Six kms long tunnel project up for grab

    Ahmedabad Metro Tunnel Project
    The Ahmedabad metro rail project is all set to float tenders for the construction of the 6.335 km long underground tunnel and that the design for the project has already been finalized, said sources adding that the stretch, which will be a part of Shahpur to Apparel Park (Kankaria) route of Metro project, will have four stations at Kalupur railway station, Kankaria, Shahpur and Gheekanta, said Metro Link Express Gandhinagar-Ahmedabad (MEGA) sources, claiming that the designs of the tunnel, stations and other minute details have been approved, and the department will soon start the construction of the tunnel after meeting the mandatory requirements and that the AMC will also award the contracts for work from APMC to Jivrajpark and from Ranip onwards. Further the work between Apparel Park and Vastral has already begun, said Metro officials of the North-South corridor, which is from Vasna to Motera with 15 stations in the 18.50-km elevated corridor, while the East-West corridor, from Thaltej to Vastral, which is 19.43 km, will have 6.335 km underground. The East-West corridor will have four stations underground and 13 on the elevated corridor.
    CURRENTLY ONLINE
    We have 288 guests and no members online

    NBM&CW

    New Building Material & Construction World

    New Building Material & Construction World
    MGS Architecture

    Modern Green Structures & Architecture

    Modern Green Structures & Architecture
    L&ST

    Lifting & Specialized Transport

    Lifting & Specialized Transport
    II&TW

    Indian Infrastructure & Tenders Week

    Indian Infrastructure & Tenders Week