
The project entails design and construction of civil and building works including testing and commissioning on design-build lump sum price basis for double line high-speed railway involving Ahmedabad Station, Sabarmati Station, Viaduct & Bridges, Crossing Bridges (excluding fabrication and transportation of steel truss girders) and associated works.
Package C-7 from chainage 489.467 to 507.600 is the third-longest package within Gujarat and lies entirely within the Ahmedabad metropolitan region with 2 elevated stations at Ahmedabad and Sabarmati.