L&T wins tunnelling contract from RVNL in Uttarakhand
The construction arm of L&T has secured a contract for heavy civil infrastructure business from Rail Vikas Nigam Limited (RVNL) for Package 4 of the New Broad-Gauge Line between Rishikesh and Karanprayag in Uttarakhand. The scope of work includes the construction of tunnels, formation, construction shaft, and other ancillary works from Chainage 47+360 to 63+117 km. The project also involves the construction of 14.577 km up line and 13.123 km down line tunnel with embankments of about 800 meters at both ends. Out of 14.577 km and 13.123 km of tunnel, 10.49 km and 10.317 km of tunnel will be excavated using two new hard rock Tunnel Boring Machines (TBMs) of diameter 9.1 meters and the balance using New Austrian Tunnel Method (NATM). The work includes the construction of an Ellipsoidal-cum-Ventilation Shaft in the finished cross-section of 79 square meters and a depth of 32 meters. This will be the biggest TBM to be deployed in the Himalayan region in India and the TBM bored tunnel length of 20.807 km will be the longest for any project in the Himalayan belt. The entire project is to be completed within a period of 60 months. The rail line will not only facilitate easy access to Uttarakhand's pilgrimage sites, but also enable the development of backward areas, connect new trade centres, and serve the resident population. Director & Senior Executive VP (Civil Infrastructure), S. V. Desai, informed that the company is already constructing Package 2 of this project involving 24 km of tunnel with the NATM, minor bridges and formation works.
Realty developer Migsun Group will invest ₹500 crore in a residential and commercial project in Lucknow. MD of Migsun Group, Yash Miglani, informed that the project is located next to Medanta Hospital and will
Read More ...
UP earmarks ₹2,501-cr for metro rail network
UP government has allocated ₹2,501 crore for building a world class metro rail network across cities in the state. There is a provision of ₹597 crore for the Kanpur metro rail project in the budget presented by state's Finance
Read More ...
ECR unveils ₹173-cr Gaya railway station upgrades
GM, ECR, L C Trivedi, informed that the East Central Railway (ECR) has worked out a plan to redevelop Gaya Junction as a world-class station. RLDA has been assigned the task to redevelop Gaya station. Chief public relations officer
Read More ...
MoRTH clears ₹16,000-cr RRR project in Hyderabad
The road transport and highways ministry has given its in-principle approval for the 340 km long four-lane access-controlled highway, Regional Ring Road (RRR), around Hyderabad city connecting almost 20 developing towns
Read More ...
Centre approves 2 road projects in AP
The construction work on the 465-km long NH-130-CD, which is a part of Visakhapatnam - Raipur Economic Corridor, is all set to gain pace with the MoRTH approving two six-lane packages of the highway costing ₹1,500 crore
Read More ...
Kerala Govt nods for ₹7,446-cr Light Metro Rail Project
Kerala Government has given administrative sanction for the Light Metro project for Thiruvananthapuram and Kozhikode costing ₹7,446 crore. Kerala Rapid Transit Limited (KRTL), the special purpose vehicle set up to execute
Read More ...
GWMC takes up ₹1,100-cr Metro Neo venture
Greater Warangal Municipal Corporation (GWMC) has initiated the construction process of the Metro Neo project at Warangal city for ₹1,100 crore in Telangana. The detailed project report (DPR) for the 17-km long project
Read More ...
NCRTC launches construction of bridge on Yamuna River
The National Capital Region Transport Corporation (NCRTC) has started the construction work on a 1.35-km-long bridge project on Yamuna. It will be the 17th such bridge to come up on the river. It is a part of the 82-km-long
Read More ...
MahaMetro expedites Phase-II of Nagpur metro
MahaMetro is all set to start work on Nagpur Metro phase II in the next couple of months. Allocation for phase II has been made in the Union Budget for 2021-22. Union ministry of housing and urban affairs
Read More ...
PWD hands over ₹628-cr road construction to KRFB
The Kerala Road Fund Board (KRFB) has taken over the road project from PWD to develop the Thammanam-Pullepady road stretch as a four-lane road and to extend the same to M.G. Road and the NH Bypass
Read More ...
UP allocates ₹76,489-cr to Ganga Expressway
Uttar Pradesh Government has allocated ₹76,489 crore for the construction of the country's longest Ganga Expressway. Out of the total allocated amount, ₹489 crore has been provided for carrying out construction work
Read More ...
MPowered launches 'MWire' to empower women in Real Estate Industry
Gurugram-based Asset Management Firm MPowered announces the launch of its latest vertical called, 'MWire'. The term 'WIRE' stands for Women in Real Estate and has been launched with a vision to welcome more women
Read More ...
Berger Paints & Dhunseri plans ₹500-cr expansion
Berger Paints and Kolkata-based Dhunseri Group are contemplating to invest ₹500 crore at Panagarh Industrial Park near the industrial township of Durgapur in West Bengal. The paints major is planning to invest around
Read More ...
Ikea opening its shopping centre in Noida
The Sweden-based furniture manufacturing major, Ikea, is all set to open its shopping centre in India as the company took over a land parcel stretching across 50,000 sq metres in Noida's Sector 51. This project will build
Read More ...
Central Park realty plans ₹500-cr projects
Luxury real estate building major Central Park has decided to invest ₹500 crore in the development of multiple school buildings within its housing societies. The company has planned two schools at Central Park Resorts
Read More ...
NHAI plans Periodic Quality Audit and Independent Inspection of NH Projects
NHAI has planned to launch a drive for Independent Inspection of its ongoing National Highways projects across India, by involving reputed retired government officials. It is a major step towards construction of world class highways
Read More ...