Anil Kumar, Regional Manager, S.L .Goel, Deputy Project Manager, Milind Kulkarni, Repair & Rehabilitation Expert, and K.B. Tandon, Project Engineer, MWH India Pvt. Ltd., New Delhi

The repair and rehabilitation of civil structures of sewage treatment plants (20 & 40 MGD and 4 digesters of 12 MGD) at Keshopur in Delhi has been taken up with a basic view to ensure that by doing so it is possible to extend the life of the treatment plant infrastructure by at least 25 years. This coupled with a retrofit of the electrical, mechanical, instrumentation, piping and pumping works does help in making these plants operational once again at a much lower costs than would be required for construction of new plants of the same capacity.

There are a large number of such treatment plants in similar state in the country and which are not being used on account of being in a dilapidated condition. A proper survey, followed by estimation, specification and quantification of such works can be done. This further followed by tenders for repair and restoration work will pave the way for reutilization of such infrastructures and assist the cash strapped Municipal Corporations and Local Bodies to effectively utilize their resources in a better way and put in place treatment facilities at much lower and affordable costs.

Project Background

Yamuna Action Plan, Phase-II (YAPII) was formulated after the YAP-I phase to further address the problem of pollution of River Yamuna, particularly in the 22 km Delhi stretch and downstream up to Agra. The sewerage works proposed under YAP-II are in Delhi and Agra. The Delhi stretch of Yamuna is considered as the most polluted stretch, with Agra being the second most critical stretch.

The main objective of Yamuna Action Plan, Phase-II is further abatement of pollution of River Yamuna generally by way of increasing the capacity of sewerage system through rehabilitation of old sewers / pumping stations, construction of new sewers and increasing the sewage treatment capacity by rehabilitation of the existing sewage treatment plants and constructing a few new sewage treatment plants.

The cost of proposed YAP-II has been estimated at a sum of 6,370 million rupees, which shall be in the form of soft loan from the Japan International Cooperation Agency (JICA) to the Government of India.

National River Conservation Department (NRCD), Ministry of Environment & Forests, Govt. of India, the executing agency for the said loan, have allocated a portion of the proceeds of this loan to the project implementing agency that is Delhi Jal Board (DJB) for implementation of the said works in Delhi. DJB will utilise these funds for physical implementation of identified works which includes finalisation of planning, design and execution / rehabilitation of several trunk sewers and treatment plants.

This section of the article is only available for our subscribers. Please click here to subscribe to a subscription plan to view this part of the article.

Nippon Paint expands into Rs. 12,500 cr Construction Chemicals market
In line with its global vision, Nippon Paint India is expanding its portfolio beyond the paint and coatings product range; it will now offer products and solutions under the broad categories: Dry mix, Repair and Maintenance, Construction Chemicals, and

Read more ...

Alkali-Aggregate Reaction in Concrete Structures and Preventive Measures
When the alkali of cement reacts with the reactive constituents of aggregates, the reaction is deleterious though very slow, and the distress is exhibited when the volume inside the concrete is increased due to the formation of alkali-silica gel, causing the

Read more ...

Optimizing Existing Structures Through Retrofitting
Despite understanding the potential of retrofitting and its distinct and far-reaching advantages in making existing buildings green and sustainable, retrofitting continues to be undertaken on a very limited scale; hence, it needs to be promoted and made mandatory

Read more ...

Cause of Distress of an Old Building Through Analytical and Micro-Analytical Methods
The technical service life of a reinforced concrete building is the time in service when structural safety is unacceptable due to either material degradation or exceeding the load carrying capacity, or both. In which case, the repair strategy may be adopted

Read more ...

Value Engineering with MCI®-2019 for Concrete Maintenance and Repair
True value engineering saves money without reducing service life or affecting the quality of construction or materials. Ideally, it adds value to the project. MCI®-2019 is one such value engineering solution that can extend the service life of existing

Read more ...

Agrani Milestone Use Carbon Fiber Laminates to Strengthen Slab
Ramendra Bahadur Sinha, Managing Director, Agrani Milestone, explains the remedial measures and challenges faced during slab strengthening of a deflected slab at IIT. NBCC India Limited undertook the strengthening of a deflected slab at a G+2 storey IIT building

Read more ...

Waterproofing Challenges & Remedial Measures in High Rise Buildings
High-rise buildings need special attention when it comes to waterproofing as the challenges inherent in them are peculiar in nature. Unfortunately, there is a lack of knowledge on the remedies and products available in the market as water- proofers continue to

Read more ...

Importance of Waterproofing Structures
The longevity of structures depends on how much resistance the building element will offer to water ingress. Water leakage not only reduces the durability but also hampers the serviceability or usability of the structure; hence, a good waterproofing system will

Read more ...

Terrace Waterproofing Solutions for Energy-Efficient Buildings
Terrace waterproofing is particularly important and is considered a priority as the roof is always exposed to harsh climatic conditions and weather changes. Rajeev Gupta, Business Head, ECMAS Construction Chemicals Pvt. Ltd. An effective waterproofing solution

Read more ...

Structural Rehabilitation of Reinforced Concrete Structures
Cement concrete is one of the most important construction materials and is practically basic to present-day developments. It is strong enough mechanically, yet vulnerable to deterioration. It thus gets damaged and even fails. This deterioration may be due to the weathering

Read more ...

Thermax - HDPE-SBS Waterproofing System for Basement Waterproofing
Gradual shift in lifestyle has driven the idea of modern construction towards developing underground spaces and buried structures to bring efficiency in use of space. However, the improved efficiency comes with an increase in challenges like infiltration

Read more ...

Waterproofing in Hilly Areas with Sub-Zero Temperatures
Industry experts Kunjan Popat, General Secretary, Waterproofing Association of India; Ramendra Bahadur Sinha, Managing Director, Agrani Enterprises, and MS Sudish, Director, SIWIN Institute of Waterproofing and Insulation, share the challenges

Read more ...

Dow Sealants for Sustainable Infrastructure
Durability is a key requirement for modern infrastructure projects – highways and roads, bridges, airports and airfields, walkways and plazas, parking structures and stadiums. Miles of concrete must

Read more ...

FAIRMATE FAIRCURE WC - White Pigmented Concrete Curing Aid
Buildings have major environmental impacts over their entire life cycle. Resources such as ground cover, forests, water, and energy are depleted to give way to buildings. Today, India has demonstrated

Read more ...

Repair and Rehabilitation of A Minor Bridge in Shravasti District  (UP), India
Scour is a natural phenomenon caused by the erosive action of flowing stream on alluvial beds. Failure of bridge due to scour at their foundations, which in this case consisted of abutments and pier, one 1.2 dia

Read more ...

Faircoat Anti-Carbonation Coating Protects Concrete Structures Like Flyovers, Bridges & Buildings
To protect concrete structures like Flyovers, Bridges, Parking areas, Big Commercial and Residential Buildings, the normal decorative exterior paint will not serve the purpose as these paints are not vapour permeable

Read more ...

Repair Strategy of Stoplog Sill Beams During Operation Stage of 510 MW Teesta-V Power Station in Sikkim
Repair Strategy of Stoplog Sill Beams During Operation Stage of 510 MW Teesta-V Power Station in Sikkim Running Power Stations serve as a boom to the economy of the country and any generation loss due to construction

Read more ...

Concrete Protective Liner by Russian company Hydropolymer
Concrete protective liner is a multipurpose solution for waterproofing and protection of concrete surfaces against corrosion and destruction. The product warranties long-term and reliable protection of structures

Read more ...

Necessity of Health Monitoring of Structures Constructed Before 2000 across India
Sangeeta Pandey, Chief Manager (Civil), Power Grid Corporation of India Ltd., Patna, PVS Sudhakar, Sr. General Manager (Civil), NOFN Works, Power Grid Corporation of India Ltd., Vishakhapatnam & Dr. Achintya, Professor of Civil

Read more ...

WATERPROOFING Importance of Filling Cracks, Joints & Voids
Samir Surlaker, Director, Assess Build Chem Private Limited discusses some new joint treatments and injection systems in waterproofing. It is a myth that waterproofing treatments can be carried out by application of single material

Read more ...