RVNL wins Rs 1,134-cr Chennai Metro Rail’s contract
Chennai Metro Rail has recently signed a contract with Rail Vikas Nigam Limited for the construction of a 10km log elevated line over the OMR IT corridor starting from Sholinganallur to Siruseri Sipcot with nine stations involving an investment of Rs 1,134 crore, stated CMRL.
The contract is part of the Asian Development Bank (ADB) funding for phase-2 part of the project. The scope of work in the contract includes the construction of an elevated viaduct with the assigned length and nine elevated metro stations at Sholinganallur Lake-1, Sri Ponniamman Temple (Sholinganallur Lake-2), Sathyabama University (Semmenchery-1), Semmenchery-2, Gandhi Nagar, Navalur, Siruseri, Siruseri Sipcot-1 and Siruseri Sipcot-2 as well as stabling viaduct at Sipcot.
The contract is part of the Asian Development Bank (ADB) funding for phase-2 part of the project. The scope of work in the contract includes the construction of an elevated viaduct with the assigned length and nine elevated metro stations at Sholinganallur Lake-1, Sri Ponniamman Temple (Sholinganallur Lake-2), Sathyabama University (Semmenchery-1), Semmenchery-2, Gandhi Nagar, Navalur, Siruseri, Siruseri Sipcot-1 and Siruseri Sipcot-2 as well as stabling viaduct at Sipcot.