Permanent Sealing for the Water Bearing Cracks or Moving Joints in Concrete Structures
The construction industry has come across situations when the concrete structure has developed cracks and water has seeped inside. Also there are situations when the same crack starts behaving as a moving / dynamic crack by relieving the internal stress in the structure. Some times the Construction joints / cold joints also start leaking due to the movement of the structure due to development of some stresses. Now it becomes challenging to stop the leakage, as the waterproofing system employed has to resist not only the water pressure from the negative side (Exit side of water) but also the flexibility required for absorbing the stresses due to the dynamic nature of the crack / joint.

Koster KB-PUR® Injection System is a unique method introduced from Chowgule Koster (India) Construction Chemicals Pvt.Ltd.

The system is initiated with the injection of the KB PUR® IN I a two component water activated PU-Injection Foam into the crack, which stops the ingress of water and immediately thereafter is followed by injecting the KBPUR® IN II which is a flexible 2 Component polyurethane – Injection Resin which not only seals off the water but also remains permanently flexible.

The KB-PUR® IN I is water activated hydrophobic MDI based polyurethane foam. The system only reacts when it comes in contact with water, expands and converts into stiff closed cell, waterproof polyurethane foam. KB-PUR® IN I is free of solvents and fillers; it is resistant to hydrolysis and is suitable for use in drinking water areas (KTW-Test). KB-PUR® IN I consists of a resin and a special catalyst, supplied separately, to allow on-site adjustments of gel.

Permanent Sealing for the Water Bearing Cracks or Moving Joints in Concrete Structures
The KB-PUR® IN II is a solvent and filler free, low viscosity, 2 component, elastic polyurethane injection resin for sealing of dynamic / moving cracks. The KBPUR® IN II is permanently elastic and is designed to withstand continuous contraction and expansion. With flexible resin, the crack is converted into an equivalent of an expansion joint and movement can thus continue without leakage or damage to the structure.

Application Procedure

Mark and drill the holes on either side of the Crack / Joints in staggering manner and at a distance of 30 cm c/c on each side and at 45 degree angle, clean the hole and fix the packers and tighten it.

For dry joints KB-PUR® IN IIPU resin can directly be injected. But if the water is oozing out, then KB-PUR® IN I is injected first to stop the water by foaming.

Add the KB-PUR® IN I component A and B and mix thoroughly with a slow speed mixer until a homogeneous mixture is obtained (avoid mixing humid air into the resin). Inject the material with conventional single component pumps at high or low pressure.Always start at the bottom and continue upwards, if in doubt, go back and inject the same packer once again.

As soon as the KB-PUR® IN I comes in contact with water, it reacts and forms foam having 30 times volume expansion. Water will be replaced by the rigid closed cell foam and can no longer pass through the crack.

Mix both the component of KB-PUR® IN II and inject through another pump into the same port injected with KB-PUR® IN I. KB-PUR® IN II will replace the Foam and occupy the entire depth of the crack.

Case Study

Permanent Sealing for the Water Bearing Cracks or Moving Joints in Concrete Structures
In a classic example of Box Push Tunnel Sub - Way constructed at Virar Railway station below the busiest Western Railways, the Butt joint between the pre - cast tunnels started leaking and the problem Was aggravated due to the vibrations from the traffic. The joints were treated Vertically, Horizontally and Overhead by Koster KB-Pur® Injection System.

The joints were treated under water pressure with the KB-PUR® IN I - foam forming material and then with KB-PUR® IN II- flexible PU Resin.

Similar treatment was also adopted for the Moving Joints of large basements, settling joints of Thickener at steel plants, Cooling Towers of Power Plant etc.
Click Here
To Know More or to Contact the Manufacturer
Please let us know your name.
Invalid Input
Please let us know your Designation.
Please let us know your Contact Number.
Please let us know your email address.
Please brief your query.
Our other Value-Added Services:

To receive updates through e-mail on Products, New Technologies & Equipment, please select the Product Category(s) you are interested in and click 'Submit'. This will help you save time plus you will get the best price quotations from many manufacturers, which you can then evaluate and negotiate.

Invalid Input
Invalid Input
Invalid Input
Durability is a key requirement for modern infrastructure projects – highways and roads, bridges, airports and airfields, walkways and plazas, parking structures and stadiums. Miles of concrete must

Read more ...

Buildings have major environmental impacts over their entire life cycle. Resources such as ground cover, forests, water, and energy are depleted to give way to buildings. Today, India has demonstrated

Read more ...

Scour is a natural phenomenon caused by the erosive action of flowing stream on alluvial beds. Failure of bridge due to scour at their foundations, which in this case consisted of abutments and pier, one 1.2 dia

Read more ...

To protect concrete structures like Flyovers, Bridges, Parking areas, Big Commercial and Residential Buildings, the normal decorative exterior paint will not serve the purpose as these paints are not vapour permeable

Read more ...

Repair Strategy of Stoplog Sill Beams During Operation Stage of 510 MW Teesta-V Power Station in Sikkim Running Power Stations serve as a boom to the economy of the country and any generation loss due to construction

Read more ...

Concrete protective liner is a multipurpose solution for waterproofing and protection of concrete surfaces against corrosion and destruction. The product warranties long-term and reliable protection of structures

Read more ...

Sangeeta Pandey, Chief Manager (Civil), Power Grid Corporation of India Ltd., Patna, PVS Sudhakar, Sr. General Manager (Civil), NOFN Works, Power Grid Corporation of India Ltd., Vishakhapatnam & Dr. Achintya, Professor of Civil

Read more ...

Samir Surlaker, Director, Assess Build Chem Private Limited discusses some new joint treatments and injection systems in waterproofing. It is a myth that waterproofing treatments can be carried out by application of single material

Read more ...

Years of research plus decades of practical experience have enabled FAIRMATE to develop detailed solutions to restore and rehabilitate concrete structures with structural rehabilitation, retrofitting and strengthening of RCC structures

Read more ...

Sunny Surlaker, Head Technical Services, Assess Build Chem writes on the selection ideologies, materials and methods for defect remediation in Concrete Buildings. The building façade or the envelope is the primary line of

Read more ...

This article provides some basic information on effects of fire on concrete, various condition evaluation methods, and show findings from a case study of a fire exposed concrete foundation in California, and informs construction

Read more ...

There is considerable controversy within the concrete repair industry regarding the use of bonding agents as a pretreatment method for the repair of deteriorated concrete. This paper examines the use of bonding agents

Read more ...

This paper discusses the effects of fire on concrete and provides a methodology to assess, evaluate and repair concrete structures. Though concrete is among the best fire-resistant building materials, it does get damaged when

Read more ...

The ACI 562 Code Requirements for Assessment, Repair, and Rehabilitation of Concrete Structures and Commentary was first published in 2013 and revised in 2016. Development of ACI 562 was an industry response to variations

Read more ...

The repair industry in India and for that matter, throughout the world, is like the story of an elephant described by seven blind people. Whichever part of an elephant will come in the hands of a blind man, the elephant will be described

Read more ...

The Chamera Hydro-Electric Project (Stage-III) is located on the river Ravi at village Kharamukh (250.0 m downstream of the confluence of river Ravi and Tundah Nala) in Chamba district of Himachal Pradesh. The Project consists

Read more ...

Terex — a diversified global manufacturer of equipment for mining and quarrying industries — is celebrating 10 years of operations in India and has announced expansion plans for its 45-acre manufacturing plant in Hosur, with which it plans

Read more ...

The rapid boom in the construction industry, has tremendously given rise to the demand for sand, causing deficiency of suitable river sand in many parts of India. Besides, river mining causes imbalance in the river bed water flow, and

Read more ...

Regardless of the quality of pavement material and design, increase in vehicular traffic and changing environmental conditions will reduce the service life of pavements and ultimately result in their failure. The causes and

Read more ...

With the increase in construction of buildings in the last two decades, it has been observed that many of the structures are already showing signs of distress. In some cases, repair measures become necessary even within a span

Read more ...

×
Sign-up for Free Subscription
'India Construction Week'
Weekly e-Newsletter on Construction Industry
Get the latest news, product launches, projects announced / awarded, government policies, investments, and expert views.