

damage indices.(Table:12) As indicated above, the ratio is considered for central point of deck (mid span) in vertical direction. EDR ratio for Bhuj, Koyna, El-Centro was in the range of 1.3 to 1.5, 0.3 to 0.7 & 4 to 4.64 respectively. As El-Centro P.G.A. is almost six times higher than that of Bhuj P.G.A., higher EDR observed for El-Centro is justified. “EDR ratio in lateral direction” for spread pylon cablestayed bridge is indicated in Table:12. During Earthquake, lateral oscillation plays important role for stability of bridge. EDR for El-Centro earthquake for spreadpylon cable stayed in all three inclinations of pylon (0°,19°,30°) are higher in comparison to Bhujand Koyna. The elasto-plastic damage of long span spread pylon cable-stayed bridge caused bystrong ground motions is associated with their own structural dynamic properties and the characteristics of earthquake records. The elasto-plastic seismic damage index called the “Earthquake Displacement Ratio (EDR)” proposed in this thesis, which is a local value of damage index, provides a measure of elasto-plastic seismic damage or ductility at the element level. It can be used in the evaluation of damage during elasto-plastic seismic response analysis. The EDR is particularly suitable when the Nonlinear Finite Element Method is used in elasto-plastic seismic analysis.

Cable Stayed Bridge

There is some relationship observed between E.D.R. value and P.G.A. of seismic input time histories. EDR value can be considered as quick damage assessment parameter. The relationship obtained can be used for finding displacement at centre point of deck for any unknown P.G.A.

Correlation between P.G.A. & E.D.R.

Cable Stayed Bridge
In fig. all points are plotted for different Peak Ground Acceleration (P.G.A) v/s E.D.R. values. Using curve fitting technique corelationship are established for different types of long span cable stayed bridge, considering vertical & lateral directions seismic oscillation. Below graphs (Figure 9,10,11,12) are useful for determining central deck oscillation of cable stayed bridge in different direction, for any unknown earthquake P.G.A.

Conclusion

For long span cable-stayed bridge, there is some relationship observed between P.G.A. and E.D.R. for vertical and lateral direction.

A.K. Desai’s Corelationships

  1. Spread pylon cable-stayed bridge (vertical direction). EDR = 1.180 loge (P.G.A.) – 4.196
  2. Spread pylon cable-stayed bridge (lateral direction). EDR = 542 loge (P.G.A.) – 1912
  3. Straight cable-stayed bridge (lateral direction). EDR = 467.4 loge (P.G.A.) – 1659
  4. Straight cable-stayed bridge (vertical direction). EDR = 1.048 loge (P.G.A.) – 3.669
Cable Stayed Bridge

    • Vertical excitation which is usually ignored in the seismic analysis of buildings, drastically affects the response of cablestayed bridge.
    • The first five modes are the major contributory mode. It is necessary to include at least five modes in an analysis in order to obtain the most fundamental movements. It might be sufficient to consider only these modes in a preliminary analysis.
    • For pylon and deck, additional responses from the higher modes could be significant. A total of twenty modes should be incorporated, if an accurate result is required.
    • For long span cable-stayed bridge, “Bi-stayed bridge with intermediate side span supports” option gives lowest pylon base bending moment for all three seismic time histories. The comparison is done among various options studied for long span cable stayed bridge.
    • Controlling of central deck deflection for long span cablestayed bridge is a key factor for seismic performance of cablestayed bridge. Spread pylon bridge with spread angle á = 30* and Bistayed bridge with intermediate side span support option gives lowest central deck deflection among various option studied for seismic loading.

Cable Stayed Bridge

  • Bi-stayed cable-stayed bridge has reduced cable forces and bending moment of pylon as compared to conventional straight cable-stayed bridge
  • The seismic isolation using damper in the cable-stayed bridge helps to reduce the acceleration response and the base shear response substantially in all types of cable- stayed bridges.
  • “Delay” is observed in peak occurrence time in all response quantities, for all different time histories. This “Delay” mainly depends upon bridge structural configuration i.e. shape of pylon, cable arrangement, deck arrangement.
Cable Stayed Bridge

References

    • Ali H. M., A. M. Abdel Ghaffar, “Modeling the Non-Linear Seismic Behaviour of Cable Stayed Bridges with Passive Control Bearings”, Compute & Structures, 1995, Vol-54, 461-492.
    • Brownjohn James M. W., Pin Qi Xia, “Dynamic Assessment of Curved Cable Stayed Bridge by Model Updating” , Journal of Structural Engineering , Feb 2000, 252-260.
Cable Stayed Bridge
  • Cai C. S.,P.E.,W.J.Wu and M. Araujo , “ Cable vibration Control with a TMD-MR Damper System :Experimental Exploration” . Journal of Structural Engineering, ASCE,Vol- 133,May2007,629-637.
  • Chang C. C., T. Y. P change, Q. W. Zhang, “Ambient Vibration of Long Span Cable Stayed Bridge”, Journal of Bridge Engineering, Feb’2001, Vol- 6, 46-53
  • Karbhari Vistasp M. ,Yael Van Den Einde ,Frieder Seible, “ Seismic Performance of a FRP Encased Concrete Bridge Pylon Connection “ Composites Part B: Engineering,Vol-38,Jan 2007,685-702.
  • Soneji B.B.and R.S. Jangid. “ Passive Hybrid Systems for Earthquake Protection of Cablestayedbridge “ Engineering Structures, Volume 29,issue 1 ,January 2007, 57-70.
  • Uwe Starossek, “Weight V/s cost : Light – weight materials in cable stayed bridges”, Journal ofStructural Engineering ,Nov 1998,Vol-124,1359-1362.
  • Wei Xin Ren Makoto Obata, “Elastic Plastic Seismic Behavior of Long Span Cable Stayed Bridges”, Journal of Bridge Engineering, Aug 1999, 194-203.

NBMCW March 2008

Click Here
To Know More / Contact The Manufacturer
Please provide your details we will contact you as soon as possible
Please let us know your name.
Invalid Input
Please let us know your Designation.
Invalid Input
Please let us know your City.
Please let us know your State.
Please let us know your Country.
Please let us know your Contact Number.
Please let us know your email address.
Please brief your query.

Dhola Sadiya - India's Longest River Bridge

The bridge lies in the state of Assam, but this location is usually referred to as upper Assam as it is far away from Guwahati and bordering China. The nearest airport is Dibrugarh. Then there is a drive of 65km into the Read More ...

Innovation in Bridges Components and Materials

The Infrastructure Industry is continuously evolving; new roads, elevated corridors, expressways, railways, dedicated corridors, metros, mono-rails are being constructed all the time. They also require constant Read More ...

World's Most Amazing Bridges

The 6.5 feet wide walkway in the Hongyagu Scenic Area in Hebei province hangs 755 feet above the ground, and is the world's longest bridge, which opened in 2017-end. Designed by Tel Aviv architect Haim Dotan Read More ...

An Experimental Study to Estimate Loss of Prestress and Determining Fundamental Natural Frequecny of Prestressed Concrete Bridge

Prestressed Concrete (PSC) structures especially bridges are being largely used all over the world due to their multifarious advantages in terms of structural behaviour, economy as well as aesthetical Read More ...

Experimental Investigations on the Structural Behaviour of a Distressed Bridge

Four Span Pipe Bridge
Distressed structures require necessary remedial measures in order to restore their original structural properties like strength and stiffness. Validating the effectiveness of the proposed qualitative remedial Read More ...

World’s Aesthetic Foot Bridges

Foot Bridges
Footbridges have a longer history than road or railway bridges. Ancient footbridges comprised of natural materials such as roots of trees, ropes, stones, masonry, and wood. Modern footbridges are built Read More ...

Load Testing of Second Thane Creek Bridge, Mumbai

Thane Creek Bridge
Load testing is done to determine the safe load carrying capacity of structures, determining if specific legal or overweight vehicles can safely cross the structure or needs to be restricted and the level of post Read More ...

Corrosion Preventive Methods Adopted for Concrete Bridges During Construction

Bridge in Central Kerala
Cement concrete is a versatile building material and is the second most consumed material in the world, after water. It is made using porland cement, coarse, and fine aggregates, water and one or more Read More ...

Recent Developments in Design and Construction of Concrete Road Bridges

Concrete Road Bridges
Planning, design and construction of bridges and flyovers is very challenging at places with space constraints. There has been rapid development with the availability of high strength steel and concrete Read More ...

Integral Abutment Bridges

Integral Abutment Bridges
The conventional bridges use expansion joints and bearings to accommodate the thermal movements of the bridge. However, they don't completely eliminate the distress caused because Read More ...

Restoration of 45 Years Old PSC Bridge by External Post Tensioning

Bridge Restoration
The use and advantages of Post Tensioning are very well known in the Civil Engg Industry as it has been in use for the last 40 to 50 years. Post tensioning is one of the best methods to induce stresses in the concrete Read More ...

Signature Bridge: A Landmark Engineering Marvel in the Making

Signature Bridge
Wazirabad Bridge or Signature Bridge Project is an initiative of Delhi Government, planned during the Commonwealth Games. It was conceptualized to be a landmark tourist icon that would also speed Read More ...

Analysis of Integral Abutment Bridge by Grillage Method

Integral Abutment Bridge
An integral bridge may be defined as having no expansion joints or sliding bearings, the deck is continuous across the length of the bridge. Integral bridges are alternatively referred to as integral abutment Read More ...

Soil Structure Interaction of Integral Bridge Using Finite Element Method

Soil Structure Interaction
A type of bridge that is used extensively in road applications in particular is the integral abutment bridge (IAB). The concept of "integral abutment bridge" has recently become a topic of remarkable Read More ...

Rehabilitation of Distressed Bridges

Cracks in Ravi Bridge
Before carrying out any testing of the concrete structures using NDT methods, visual inspection of the structure is a must. Visual inspection is not confined to the surface, it also include examination of bearings Read More ...

Strengthening of Mithi River Bridge at Mumbai Airport

Mithi River Bridge
Strengthening of RCC structural elements is a common task for maintenance nowadays. For the purpose of strengthening, several materials and methods are available such as sprayed concrete Read More ...
NBM&CW

New Building Material & Construction World

New Building Material & Construction World
MGS Architecture

Modern Green Structures & Architecture

Modern Green Structures & Architecture
L&ST

Lifting & Specialized Transport

Lifting & Specialized Transport
II&TW

Indian Infrastructure & Tenders Week

Indian Infrastructure & Tenders Week