CASE India: Becomes a full liner with launch of CX220C Excavator

launch of CX220C Excavator
CASE Construction Equipment, a brand of CNH Industrial, has unveiled the long-awaited Crawler Excavator CX220C to its product portfolio at the 10th edition of the International Construction Equipment and Construction Technology Trade Fair - CII EXCON 2019. This globally renowned excavator will now be manufactured at the brand’s plant in Pithampur and available in the Indian market from April 2020 onwards.

The CASE CX220C is specially designed for tough applications. The machine is equipped with a powerful and reliable FPT Industrial engine to ensure high productivity with low fuel consumption and is highly suitable for stone quarry, road works, general construction and earthwork. With the launch of this new product, the brand has become a full liner in India, further strengthening its leading position in the country’s construction industry. In addition to excavators, CASE India is also displaying its complete line-up of vibratory compactors, backhoe loaders, crawler dozers, motor graders and skid steer loaders. This wide range of equipment illustrates the brand’s ability to cater to activities as diverse as urban construction, road building, infrastructure, mining and agriculture.

Commenting on the occasion, Mr. Raunak Varma, Country Manager, CNH Industrial India said,” CASE India embarks on a new journey with the launch of a locally-manufactured excavator. India is one of the biggest construction equipment markets and one of the fastest growing economies in the world. It is a key part of our growth strategy. The Indian portfolio is now at par with our global portfolio and we are glad to extend the same global services in India. Today with the launch of our new product; we have upped the ante in our offerings to the Indian market. We are expanding every year in terms of portfolio, manufacturing capabilities and our customer touchpoints so as to keep the momentum going.”

Speaking at the launch, Mr. Puneet Vidyarthi, Brand Leader, CASE India said, “At CASE India, we have always endeavored to provide innovative machines and the new CX220C Excavator is another step in this direction. With our range of compactors, graders, backhoe loaders and dozers, we already have a strong position in the construction segment and the new excavator will help in consolidating CASE India’s position in the crawler excavator segment.”

He further added, “Our excavator is customized to India’s specific requirements and comes with CASE’s promise of strong performance and efficient technology. The launch of this new product is an example of how CASE stays ahead by constantly innovating and upgrading its portfolio to meet customers’ needs.”

To fulfill business queries on site at EXCON, CASE’s commercial, product support and its financial services business CNHi Capital will be available to demonstrate and provide information on the brand’s portfolio of business solutions, financing packages, extended warranties, maintenance programme, total cost of ownership and after sales service.

The CX220C Excavator has an operating weight of 22 tons and is equipped with a FPT 6-cylinder fuel-efficient electronically controlled engine. It develops a gross power of 117 KW (157 hp) and peak torque of 622 Nm at 1800rpm. The new generation FPT engine is developed by CASE sister brand FPT Industrial. Additionally, the excavator comes with five energy saving controls & ECO.

The gauge function enables the continuous monitoring of the fuel consumption that helps save fuel cost. Robust design, Heavy duty Arm, Boom & Undercarriage structures improves durability; which also contributes to lower cost of ownership. CASE India’s excavator also comes with an easy maintenance from ground level for user comfort.

The CX220C Excavator is a perfect machine for every application, it comes with three available power modes and 10 auxiliary hydraulic settings. It offers an arm length of 1.9 m, 2.4 m and 2.9 m & 5.4 m boom length to cater to customer needs. Its 152kN Bucket & 132kN arm digging force ensures higher productivity. Its 6.59 m dumping height ensures safe loading in a high body dumper. The CX220C Excavator comes with a maximum travel speed of 5.6 km/hr and a swing speed of 11.5 rpm. The range of bucket sizes available are (0.9, 1.0, 1.1 cu.m) as per material density, application and customer requirements.

The CX220C Excavator is equipped with CASE India’s renowned Telematics system which provides real time updates. The spacious HVAC Cabin comes with an Auto Climate Control function feature and a radio. The cabin has an integrated 7-inch LCD Monitor for real time parameter monitoring. An on board diagnosing system is added to the machine that gives a full measure or status of the machine with notifications on issues or need for repair.

JCB Group appoints Deepak Shetty as Dy. CEO & MD in India

The JCB Group has announced the appointment of Deepak Shetty as Deputy CEO and MD of JCB India. He has been with JCB for over 10 years in various leadership roles. He takes over the new assignment after having been Read More ...

Railway floats tender for ₹142-cr bridge in UP

To ensure smooth flow of train traffic on the Jhansi-Manikpur section in UP, North Central Railway has floated tender for the construction of two bridges on this stretch. The scope of work involves the construction of Read More ...

Embassy Parks fixes ₹1,500-cr realty space on radar

Embassy Office Parks REIT has decided to invest ₹1,500 crore over a period of time to add 2.6 million square feet of commercial space into its portfolio of 26 million square feet of operational office space. This additional Read More ...

India plans 13th Japanese industrial townships in Assam

To promote domestic manufacturing and strengthening economic ties between the two countries, India has decided to set up the 13th Japanese industrial township in Assam. Secretary in the Department for Promotion of Industry Read More ...

LiuGong India Appoints New President & Sr. Vice President

LiuGong India announced the appointment of A Krishnakumar as the new President – India effective July 2020 and Alok Jha as new Sr. Vice President – Sales & Marketing effective August 2020. A Krishnakumar brings with Read More ...

BMRCL launches ₹30,695-cr Phase-II of metro rail venture

The Bangalore Metro Rail Corporation has launched the tunnelling work on the Phase-II of the metro project involving an investment of ₹30,695 crore and the CM has set in motion the work by one Tunnel Boring Machine (TBM.) Read More ...

Dilip Buildcon bags ₹1,140-cr highway contract

Dilip Buildcon has bagged a road and highway project worth ₹1,140.50 crore in Telangana. The company has been declared as L-1 bidder in the tender floated by the National Highways Authority of India. The project, having Read More ...

NHAI invites bids for road linking Gurgaon-Mumbai expressway

To accelerate the construction work for the extension of Gurgaon-Mumbai expressway to DND Flyway in Delhi, NHAI has bid out first two packages from DND to Ballabhgarh where the work is scheduled to complete by mid-2023. NHAI Read More ...

Decks cleared for Metro Line 4 in Mumbai

Decks have been cleared to start the construction work on the Metro Line-4. The Bombay high court (HC) has allowed Mumbai Metropolitan Region Development Authority (MMRDA) to cut 357 mangroves for the construction Read More ...

KEC International wins ₹1,192-cr multiple contracts

MD and CEO Vimal Kejriwal informed that the RPG firm KEC International has won contracts worth ₹1,192 crore across its business segments in the domestic and international arena. The engineering firm has secured ₹821 Read More ...

NHAI steers ₹4,000-cr Chandigarh-Ludhiana NH project

NHAI has cleared a ₹4,000 crore project that includes faster connectivity to Chandigarh from Ludhiana. Ministry of Road Transport and Highways informed that this will be part of the upcoming Delhi-Amritsar-Katra Expressway Read More ...

MoRTH speeds up 401-km four-lane new NH project

The National Highway Authority of India has fast-tracked the project of building 401-km long four-lane highway project crisscrossing Andhra Pradesh and Chhattisgarh. The new road covering 90 km of length in Vizianagaram district Read More ...

AP unveils ₹16,000-cr metro corridor along coastline

The state government in Andhra Pradesh is contemplating to launch a metro rail on the Visakhapatnam coast at an investment of ₹16,000 crore. The DPRs for light metro rail and modern tram corridors is being prepared by the Read More ...

KMDA kick-start ₹600-cr flyover at Ruby crossing

Kolkata Metropolitan Development Authority (KMDA) has hastened the construction work of the 12m high flyover on an elevated corridor at Ruby crossing at an investment of ₹600 crore. The design for the six-lane Ruby flyover Read More ...

Mysuru-Chennai high-speed rail on the anvil

The railway has fast-tracked the 435-km long high-speed rail (bullet train) corridor between Mysuru-Bengaluru-Chennai. NHAI will acquire land to lay tracks for high-speed trains along the greenfield expressways for Read More ...

RBI infuses ₹5,000-cr in National Housing Bank

The Reserve Bank of India (RBI) has extended an additional liquidity facility (ASLF) of ₹5,000 crore to National Housing Bank (NHB). It is over and above ₹10,000 crore already provided for supporting the housing Read More ...
NBM&CW

New Building Material & Construction World

New Building Material & Construction World
MGS Architecture

Modern Green Structures & Architecture

Modern Green Structures & Architecture
L&ST

Lifting & Specialized Transport

Lifting & Specialized Transport
II&TW

Indian Infrastructure & Tenders Week

Indian Infrastructure & Tenders Week