Caterpillar has announced the addition of two Next Gen products into its portfolio of integrated solutions - Cat® 303 CR Mini Excavator and Cat 120 GC Motor Grader which will help deepen the company’s presence in the infrastructure, mining, and energy sectors in India.

The new Cat 303 Mini Hex and Cat 120 GC Motor Grader were displayed alongside some of Caterpillar’s existing range of products including excavators, motor graders, wheel loaders, backhoe loaders and skid steer loaders.

“The Cat 303 Mini Hex launched at EXCON is designed to perform in any challenging condition and terrain where our customers are focused on getting the job done profitably, efficiently and safely,” said Amit Bansal, director of sales in Caterpillar’s Building Construction Products Division. “Caterpillar has an integrated portfolio of machines, services and technologies that support end-to-end sustainable solutions for our customers.”

Cat 303 CR mini excavator

Highlights of Cat 303 CR mini excavator:
  • Cat 303 CR Mini Excavator fitted with Cat C1.1 turbo engine developing gross power of upto18.4 KW @ 2400 rpm.
  • Meets EU Stage V emission standards, offers ‘stick steer & cruise control travel’ mode.
  • Next Generation LCD monitor controls that provide easy to read machine information.
  • Comes with standard features such as Product Link™ systems that track and transmit crucial operating data via VisionLink® to help improve fleet management.
  • Equipped with Roll Over Protection Structure (ROPS) & Tip Over Protection Structure (TOPS) certified canopy as per ISO standards along with other safety features.
“The newly launched Cat 120 GC Motor Grader and the range of integrated customer solutions on display at the exhibition are built with foresight and technology to help our customers find the optimum solution for high productivity. They aim to extend beyond customers’ expectations and demands,” said Mukul Dixit, director of sales and marketing in Caterpillar’s Global Construction and Infrastructure Division.

Cat 303 CR mini excavator

Highlights of Cat 120 GC motor grader:
  • The new Cat 120 GC Motor Grader is configured with some of the industry-defining features combined with reliable performance and cost-efficient owning and operating.
  • Works on low cost-per-hour operation mechanism to enhance fuel savings with standard features such as ECO mode.
  • Easy machine servicing with grouped filter locations, extended maintenance cycles, cab comfort options, and simple-to-operate, quick and accurate hydraulic controls.
  • Increased productivity, improved fuel efficiency and increased dependability. Designed with customer preferences in mind while providing customization of the machine for specific uses.
Caterpillar also announced, ‘Aftermarket Performance Customer Value Agreements’ (CVAs), to support hassle-free service to customers at any point in the machine lifecycle to help maximize machine performance and utilization. This CVA includes dealer technician support using genuine Cat parts for certain planned maintenance and fluid health management to help identify issues before they cause unexpected downtime. Customers will also have access to helpful machine data and insights which are just one click away – available 24/7 from customers’ mobile phone. Customers can contact their dealer to know more about CVAs and other offers.
MMRC to build Rs 8,739-cr Wadala- CSMT metro line 11
The Mumbai Metro Rail Corporation (MMRC) has been tasked with the construction of Metro Line 11 between Wadala and Chhatrapati Shivaji Maharaj Terminus (CSMT) at an investment of Rs 8,739 crore. An order to this effect has been issued by the Urban Development

Read more ...

NHAI expedites Rs 32,000-cr Gorakhpur-Siliguri e-way project
National Highways Authority of India has fast tracked the 520 km long four-lane Gorakhpur-Siliguri Expressway. Starting from UP, the expressway will go to West Bengal after crisscrossing nine districts of Bihar. It will pass through three districts of

Read more ...

MMRDA starts work on Rs 8,416-cr Bridge on Kasheli Creek
MMRDA has started construction work on the final segment of the bridge on the Kasheli Creek, which is a part of the Thane-Bhiwandi-Kalyan line, at an investment of Rs 8,416 crore. The height of the bridge is 15 metres above water levels and comprises

Read more ...

Govt prioritizes 18 road projects under Gati Shakti
In the fiscal year 2023-24, the government in line with Prime Minister Gati Shakti-National Master Plan, has prioritized and fast-tracked as many as 18 critical road infrastructure projects to be completed in the next two years. The Centre is eyeing 67 critical

Read more ...

HAML finalizes alignment for Rs 6,250-cr metro airport line
In order to start construction work on the airport metro line, Managing Director, HAML, N.V.S. Reddy, has finalized alignment by inspecting the entire 10 km stretch for the airport metro line involving an investment of Rs 6,250 crore. He also examined options

Read more ...

CMRL fast tracks Rs 61,843-cr Phase-II metro corridor
Chennai Metro Rail has fast tracked the ground work to start construction of the Phase 2 part of the project with the local agencies acquiring 82% of the required land for the mega metro project worth Rs 61,843 crore. CMRL is keen to commission the Poonamallee

Read more ...

Raheja Group in JV to build 3-acre project in Mumbai
Real estate builder K Raheja’s development arm K Raheja Corp Homes has entered into an agreement to develop a 1-million-sq-ft luxury housing project over an area of over 3- acre prime land parcel at Mahalaxmi locality in South Mumbai. The project will be

Read more ...

BMRCL to extend Green Line Metro to BIEC
Mass transport connectivity on Nelamangala and Mysuru roads is set to get a big boost with the BMRCL's decision to extend the stretch between Manjunath Nagar to Madavara (BIEC). Once work on this line is completed, the green line metro network will be expanded

Read more ...

Plans afoot to build new Mumbai-Goa Expressway
The road connectivity between Mumbai and Goa is likely to get a further boost as an 'express' upgrade with the state government in Maharashtra announcing a new access-controlled high-speed expressway between Mumbai and Goa, similar to the Mumbai-Pune expressway

Read more ...

NHAI invites bids for Rs 844.23-cr RR road in Kanpur
NHAI has invited bids for the development of a six-lane greenfield Ring Road (Package-III) around Kanpur in Uttar Pradesh on an engineering, procurement and construction model. The project in question commands scope of work of the construction of a six-lane

Read more ...

Nitin Gadkari inaugurates bauma CONEXPO 2023
Union Road, Transport and Highways Minister Shri Nitin Gadkari on Tuesday inaugurated baumaCONEXPO 2023 at India Expo Mart, Greater Noida highlighting the importance of construction equipment industry for the growth of the

Read more ...

NHAI starts tunneling work on 464-km NH in Chhattisgarh
The National Highway Authority of India has begun building a 2.79 km tunnel in Kondagaon, Chhattisgarh, under the Bharatmala Project. The tunnel, the largest in Chhattisgarh, will connect Raipur to Visakhapatnam and reduce travel time from 13 hours

Read more ...

DLF to launch 1,100 residential units in Gurgaon
Real estate giant DLF is starting construction on a luxury housing project in Gurugram with an estimated revenue potential of Rs 7,500 crore. The company plans to develop 1,100 apartments in the residential project located in Sector 63. The demand for real

Read more ...

BRO plans new bridge across Indus connecting east Ladakh
The Border Road Organization is building a new concrete bridge at Loma across the Indus River to facilitate the movement of heavy military equipment to eastern Ladakh. The road from Chushul to the Loma Bridge is currently unpaved and outdated, but with

Read more ...

CICEE 2023 Spring Symposium held in Beijing
The Organizing Committee of the Changsha International Construction Equipment Exhibition (CICEE) held a Spring Symposium in Beijing. Representatives and experts from various national business associations, such as the China Construction Industry Association

Read more ...

King Willem-Alexander Opens New ELEO Battery Facility
His Majesty King Willem-Alexander of the Netherlands officially opened ELEO's new battery facility with a ceremonial unveiling using an electric excavator. The event, which took place at the Automotive Campus in Helmond, Netherlands, was attended

Read more ...

Kohler celebrates 150 years of bold moves, creativity & impact
Kohler Co., a company founded in 1873, is known for its innovative products for kitchen and bath spaces, energy-efficient solutions, luxury hospitality experiences, and championship golf. The company's teams of creative designers are the driving force

Read more ...

BRO to build 135-km Chushul –Demchok highway along LAC
The Border Roads Organisation (BRO) has recently invited bids for the construction of the 135 km long Chushul-Dungti-Fukche-Demchok highway, also known as the CDFD road along the Line of Actual Control (LAC) starting from Chushul to Demchok matching to

Read more ...

NHAI floats tender for ₹952-cr Ambala RR project
The National Highways Authority of India (NHAI) has floated a tender for the construction of a 22.5-km long stretch, which is a part of the Phase-II of the Ambala ring road project aimed at decongesting the traffic scenario in and around Ambala city

Read more ...

Railway unveils elevated inter-city semi-high-speed trains
Indian Railways is planning to construct intercity elevated semi-high-speed tracks for passenger trains on popular routes such as Delhi-Jaipur, Mumbai-Pune, Bangalore-Chennai, and Delhi-Amritsar via Chandigarh. The project, which is expected to cost

Read more ...

×
Sign-up for Free Subscription
'India Construction Week'
Weekly e-Newsletter on Construction Industry
Get the latest news, product launches, projects announced / awarded, government policies, investments, and expert views.
Click here to subscribe.
×