
PMC Project Head, Srinivas Bonala informed that the length of extension of Vanaz to Chandni Chowk is 1.12 km and ₹343.07 crore cost. The total length of the Ramwadi to Wagholi corridor is 11.63 km and the total cost is ₹3,014 crore. The Vanaz to Chandni chowk corridor will have an additional metro station and Ramwadi to Wagholi will have 11 additional metro stations.