
Being a part of the 40.35 km Surat Metro Phase 1 project in west Surat, it will connect Bhesan – Adajan – Majura Gate via 11 elevated stations and form an interchange with Line-1 at Majura Gate in the centre of the city.
The scope of work includes the construction of a 10.559 Km Elevated Viaduct and 11 nos. stations (Excl. E&M, Architectural Finishing and Roofing) from Bheshan dead end to Majura Gate Station including Viaduct Ramp to Depot Entry near Bheshan for Surat Metro Rail Project Phase – 1, Corridor-2 (Package 1). The 11 elevated stations will be built at Bhesan, Botanical Garden, Ugat Vaarigruh, Palanpur Road, LP Savani School, Performing Art Centre, Adajan Gam, Aquarium, Badri Narayan Temple and Athwa Chopati.