The project includes construction of new dome shaped godowns inside cargo jetty area with project cost of ₹69.51 crore with extended working height, resulting in more cargo handling, further suitable for unloading the bulk cargo through hydraulic system by trucks/transport vehicles of fifth generation. The upgradation of roads and allied infrastructure including storm water drains in 66-hectare area inside cargo jetty area costing ₹80 crore.
The projects also include the upgradation of existing Tuna Road from two-lane to four-lane with estimated cost of ₹87.32 crore to ensure quicker cargo evacuation and aims at increased traffic handling at port and accommodate future port traffic seamlessly.