Katerra's First Fully-integrated Off-site Manufacturing Plant in Hyderabad

Principal Secretary to Govt  of India
Katerra, a leading design and technology driven global construction company, broke ground on its first fully integrated off-site manufacturing plant at Hyderabad. Projected to get completed by March 2020, the factory will deliver 8 million square feet of building components every year through robotic assembly line production. The ground-breaking ceremony was attended by Mr. Ash Bhardwaj, President Asia and Middle East, Katerra, Mr. Nejeeb Khan, Head Design & Business Strategy in India, Katerra and Mr. Ravi Bhat, Head of Operations, India and Middle East, Katerra.

After setting up factory campus at Krishnagiri, Tamil Nadu and a movable onsite factory in Lucknow, this will be Katerra's second state-of-the-art, automated factory in India. The factory will help bring Katerra's unique global technology solutions to construct residential projects, commercial office buildings, hotels, malls, hospitals, schools and industrial parks across Telangana State.

Commenting on the ground-breaking of the factory, Mr. Ash Bhardwaj, President Asia and Middle East, Katerra, “Today, every other MNC wishes to have their presence in India which indicates that there will be huge requirement for offices and tech parks across the country in the coming years. Alongside, the need for technology driven construction in retail, housing, education institutions and hospitals will also rise in India owing to growing urbanization. Thus, technology driven offsite manufacturing will help catering to this demand by reducing delivery time by up to two-third, thereby speeding up the construction process. Apart from our factory at Krishnagiri near Bangalore, we now have a factory in Hyderabad to service our clients in the Southern part of India. Going forward we have plans to invest in setting up factories in the Mumbai-Pune region in the later part of the year, followed by a plant in NCR to cover the North market.”

Katerra's cutting-edge technology offers a diverse range of benefits in the construction space as the end products are durable, sustainable, better designed with speedy process and precision. Committed to follow sustainable practices, Katerra consumes 30% less water and materials across all its projects. The factory manufactured and assembly onsite approach ensures minimal dust pollution and waste on-site and other resources with zero waste production. Katerra will also provide end-to-end building services ranging from completed 3D rooms, walls, beams, columns, hollow core slabs, double walls, modular MEP and plug and play bathroom pods.

Katerra Factory

Katerra is poised to create over 1,000 jobs and over 7,000 additional jobs across various jobsite and auxiliary services. In addition to that, Katerra will also set up vocational training centre to upskill the workforce and will focus on providing them technical training with an aim to help them build long-term careers.

Sharing his insights on the need for technology driven construction in India, Mr. Nejeeb Khan, Head Design & Business Strategy in India, Katerra, “Across the globe, Data Driven Design, Design for Manufacturing and Assembly (DFMA), Modular Construction, Offsite Manufacturing, Intelligent Buildings and Construction Software are gaining prominence in order to construct faster and better structures. Through Katerra, we are introducing such new and innovative solutions in India that need to be adapted to cater to the country's growing demand for overall infrastructure development. We believe, India has a tremendous potential of replicating some of the global construction models and build beautiful structures in both commercial and residential sectors.”

A Silicon Valley technology driven, offsite construction start-up, Katerra has grown rapidly since 2015. Today, the company has over 6000 employees, 6 operational factories and 700+ projects in progress across India and America. Katerra has strong business plans to rapidly expand its operations in the Indian market aiming to revolutionize its construction sector by introducing advanced global practices.

JCB Group appoints Deepak Shetty as Dy. CEO & MD in India

The JCB Group has announced the appointment of Deepak Shetty as Deputy CEO and MD of JCB India. He has been with JCB for over 10 years in various leadership roles. He takes over the new assignment after having been Read More ...

Railway floats tender for ₹142-cr bridge in UP

To ensure smooth flow of train traffic on the Jhansi-Manikpur section in UP, North Central Railway has floated tender for the construction of two bridges on this stretch. The scope of work involves the construction of Read More ...

Embassy Parks fixes ₹1,500-cr realty space on radar

Embassy Office Parks REIT has decided to invest ₹1,500 crore over a period of time to add 2.6 million square feet of commercial space into its portfolio of 26 million square feet of operational office space. This additional Read More ...

India plans 13th Japanese industrial townships in Assam

To promote domestic manufacturing and strengthening economic ties between the two countries, India has decided to set up the 13th Japanese industrial township in Assam. Secretary in the Department for Promotion of Industry Read More ...

LiuGong India Appoints New President & Sr. Vice President

LiuGong India announced the appointment of A Krishnakumar as the new President – India effective July 2020 and Alok Jha as new Sr. Vice President – Sales & Marketing effective August 2020. A Krishnakumar brings with Read More ...

BMRCL launches ₹30,695-cr Phase-II of metro rail venture

The Bangalore Metro Rail Corporation has launched the tunnelling work on the Phase-II of the metro project involving an investment of ₹30,695 crore and the CM has set in motion the work by one Tunnel Boring Machine (TBM.) Read More ...

Dilip Buildcon bags ₹1,140-cr highway contract

Dilip Buildcon has bagged a road and highway project worth ₹1,140.50 crore in Telangana. The company has been declared as L-1 bidder in the tender floated by the National Highways Authority of India. The project, having Read More ...

NHAI invites bids for road linking Gurgaon-Mumbai expressway

To accelerate the construction work for the extension of Gurgaon-Mumbai expressway to DND Flyway in Delhi, NHAI has bid out first two packages from DND to Ballabhgarh where the work is scheduled to complete by mid-2023. NHAI Read More ...

Decks cleared for Metro Line 4 in Mumbai

Decks have been cleared to start the construction work on the Metro Line-4. The Bombay high court (HC) has allowed Mumbai Metropolitan Region Development Authority (MMRDA) to cut 357 mangroves for the construction Read More ...

KEC International wins ₹1,192-cr multiple contracts

MD and CEO Vimal Kejriwal informed that the RPG firm KEC International has won contracts worth ₹1,192 crore across its business segments in the domestic and international arena. The engineering firm has secured ₹821 Read More ...

NHAI steers ₹4,000-cr Chandigarh-Ludhiana NH project

NHAI has cleared a ₹4,000 crore project that includes faster connectivity to Chandigarh from Ludhiana. Ministry of Road Transport and Highways informed that this will be part of the upcoming Delhi-Amritsar-Katra Expressway Read More ...

MoRTH speeds up 401-km four-lane new NH project

The National Highway Authority of India has fast-tracked the project of building 401-km long four-lane highway project crisscrossing Andhra Pradesh and Chhattisgarh. The new road covering 90 km of length in Vizianagaram district Read More ...

AP unveils ₹16,000-cr metro corridor along coastline

The state government in Andhra Pradesh is contemplating to launch a metro rail on the Visakhapatnam coast at an investment of ₹16,000 crore. The DPRs for light metro rail and modern tram corridors is being prepared by the Read More ...

KMDA kick-start ₹600-cr flyover at Ruby crossing

Kolkata Metropolitan Development Authority (KMDA) has hastened the construction work of the 12m high flyover on an elevated corridor at Ruby crossing at an investment of ₹600 crore. The design for the six-lane Ruby flyover Read More ...

Mysuru-Chennai high-speed rail on the anvil

The railway has fast-tracked the 435-km long high-speed rail (bullet train) corridor between Mysuru-Bengaluru-Chennai. NHAI will acquire land to lay tracks for high-speed trains along the greenfield expressways for Read More ...

RBI infuses ₹5,000-cr in National Housing Bank

The Reserve Bank of India (RBI) has extended an additional liquidity facility (ASLF) of ₹5,000 crore to National Housing Bank (NHB). It is over and above ₹10,000 crore already provided for supporting the housing Read More ...
NBM&CW

New Building Material & Construction World

New Building Material & Construction World
MGS Architecture

Modern Green Structures & Architecture

Modern Green Structures & Architecture
L&ST

Lifting & Specialized Transport

Lifting & Specialized Transport
II&TW

Indian Infrastructure & Tenders Week

Indian Infrastructure & Tenders Week